MMDA PRIORITY PROJECTS - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

MMDA PRIORITY PROJECTS

Description:

Traffic congestion and environmental degradation in Metro ... via Xavierville Avenue Chico St Langka St. K-6th - Salgado St. - Kamias. Xavierville Ave ... – PowerPoint PPT presentation

Number of Views:126
Avg rating:3.0/5.0
Slides: 15
Provided by: cleana
Category:

less

Transcript and Presenter's Notes

Title: MMDA PRIORITY PROJECTS


1
Go to Home Page
2
Project Description 
  • The Problem
  • Traffic congestion and environmental degradation
    in Metro Manila due to wide use of motorized
    transport
  • Increase in number of illegal settlers - many of
    whom are among urban workers from out of town
    caused by high transportation costs

Go to Home Page
3
Project Description 
  • The Concept
  • Allocation of dedicated secondary roads that
    interconnect the 17 cities and towns of Metro
    Manila for the exclusive use of pedestrians and
    bicycle riders

Go to Home Page
4
Go to Home Page
Proposed Network
5
Project Objectives
  • To provide a safe thoroughfare where low-cost and
    environment-friendly means of non-motorized
    transportation for commuters and pedestrians
  • To open up economic opportunities along the route
    of the Walk and Bike ways.

Go to Home Page
6
Project Components
Go to Home Page
  • Identification of the road network for the walk
    and bike way
  • Coordination and consultation with stakeholders
  • Public information campaign
  • Project implementation
  • Monitoring and evaluation
  • Road surface improvements
  • Road markings
  • Signage

7
Go to Home Page
Typical Section Of Walk And Bike Way, Exclusive
8
Typical Section Of Walk And Bike Way
One-Side, Two-Directional Bike Way
Go to Home Page
9
Typical Section Of Walk And Bike Way
Road shared w/ motorists, 1-direction per side
Go to Home Page
10
Provision of traffic signals and lane markings at
major intersections
Typical Walk and Bike Way Plan at Intersecting
Main Roads
Go to Home Page
11
Immediate Impact
  • Improved mobility
  • Cheaper travel
  • Safe mobility for pedestrians and bikers
  • Economic benefits
  • Encourage people to walk and bike
  • Reduced motorized vehicle use

Go to Home Page
12
Project Cost
Go to Home Page
13
  • Timeframe

Go to Home Page
14
From Katipunan to EDSA via Xavierville Avenue
Chico St Langka St. K-6th - Salgado St. -
Kamias
Go to Home Page