Title: Sago Mine Disaster
1 Sago Mine Disaster January 2-4 2006
What Happened Then Where is Mine Safety
Today? UC Education and Research Center
2Source WVOMHST, Sago Report, 2006.
3Sago Mine Background
- Opened August 1999. Operator BJM Coal
- Coal production (2000) 735,000 tons
- Closed 2002 2003
- Reopened 2004
- Sold to Anker Acquired by ICG in 2005
- Coal production (2005) 507,000 tons
- Injury Incidence Rate (2005)
- 5.68 US rate (nationally Ug Coal)
- 15.90 per 100 workers (Sago)
4MSHA Presence at Sago in 2005
- 4 quarterly inspections
- 12 other inspections or investigations
- 2 technical investigations roof and ventilation
- 7 non-injury roof fall investigations, including
- Nov 7, 2005 Continuous miner operator seriously
injured in roof fall
5(No Transcript)
6Immediate Aftermath
- Jan 4 MSHA announces investigation team
- Jan 9 WV Gov. Manchin asks McAteer to lead
investigation - State MSHA announce public hearing
- Jan 12 WV Gov. Manchin appoints 6 legislators to
investigation panel - Jan 17 MSHA State begin interviews
- Jan 19 Aracoma/Alma belt fire kills 2 miners
7January 23
- US Senate Hearing
- WV Legislature Passes Mine Safety Bill
- Supplies of SCSRs
- Wireless, person-worn communication and tracking
- 15-minute notification to State call center
100K penalty for failing to comply
8Aftermath
- Jan 25 MSHA Fed Reg request for information on
tracking, communication and refuges - Jan 31 Nomination hearing R.Stickler
- Feb 1 MINER Act bills introduced in Congress
- Feb 10 WV asks NIOSH to test Omega block for
explosion resistance
9Technically, the label on this illustration is
not correct neither MSHA nor Bureau of
Mines/NIOSH ever said this is an explosion
proof seal they called it explosion resistant
Depiction of a Mitchell-Barrett seal
10May 2006 Sago public hearing Dan Merideth,
Davitt McAteer, and Russell Bennett display an
Omega block.
11All 10 seals completely destroyed
In-Mine Investigation
Photo No 1 Seal
- Inadequate seal between Omega block and BlocBond.
- No BlocBond was observed in the vertical joints.
12SEALS
Seals were not constructed according to required
specifications. Two of 10 exceeded dimension
maximums (20 X 8) No. 1
Seal was 21.7 X 8.9 and No. 2 Seal was 20.4 X
8.7 One seal was not set back at least 10 feet
from the corner of the pillar. Physical and
witness evidence that BlocBond was spread on the
mine floor dry as a base.
Vertical joints were not coated with at least ¼
inch thick BlocBond. Wedges were driven parallel
to the wood planks rather than perpendicular.
13Explosion Testing of Omega Block Seals
- Properly constructed 40 inch Omega block seal
withstood 51-psi explosion - Sago-simulated built seal withstood 21-psi.
- A 93-psi explosion to the Sago-simulated built
seal caused substantial damage, but not as severe
as the damage observed at the actual Sago mine
seals
NIOSH, Lake Lynn Experimental Mine, Report date
Feb 2007
14Aftermath
- Jan 25 MSHA files for a temporary restraining
order in federal court against ICG subsidiary for
failing to allow UMWA to participate in
investigation as miners rep. (Granted on Jan.
26) - Jan 25 MSHA Federal Register
- request for information on tracking,
- communication systems and safety refuges
15Aftermath (Feb-March 06)
- Jan 25 MSHA RFI tracking/comm and refuges
- Jan 31 Nomination hearing R.Stickler
- Feb 1 MINER Act bills introduced in Congress
- Feb 10 WV asks NIOSH to test Omega blocks
- Feb 13 US House hearing on mine safety
- Feb 15 MSHA proposes increase in penalties
- Feb 28 WV Gov appoints Taskforce to assess
communication, other safety equipment
16Aftermath (Feb-March 06)
- March 1 US House hearing on mine safety
- March 2 US Senate hearing on mine safety
- March 9 MSHA issues ETS on mine evacuation
- March 14 Intl Coal Group announces findings
- explosion ignited by lightning
- March 15 Sago mine resumes operation
- March 27 NIOSH examines recovered SCSRs
17Randal McCloy, Jr. Lone Survivor of the 2nd
Left Crew
- March 30 Randal McCloy leaves hospital
- Shown here with daughter Isabel. Randal
McCloy and his wife Anna welcomed their third
child, Isaac Martin McCloy, in April 2007.
18Aftermath (April 06)
- March 30 Randal McCloy leaves from hospital
- April 11 Families receive copies of interview
transcripts - April 20 WJU hosts symposium
- April 24 MSHAs public hearings on ETS on mine
evacuation - April 26 Randal McCloy gives letter to Sago
families
19April 26 Confidential Letter from Randal McCloy
to
- Families and Loved Ones of my Co-Workers,
Victims of the Sago Mine Disaster - I do not recall whether I had started work, nor
do I have any memory of the blast. - I do remember that the mine filled quickly with
fumes and thick smoke and that breathing
conditions were nearly unbearable.
20Randal McCloys Letter (April 26, 2006)
- The first thing we did was activate our rescuers
as we had been trained. At least four of the
rescuers did not function. - Shortly thereafter We attempted to signal our
location to the surface by beating on the mine
bolts and plates. We found a sledgehammer, and
for a long time we took turns pounding away.
21Randal McCloys Letter (April 26, 2006)
- We had to take off our rescuers in order to
hammer as hard as we could. This effort caused
us to breathe much harder. - We never heard a responsive blast or shot from
the surface. - We were worried and afraid, but we began to
accept our fate.
22Randal McCloys Letter (April 26, 2006)
- We prayed a little longer, then someone
suggested that we each write letters to our loved
ones. - I wrote a letter to Anna and my children. When
I finished writing, I put the letter in Jackie
Weavers lunch box, where I hoped it would be
found.
23Self-Contained Self-Rescuers (SCSRs)
- Operators records show NO required 90-day test
for units, including six Sago miners. - One unit expired (10 years).
- NIOSHs post-hoc lab examination all
produced O2 - Remember Maximum capacity is 1 hour
Anderson, Bennett, Bennett, Groves, Hamner,
Toler Jones NIOSH Report Sept 2006
24May 2-4 Five Month Anniversary Three-day
Public Hearing, Wesleyan College
25May 2-4 Five Month Anniversary Three-day
Public Hearing, Wesleyan College
26May 2-4 Five Month Anniversary Three-day
Public Hearing, Wesleyan College
Bill Tucker, Debbie Groves Shelly Rose
Ron Hixson
27Aftermath (May 2006)
- May 12 WV imposes moratorium on Omega block-seal
installations begins review of all seals - May 22 MSHA announces moratorium on alternative
seal installations requires testing atmosphere
behind seals - May 29 WV Taskforce issues report
- Recommends written plans for communication
tracking by Aug 2007 - Suggests 30-min maximum for current SCSRs caches
underground by Aug. 2006.
28McAteer, July 2006
WVOMHST, Dec 2006
MSHA, May 2007
UMWA, March 2007
29McAteer Report, July 06 (6 months)
- Distinguishes cause of Explosion and Disaster.
What might have happened if - Explosion contained in sealed area
(explosion-proof seals) - SCSRs worked for the miners
- Rescuers and miners could have communicated with
each other - Gas chromatograph arrived sooner than 8 hours
after explosion - Mine rescue operations had allowed expedited
procedures - Miners had known MSHAs seismic equipment was
obsolete - It had not been a federal holiday
30McAteers 12 Recommendations
- Research adopt lightning protection measures
- Ban use of Omega blocks
- Strengthen existing seals
- Evaluate seal standard
- Require refuge chambers
- Conduct review of SCSRs
- Develop comprehensive emergency response plans
- Give miners 2-way communication
- Require tracking systems
- Review WVs mine rescue system
- Require installation of lifelines
- Expand RD and manufacturing opportunities in WV
for HS technology
31MSHAs WVs Investigations
- Included
- 80 transcribed interviews
- Collecting physical evidence and photographing
mine interior - Mine mapping (see next slide)
32(No Transcript)
33(No Transcript)
34(No Transcript)
35MSHAs WVs Investigations
- Included
- 80 transcribed interviews
- Collecting physical evidence and photographing
mine interior - Mine mapping
- Team did not go underground until Jan. 26 (needed
boreholes, dewatering, and ventilation restored)
36MSHAs States Investigations Probable Causes
of Explosion
- Open flame
- Spontaneous combustion
- Roof fall-triggered explosion
- Mine electrical systems
- Lightning
37WVMHST Report, December 2006
- "This represents the final report of the Agency
on this matter. You may note as you read the
report that all questions may not be answered.
The Investigation Team recognizes this and
continues to seek those answers. We recognize,
however, answers to all questions associated with
this tragedy may never be answered. Because of
this uncertainty, it is important to move forward
with our report.
38WVMHST Report, December 2006
- As the Team continues its work, should
additional answers be found, the report will be
supplemented. Additionally, it is important that
we focus our efforts on doing what we can to
assure that nothing similar occurs in the future.
This will be the primary goal of our
investigators as they move forward."
39WVMHST Report, December 2006
- Conclusions
- The "seals sustained high explosive forces from
the mine explosion... Why the pressures were so
high is becoming clear, but not yet proven." - "The cause of the explosion is clearly related to
lightning. This conclusion is presented by
strong corroborated circumstantial evidence...
How the electricity from lightning entered the
sealed area is still under investigation, and in
that regard, this report is not complete."
40MSHA Report, May 2007
- 273 citations issued during investigation
- Proposed penalties totaling 273,774
- ICG/Wolfe Run has paid 49,167
- 71 citations being contested
- No Contributory violations issued
41MSHA Report, May 2007
- Details process of elimination of probable
causes - Methane
- Roof fall
- Electrical power, equipment and grounding
- Circuit breakers to switches to cap lamps
- Lightning
42Methane Explosions
- Explosive range 5-15 concentration
- Lighter than air typically found near roof
- Fire bosses/spotters check for methane
- Mixture of methane and air ignited by
- Electric arcs, sparks from equipment
- Open flames
- Heat of friction (cutting bits rock)
43Sagos Recently Sealed Area 2nd Left Mains
- Roof control plan called for supplemental roof
support truss bolts, tunnel arches, wire
screens, cable bolts. - Second mining (see next)
44Bottom Mining
45(No Transcript)
46Sagos Recently Sealed Area 2nd Left Mains
- Roof control plan called for supplemental roof
support truss bolts, tunnel arches, wire
screens, cable bolts. - Second mining completed early Oct 05.
- Nov 05 serious roof fall injury
- Sago managers decided to seal-off this area.
47Sagos Recently Sealed Area 2nd Left Mains
- Ten seals were constructed
- Contract-miners
- Completed on December 12, 2005.
- Explosive range (5-15) on/about December 26,
2005. - Estimate (subsequent) to non-explosive range
January 22, 2006.
48- Two methane studies were conducted in the area
previously sealed inby the 2 North Mains seals
(Feb 7-9, Mar 2-3, 2006.) - The results of the studies show that at the time
of the explosion, 347,300 cubic feet of methane
had accumulated in the sealed area.
Fuel
Fuel
347,300 cubic feet of Methane
49Roof Fall Hypothesis
50Potential Ignition Sources
Three roof fall areas noted prior to sealing.
Roof fall areas noted as having occurred before
1/27/06 during exploration after the explosion.
Roof fall areas noted during investigations after
1/27/06.
Origin of the Explosion
X Sandstone beds noted in top of roof fall
cavity sample collected.
51Roof Fall Hypothesis
- Shale is the predominant rock type visible in the
rubble. It is laminated siltstone with low
quartz content in a soft matrix that inhibits
quartz grain-to-grain contact. - Laminated siltstone is not as conductive to
frictional heating or piezoelectric sparking as
sandstone.
52Potential Ignition Sources
Roof Falls in the Sealed Area
Although a roof fall cannot be definitively
excluded as a potential ignition source for this
explosion, it is a highly unlikely source.
53Roof Fall Hypothesis
- No roof falls in proximity of explosion origin.
- Considered possibility of wicking of methane
- Methane layer must in 5-15 explosive range.
- Generally associated w/ being near roof
- Burning methane layer eventually contacts larger
accumulation of methane, resulting in explosion - Turbulence caused by roof fall, distance,
elevation, and uneven roof conditions from the
observed falls make this a highly unlikely
ignition source.
54Lightning-Induced Explosion Hypothesis
55Lightning-Induced Explosion Hypothesis
- MSHA contracted with Sandia National Laboratory
- Performed modeling and testing to simulate
whether lightning energy could enter the mine by
direct contact or indirect inductive coupling. - Compared energy levels recorded at Sago with
levels required to initiate an arc. - Concluded "that lightning-induced electrical
arcing was not only plausible, but highly likely"
56Sandia National Laboratory
- "Current in a lightning strike has an associated
electro-magnetic field. Due to the relatively
low frequency content of lightning (lt100kHz),
electromagnetic energy can readily propagate
through hundreds of feet of earth and induce a
voltage onto an antennae or receiver. This
process is referred to as indirect coupling." - "An electromagnetic field propagates through the
earth as a result of a cloud to ground lightning
strike, or a long, low-altitude horizontal
current channel from a cloud to ground strike.
Unlike direct coupling, indirect coupling does
not require the presence of metallic conductors
in a continuous path from the surface to areas
inside the mine."
57Abandoned submersible pump retrieved from
previously sealed area of mine
58Sandia National Labs Report
- Insulation on the power conductors is rated for
2,000 volts. The red conductor failed the test
at 700 volts and the black conductor at 1,600
volts. Each of the two ground conductors failed
when 24 volts were applied to them. - Sandia tests revealed that during a lightning
strike the insulated conductors of the abandoned
pump cable could receive voltages as high as
20,500 volts. This voltage would be of a short
duration but the energy generated would be
adequate to cause an arc to ignite methane.
59Sandia National Labs Report
- Sandia's field measurements and analysis indicate
that significant electromagnetic energy can be
coupled into the sealed area of the mine. The
electromagnetic field is similar to the magnetic
field produced between the north and south poles
of a magnet. - The electromagnetic energy created by the
lightning discharge would have then radiated
through the earth onto the pump cable, which
could act as a receiver or antenna. The
electromagnetic energy could induce a voltage
onto the pump cable which generates an arc near
the explosive methane mixture in the sealed area.
60(No Transcript)
61Source WVOMHST, Sago Report, 2006
62Sandia National Labs Report
- "Measurements and analyses indicate that the pump
cable is the most likely receiver of
electromagnetic energy in the sealed area. This
is the most likely ignition source for this
explosion."
63MSHAs Root Cause Analysis of Explosion
- Seals were not capable of withstanding the forces
generated by the explosion. - The atmosphere within the sealed area was not
monitored and it contained explosive methane/air
mixtures - Lightning is the most likely ignition source for
this explosion with the energy transferring onto
the abandoned pump cable in the sealed area and
providing an ignition source for the explosion.
64United Mine Workers of America Report, March 2007
65United Mine Workers of America Report, March 2007
- Though the miners at the Sago mine were not
members of the UMWA or any other union, the UMWA
was designated under federal regulations as a
miners rep after this incident.
66United Mine Workers of America Report, March 2007
- The Union believes that there is absolutely no
clear evidence to support the theory that
lightning was the cause of the explosion. - Further, there is no evidence that lightning
striking the ground near a mining operation has
ever traveled in the underground area of a mine,
without the presence of a conduit from the
surface into the mine, and then caused an
ignition or explosion of gas or dust.
67United Mine Workers of America Report, March 2007
- The lightning strike theory is based entirely on
circumstantial evidence and is so remote as to be
practically impossible.
68United Mine Workers of America Report, March 2007
- The Union has determined that the most likely
cause of the explosion was conditions contained
solely within the sealed area of the mine where
the explosion occurred. - The Union concludes that the most likely cause
of the explosion was frictional activity from the
roof, roof support or support material which
ignited the methane-air mixture.
69 Honoring their Memory
Are underground coal mines safer today, and mine
emergency preparedness better today, than 2 years
ago?
70MINER Act of 2006
- Required
- Written ERP for each mine, updated every 6 months
- Require wireless 2-way comm/tracking by June 2009
- Two mine rescue teams within 1 hour for each mine
- Raised criminal penalty cap to 250,000 for first
offenses and 500,000 for second offenses - Established max civil penalty of 220,000 for
flagrant violations
Became law June 15, 2006
71Other MSHA Changes
- Mine Evacuation ETS (Mar/Dec06)
- SCSR hands-on and realistic training
- 48 hours supply of oxygen stored lifelines
- Evacuation drills lifeline more methane
detectors - Increased civil penalties (Sept/March 2007)
- Two staff assigned for Mine Emergency Ops
- SCSR electronic tracking
- 50 psi requirement for seals (July 2006)
- Mine Rescue
72Other MSHA Changes
- Mine Evacuation ETS (Mar/Dec06)
- SCSR hands-on and realistic training
- 48 hours supply of oxygen stored lifelines
- Evacuation drills lifeline more methane
detectors - Increased civil penalties (Sept/March 2007)
- SCSR electronic tracking
- 50 psi requirement for seals (July 06)
73Other MSHA Changes
- Approved first wireless tracking system (Jan 08)
- Mine rescue teams (Sept 06/Feb 08)
- Knowledgeable person at mine at all times annual
training - Two certified mine rescue teams for each mine
available within one hour form mine rescue
station. - Training underground at assigned mines knowledge
of ventilation - Annual smoke or simulated smoke training
- 96 hours of training annually
- Mandatory participation annually in two mine
rescue contest - Allows four types of teams on-site, composite,
contract and state-sponsored
74West Virginia Initiatives
- Required mine operators to have a plan by April
07 for an emergency shelter - 48 hours of life-support (SCSRs or other)
- Heat and pressure/force survivability
- Four shelters approved by WV (March 07)
- 40,000 more SCSRs are underground in WV
- Written plans for communication tracking by Aug
07
75Mine Health Safety Solutions Huntington, Utah
76MSHAs Internal Review