Title: CASCADE From Concept to Implementation
1CASCADEFrom Concept to Implementation
- SUR Division Meeting
- Brussels,
- 17 December 2007
- Alex Wandels, Jörg Steinleitner, Sorin Muresean
- CASCADE Programme
CASCADE RFG - ASAS TN2 Seminar Jörg
Steinleitner Paris, 14 April 2008
European Organisation for the Safety of Air
Navigation
2 CASCADE Scope
- Ground Surveillance Applications (ADS-B Out)
- In a non-radar environment
- In a radar environment
- On the airport surface
- Airborne Derived Data
2008
ADS-B Receiver
- Airborne Surveillance Applications (ADS-B In)
- Situational awareness on the surface
- Airborne situational awareness
- Visual separation on approach
- In Trail Procedure
2011
Situational Awareness only
3Going to Operations - what does it take?
4Progress Trials
12 ANSPs
400 aircraft 500,000 flights/year GA
5ADS-B-NRAAirworthiness Approval
Based on RFG ED126/DO303 Publication is imminent
! All Airbus families approved (on NPA
basis) Boeing to follow soon (FAA
approval) Acceptable Means of Compliance for
Hudson Bay Implementation !
EASA AMC 20-24
6ADS-B Sites
7CRISTAL ITP
Revenue Flights
Flight Trial
RTS
From 80 nm to 20 nm
8Deployment in Europe Timeline
IR based implementation in wider areas
upgraded equipage
voluntary implementation in pocket
areas certified existing equipage
9Deployment in Europe Avionics
ADS-B in (voluntarily)
10High-level RFG Planning
2008
2007
2009
ADS-B-NRA (ED-126, DO-303) Enhanced ATS in
Non-Radar Areas
TBD ADS-B-ADD Aircraft Derived Data for Ground
Tools
11RFG/15 Feedback
- ATSA-ITP currently under EUROCAE WC / RTCA FRAC
- Bringing home ADS-B-RAD ATSA-VSA
- SPR/INTEROP integration to commence !
- Final Safety Methodology SMS ESARR4 !
- SM, SURF, AIRB definition of scope
- ASPA-SM back on track, using FDMS feedback
- ATSA-SURF basic situational awareness, with
indications TBD - ATSA-AIRB chosen scenario mixed AT/GA in class
E airspace - ADS-B-APT to be closely coordinated with
ATSA-SURF - Hard deadline end 2009!
12RFG - what does it take?
13ADS-B Performance ADS-B-NRA ADS-B-RADReported
vs. Required
- Sources
- ADS-B Monitoring Project
- Pioneer Airlines Project
(based on 100 million samples)
Integrity Bound
lt20NM lt10NM lt2.0NM lt1.0NM lt0.5NM lt0.2NM lt0.1NM
Systematic NUC0 issue (1 !) Under
investigation !
14ADS-B in other Continents
NRA Hudson Bay Nov 08 later Greenland
NRARAD Upper airspace 2012-2014-2018
RAD all airspace 2020
15g4 International CoordinationEquipage Advice
Advice
Status
ADS-B equipped today Get it certified
Not ADS-B equipped today Wait for Implementing Rule
Buying aircraft between now and rule Opt for DO260A SA Aware
16Beyond CASCADE Package 1.5
- To fill the gap between CASCADE Package 2
(AP23) - Enhanced ATSAW Spacing Applications
- IOC of 2013 (part of SESAR IP2)
- Implies changes to ATCO procedures ADS-B In
avionics - Same ADS-B out avionics baseline as for CASCADE
- Eurocontrol new activity proposed to Directors
- RFG 1.5 to start in 2010
- Application set to be defined in the meantime
17First RFG 1.0 and then RFG 1.5
18Conclusion
ADS-B Implementation Is now !
Implementing Rules US and Europe 2009
Package 1.5
Significant role for RFG
www.eurocontrol.int/cascade