Title: Neutrino Factory Design Study
1Neutrino Factory Design Study
- Introduction
- World Design Study status
- EC Framework 6 Design Studies
- Neutrino Factory Superbeam Design Study
2Introduction
Two feasibility studies so far in US
- FS 1 FNAL ? performance not good
enough ? too expensive - FS 2 BNL ? performance good enough
? still too expensive - FS 3 RAL? - Take FS2 and reduce
cost - A lot of progress already made
One feasibility study in Japan - based on
FFAG - produced in 2002
Zero feasibility studies in Europe
3Introduction
- Before/during NuFact03 time for 3rd Design
Study - Should be world-wide this time
- Parallel discussion and plenary talk
- Steering group created US Steve
Geer Bob Palmer Mike Zisman - Japan Yoshi Kuno Yoshi
Mori Kenzo Nakamura - Europe Alain Blondel Rob Edgecock
(chair) Helmut Haseroth - Three (phone) meetings so far
4WDS Status
- Propose to create 6 sub-collaborations
- Steering Groups being proposed (for those
without one)
5EC FP6 Design Studies
FP6 3 blocks of activities
Transnational Access
Design Studies
Integrating Activities
Accompanying Measures
Communication Network Development
Construction of New Infrastructure
6FP6 Design Studies
- HIPPI JRA improving existing infrastructure
Design Studies
- FS and TPW on new infrastructures
- Clear European dimension and interest
- Must systematically explore EIB and Structural
Funds - Infrastructure can be outside EU, if EU
participates - Upgrade to existing infrastructure, if replaces
new
7FP6 Design Studies
Feasibility Studies
will aim at laying the conceptual foundations of
a potential new or enhanced infrastructure. This
could consist in the basic feasibility study of a
specific new facility or in exploring a new
fundamental technology or technique underpinning
a whole new concept. Alternatively, a feasibility
study could cover the detailed engineering design
of a proposed infrastructure, in particular in
relation to its most technologically advanced
aspects (i.e. excluding the detailed design of
standard elements of the new infrastructure).
Technical Preparatory Work
will cover the development and testing of
components, subsystems, materials or techniques
(including dedicated software) that are critical
for the future development of a new or enhanced
infrastructure. Support will however not be
provided for preparatory work based on existing
or proven techniques or technologies, nor when it
aims at reproducing available components or
materials.
NB Contributions to capital investments are
excluded
8FP6 Design Studies
Funding
- In first call 70M
- EC contribution/DS 1-10M
- Maximum EC contribution 50
- Total cost has to be justified in proposal
- Duration of DS 24 to 48 months
Timescale
Call for proposals 11th November Submission
deadline 4th March 2004, 5pm Evaluation/intervie
ws June 2004 Results July 2004 Contract
negotiations end September 2004 DS start end
2004/start 2005
9NF FP6 Design Study
10Steering Group
Director Ken Peach Coordinator Rob
Edgecock Japanese representative ? US
representative Mike Zisman Proton
Driver Roland Garoby Chris
Prior Targetry Roger Bennett ? MICE
Alain Blondel ? FFAGs Francois
Meot ? Design Engineering Helmut
Haseroth Vittorio Palladino Physics Pil
ar Hernandez Mauro Mezzetto
11Timescales
Form Steering Group Today
Form Work Package teams Today
Work Package teams formed 28th November 2003
1st plans/WP 11th December 2003
Firmed up plans, outline of 24th December 2003
proposal, 1st cost and schedule
Start writing final version 15th January 2004
Final editing starts 12th February 2004
Finish proposal 19th February 2004
Submit proposal 4th March 2004, 5pm!
12Funding
- Assume DS will be 4 years ? end 2008
- Can get 10M from EC
- Must find at least the same from existing
sources - Need to check FP6 rules, e.g. MICE beam and inf?
- Third party funding?
- Matching funding/Work Package or total?
- Need to check what capital investments are
- Within these limits, there are no limits!
13Next Steps
Get approval of plans from EMCOG - RE Get
approval from ESGARD - RE Contact with
Brussels - RE Determine requirements at
RAL - PRN/RE Form Steering Groups - RE et
al Form teams - SGs Develop plans for
proposal - All
All must start now!