Title: U.S. Army Field Support Command
1U.S. Army Field Support Command
ARMY MATERIEL COMMAND COMBAT EQUIPMENT
GROUP-AFLOAT (CEG-A)
AWRP AMC Execution Plan Briefing 2 July 2002
2Agenda
- Operations Event Timeline Update
- IPR Schedule
- Critical Events Timeline Update
- Top Ten AWRP Actions / Issues
- Resource Update
- Strong Virginian American Cormorant Download
- YND Rock Drill
- Summary
3Operations Event Timeline
AC D/L
SV D/L
HQDA Implementation Msg
Force Protection (Draft)
7
7
Target YND Site Established
16
Release American Cormorant
8
YND Soil Analysis
8
Embassy Approval
3
3
10
Hythe Branch Plan?
4
Strong Virginian Decision
DA OPLAN Published (Draft)
20
HQDA OPORD / Movements Directive (Still Pending)
?
5
DA Funding
6
CENTCOM Site Survey
9
10-11
20-26
4AWRP IPR / VTC Schedule (Updated as of 2 JUL 02)
- CEB-H Internal IPRs (weekly) start 12 FEB
- AMC CEG-A IPR (VTC) (Monthly 2nd week) 13 FEB
- DA AWRP IPR/Conference (Orlando, FL) 20 FEB
- FSC IPR (VTC) (Monthly 4th week) 27 FEB
-
- Working Group IPR at YND, Japan 12-15 MAR
- DA AWRP IPR (VTC) 21 MAR
- DA AWRP IPR at CEG-A 22-23 MAY
- ARCENT Contingency IPR at Fort McPherson 4-6
JUN - DA AWRP IPR (VTC) 2 JUL
- DA AWRP IPR at YND 6-8 AUG
5AWRP Critical Events 2QFY02
6AWRP Critical Events 3QFY02
7AWRP Critical Events 4QFY02
8Top Ten AWRP Issues / Actions
ISSUE STATUS
1 MOA (AMC / USARPAC)
2 17th ASG ISA
3 Equipment Procurement
4 COSIS Contract Award
5 YND Environmental Review
6 YND LOAD Bearing Study
7 DAC Selections
8 YND Rock Drill Planning
9 SV / AC Download Planning
10 Dredging / Soil analysis at Site 4
AMBER
AMBER
RED
AMBER
AMBER
AMBER
AMBER
GREEN
GREEN
AMBER
- LEGEND
- Will not meet the final objective
- May miss intermediate objective / event but
will meet final objective - Will meet final objective
RED
AMBER
GREEN
9AWRP Funding Update
- Surplus Funds (as of 30 Jun 02)
- 170.4K
- 100K Power Design
- 11K Fuel Boom
- 4K Shelving
- 55K Manpower
- UFRs (as of 30 Jun 02)
- TBD - Potential Impacts of Load Bearing Study
- TBD - Temp MLC Cost
- 60K est. SDT
- TBD MTMC - 100K in program may be
insufficient
10Concept of Operation SV AC Download
- Concept of Operation
- This is a 4 phase operation
- Phase 1 Establish YND site
- Began with the YND site survey in 4QFY01 and
ends with actions complete to receive watercraft
UICs on 16 AUG 02 - Phase 2 SV download
- Begins with the departure of the SV from CEB-H
in JUL 02 and ends when all equipment is
offloaded and positioned at YND and Sagami Army
Depot in SEP 02 - Phase 3 AC download
- Begins with the departure of the AC from DG
enroute to YND and ends when all equipment is
offloaded and positioned at YND and Sagami Army
Depot in SEP 02 - Phase 4 Transition to End state
- Begins with the DL of the SV and ends when all
equipment is stored in final locations DH
equipment is installed COSIS contractor is
on-site
11YND Rock Drill (6-8 Aug 02)
- Key Participants
- DA
- AMC
- OSC / FSC (AT/FP Ops)
- CEG-A (Ops)
- CEB-H (Lead)(Ops / OPP Leader)
- CEB-NEA (AWRDS)
- Stanley INC
- USARPAC
- USARJ
- 17th ASG
- 35 SS BN
- FORSCOM
- 7th TC GRP
- MSC
- MTMC
- 836th TC BN
12Summary
- 49 Days to SV download at YND
- Key Events HQDA AWRP IPR (including FSC YND
Rock Drill) - 6-8 AUG 02
- Must immediately resolve all issues potentially
impacting DL and storage of watercraft IAW
timeline - MOA / ISA
- Equipment Procurement (DH Mooring Access
Equip) - COSIS Contract Award
CONTINUES TO BE A GOOD NEWS STORY Considerable
effort to meet end state objectives by all
commands
13Back Up Charts
14MOA (AMC / USARPAC)
-
-
- Status
- Issue.
- MOA required for AMC mission at YND, Sagami
Army Depot, and US Army Ammunition Depot/Akizuki -
- Discussion.
- Initial draft MOA developed during MAR 02 IPR
at USARJ - USARPAC provided signed MOA to HQAMC 12 Jun
(significant revisions without staffing with AMC
) - FSC draft MOA complete (27 Jun)
- Timelines MAY NOT meet requirements prior to
personnel / equipment on-site -
- Recommendation. That the MOA accurately
reflects current HQDA regulations and directives -
- LEAD USARPAC POC Mr. D.R. Brown, USARPAC
- Mr. Butch Boyett, AMC
AMBER
1517th ASG ISA
-
-
- Status
- Issue.
- ISA completion dependent on MOA finalization
and signature - Discussion
- Draft ISA developed between 17th ASG and AMC
LNO - Draft ISA being staffed through CEB-H/AMCCEG-A
- Timelines MAY NOT meet requirements prior to
personnel / equipment on-site - Recommendation. That the MOA accurately
reflects current HQDA regulations and directives - LEAD USARJ (17th ASG) POC Mr. David
Brown, 17th ASG - Mr. J Kirby, AMCCEG-A
-
AMBER
16Equipment Procurement
-
-
- Status (once contracts awarded will move to
AMBER) - Issue.
- Equipment to dehumidify, moor and gain access
to prepositioned watercraft in forward storage at
YND may not be procured prior to the arrival of
the SV/AC - Discussion
- Initial List of Specs/Dwgs provided Mar 02
- Finalized List of Specs/Dwgs provided Apr 02
- PR Cs prepared and submitted to 374th Cont
Squadron for procurement May 02 - IBOP forms submitted for D/H and Fenders
- IBOP on D/H rejected by 374th CS
- All procurements pending no contracts to date
- Lead times extended for most of this equipment
-
- Recommendation. Continual pressure from HQ
leadership required to ensure this equipment is
procured prior to downloads -
- LEAD USARJ / 374th Contracting SQRDN POC
RED
17YND Environmental Review
-
-
- Status
- Issue.
- An Environmental Review required to access
impact of storing APS watercraft at YND - Discussion
- Issue was addressed during AUG 01 site survey
at YND and USARJ IPR in Mar 02 - USARJ stated this was not an issue
- FSC required written verification to ensure
watercraft storage, and COSIS operations,
complies with existing environmental laws - No Valid EA/R available
- USARJ determined ER is required for storage and
supplemental ER for dredging -
- Recommendation.
- Ensure ER for watercraft storage is kept
separate from the SER for dredging. Amend COSIS
contract if required based on final ER -
- LEAD USARPAC POC LTC Cromby USARJ DCSEN
AMBER
18YND Load Bearing Study
-
-
- Status
-
- Issue.
- USARJ requested a load bearing survey be
initiated at YND to access impact of watercraft
dry storage - Funding not identified
- Discussion.
- Issue was addressed during site survey in Aug
01 and USARJ IPR in Mar 02 - USARJ did not identify this as a requirement
- Last load bearing study carried out 15 years
ago - Without study DPW cannot ensure that no damage
will result from the storage of AWRP equipment - Land cradle have been design to reduce /
eliminate potential problems - DA reprogrammed . Contract funded and in
execution. -
- Recommendation.
- CEB-H design land cradles to significantly
reduce / eliminate load issues and develop
alternate storage location COAs - USARJ expedite completion of load bearing study
AMBER
19COSIS Contract Award
-
-
- Status
- Issue Award of COSIS contract extended to 23
Sep 02 -
- Discussion
- RFP issued May 02 revision issued 14 Jun 02
- No contractor participation at site visit
mid-Jun or Pre-Proposal Conference 21 Jun - Contractors expressing interest but requesting
additional time - OSC contracting submitted revised dates of
- Proposal due date to 25 Jul
- Conduct proposal evaluations 26 Jul - 13 Sep
- Source Selection decision evaluation 16-20 Sep
- Revised target award date is 23 Sep
-
- Recommendation.
- Extend proposal due date to 25 Jul 02with
contract award 23 Sep. Develop Temp MLC as
bridge between download and contractor on-site
date.
AMBER
20Dredging / Soil Analysis at Site 4
-
-
- Status
- Issue Dredging at Site 4 Required for permanent
mooring of 10 x LCU2000s - Discussion
- Site 4 dredging depth insufficient to store
10xLCU 2000s - Two soil analysis at site 4 are inclusive
(insufficient number of samples and insufficient
depth of samples) - Further testing will be required to meet
dredging depth requirements - If dredging of site 4 cannot be completed,
temporary location at site 3 may become permanent - Dredging is unfunded
-
- Recommendation USARPAC expedite soil sampling
/ environmental actions necessary to program /
fund / execute dredging - LEAD USARJ POC Mr. Noah
AMBER
21DAC Selections
-
-
- Status
- Issue.
- Recruitment process for the 3 x DACs has
extended beyond projected timelines - Discussion
- DAC management team consists of a Logistics
Manager (GS13), Contract Specialist (GS12), and a
QA Ship Surveyor (GS12) - Job descriptions, recruitment packages
completed (30 day slip) - Selection lists contain adequate qualified
applicants to fill positions - Selection panels on-going
- Selections scheduled for NLT 16 Jul
- Team projected on-site 16 Sep (60 day PCS)
-
- Recommendation.
- Continue with adjusted schedule
- Maintain LNO and CEB-H personnel on-site
AMBER
22YND Rock Drill
-
-
- Status
- Issue.
- Developing YND Rock Drill
- Discussion
- Preliminary planning and training aid
development on-going - SV and AC OPORDs (draft) completed
- OPORD staffing on-going
- Final concept briefing 8 JUL
- Recommendation.
- NA
- LEAD AMC (CEB-H) POC Tom Ferguson, CEB-H
CEA - Ivor Edwards, Operations
GREEN
23Strong Virginian / American Cormorant Download
Planning
-
-
- Status
- Issue.
- Development of SV and AC OPORDs for DL at YND
- Discussion
- Draft OPORDs complete
- Staffing on-going
- Final OPORD to be published pending release of
HQDA AWRP OPORD 2002-XX, Feb 02 - Recommendation.
- NA
- LEAD AMC(CEB-H) POC Tom Ferguson, CEB-H
CEA - Chris Gill, Operations
GREEN