Transcript and Presenter's Notes

Title: Project Review


1
Project Review
  • University Commons
  • Georgia State University
  • Atlanta, Georgia
  • George Spence
  • Metromont Corporation

2
University Commons
Metromont Corporation Hiram, GA
Plant Erection Completed January
2007 Project Opened August 2007
3
Project Details
  • Building Type
  • 2,000 bed
  • University Dormitory
  • Location
  • Atlanta, Georgia
  • Stories
  • 9, 10, 12, 16 in four wings
  • Square Feet of Space
  • 778,000 s.f. floor
  • 375,000 s.f. wall panel
  • CarbonCast Product
  • Insulated Wall Panel, R-12
  • 8-1/2 inches thick
  • C-Grid connecting 2 wythes
  • Owner
  • GSU Foundation
  • Architect Firm
  • Niles Bolton Architects
  • General Contractor
  • Hardin Construction
  • Engineering Firm
  • Browder LeGuizamon
  • Erector
  • Precision Stone

4
Situation Analysis
  • Owner Needs/Requirements
  • University needed student housing open by the
    summer of 2007, started plans in summer 2005
  • Why precast was preferable?
  • Favorable costs compared to alternates
  • Improved job schedule, saved six months
  • Better insulation R-Value, R-12 vs. R-7.1
  • Reduced mold and mildew risks

5
Situation Analysis
  • What special needs did CarbonCast products
    fulfill?
  • The structural frame of the building was designed
    for brick veneer, so the precast panels had to
    stay below 60 psf. This was achieved with the use
    of C-Grid tying the two wythes together
  • An R-12 with continuous insulation was achieved
    with the C-Grid design. This allowed the
    mechanical system equipment to be down-sized,
    saving 700,000 in initial investment

6
Sales Process
  • How were you made aware of the project?
  • Hardin Constructions project manager called for
    help on a budget and schedule problem with the
    project. It originally was designed with a brick,
    metal stud wall system.
  • Competition
  • The primary competition was the alternate
    brick/stud wall system. Stucco was also
    considered. The contractor invited Gate Precast
    and Metromont to bid the precast alternate.
  • Describe the early meetings
  • Meetings were held at the architects office with
    all the design team present architect, engineer
    of record and the general contractor
  • How were decisions made?
  • The design team considered our proposal, then
    consulted with the owner before final decisions
    were made.

7
Sales Process Continued
  • How were you able to influence decisions?
  • The C-Grid insulated wall panel offered better
    costs, faster schedule, better R-Value
  • What challenges were encountered?
  • The University was reluctant to try what it
    considered a new product on this project
  • How were challenges dealt with?
  • Engineering and test data were submitted and
    examples of finished project with C-Grid panels
    were reviewed

8
Technical Challenges
  • Challenges
  • The biggest challenge was to convince the
    University to accept the C-Grid panel design
  • Solutions
  • Once the Owner realized the precast panel greatly
    reduced the risk of mold and mildew, the many
    other advantages of the C-Grid insulated wall
    panel were accepted and approved

9
Lessons Learned
  • What could have been done to make the process
    more effective?
  • Having more test data available initially
  • How could the process be improved?
  • The punched window opening used a wood block-out
    to terminate the insulation and provide a nail
    strip for the window attachment. A better way
    needs to be devised.

10
Drawings Photos
  • Typical Panel Shop Ticket

11
Drawings Photos
  • Panel Section

12
Drawings Photos
  • Panel Section Detail

13
Drawings Photos
  • C-Grid Placement

14
Drawings Photos
  • Aerial view of construction, showing two tower
    cranes used to erect precast

15
Drawings Photos
South Elevation And Courtyard
  • South West Elevation

16
Drawings Photos
  • North Elevation West Elevation

17
Drawings Photos
  • East Elevation

18
Drawings Photos
  • Southeast Elevation

19
Drawings Photos
  • 2,500 Panels

20
Drawings Photos
  • Interior Courtyard Detail

21
Drawings Photos
  • Front Entry, brick veneer on precast

22
Drawings Photos
Window Detail
  • Brick veneer
  • used at street level

23
Drawings Photos
Interior Window Detail
  • Typical Bedroom

24
Drawings Photos
Typical Living Room Suite for 2 or 3 bedroom
unit
  • Common Lounge Area

25
Drawings Photos
  • Corner
  • Detail

26
Questions?
  • Thank You