Title: SolarB Science Working Group


1
Solar-B Science Working Group
February 3,2003 Larry Hill NASA Solar-B Project
Manager
2
EIS Components
Spectrometer Entrance Filter
Grating Assembly
Slit/Slot Assembly
  • Optics have been coated and tested
  • 2 of 3 opto-mechanical assemblies in final
    testing
  • Electronic boards assembled, in test

3
X-Ray Telescope
  • Tube completed, internal harnesses installed
  • Assembly level bakeout completed
  • Optic being polished at Goodrich
  • Tube completed, internal harnesses installed
  • Assembly level bakeout completed
  • Mechanisms being assembled
  • Optic being polished at Goodrich

4
Focal Plane Package
  • Structure received, heaters and cables installed
  • SpectroPolarimeter elements currently being
    installed
  • Majority of optical subassemblies ready for
    installation
  • Tunable filter being assembled

5
MODA Expectations
  • US committed to support Solar-B MODA
  • MODA budgets are adequate and competitive for
    extended mission phases
  • Need to consider methods to minimize operation
    costs to increase science return on investment
  • Questions to be finalized
  • Data downlink
  • Data distribution and archiving
  • Operations Staffing Plans, near and long term
  • Implementation of Coordinated Science Planning
  • Near Term Activitites
  • Define elements necessary to support EIC/MIC

6
Action Items
  • MODA Team
  • Explain in more detail the functions of the
    schedule coordinators and the members of the
    Solar-B team in establishing inputs into the
    monthly planning meeting.
  • Define the distinction between observations and
    research topics in fencing off data.
  • Quantify the personnel from each team and each
    country to support daily operations.
  • Define the requirements for the level 0
    reformatter and who should be responsible for the
    software.
  • Increase the level of detailed requirements and
    interface definition for each of the operations
    software elements.

7
Action Items (2)
  • Matsuzaki
  • Can we schedule evening uplinks? Establish the
    time required to prepare the uplink once the
    OP/OG is formulated.
  • Davis
  • Define the concept proposed for the NASA GI/GO
    program