Alex Wandels, J rg Steinleitner, Sorin Muresean. CASCADE Programme ... New Grounds. No open ends ! A Great Team !!! Serving near-term. Implementation. OPS & SYS ... – PowerPoint PPT presentation

Number of Views:168
Avg rating:3.0/5.0
Slides: 19
Provided by: celis9
Learn more at: https://asas-tn.org
Category:

less

Transcript and Presenter's Notes

Title: CASCADE From Concept to Implementation


1
CASCADEFrom Concept to Implementation
  • SUR Division Meeting
  • Brussels,
  • 17 December 2007
  • Alex Wandels, Jörg Steinleitner, Sorin Muresean
  • CASCADE Programme

CASCADE RFG - ASAS TN2 Seminar Jörg
Steinleitner Paris, 14 April 2008
European Organisation for the Safety of Air
Navigation
2
CASCADE Scope
  • Ground Surveillance Applications (ADS-B Out)
  • In a non-radar environment
  • In a radar environment
  • On the airport surface
  • Airborne Derived Data

2008
ADS-B Receiver
  • Airborne Surveillance Applications (ADS-B In)
  • Situational awareness on the surface
  • Airborne situational awareness
  • Visual separation on approach
  • In Trail Procedure

2011
Situational Awareness only
3
Going to Operations - what does it take?
4
Progress Trials
12 ANSPs
400 aircraft 500,000 flights/year GA
5
ADS-B-NRAAirworthiness Approval
Based on RFG ED126/DO303 Publication is imminent
! All Airbus families approved (on NPA
basis) Boeing to follow soon (FAA
approval) Acceptable Means of Compliance for
Hudson Bay Implementation !
EASA AMC 20-24
6
ADS-B Sites
7
CRISTAL ITP
Revenue Flights
Flight Trial
RTS
From 80 nm to 20 nm
8
Deployment in Europe Timeline
IR based implementation in wider areas
upgraded equipage
voluntary implementation in pocket
areas certified existing equipage
9
Deployment in Europe Avionics
ADS-B in (voluntarily)
10
High-level RFG Planning
2008
2007
2009
ADS-B-NRA (ED-126, DO-303) Enhanced ATS in
Non-Radar Areas
TBD ADS-B-ADD Aircraft Derived Data for Ground
Tools
11
RFG/15 Feedback
  • ATSA-ITP currently under EUROCAE WC / RTCA FRAC
  • Bringing home ADS-B-RAD ATSA-VSA
  • SPR/INTEROP integration to commence !
  • Final Safety Methodology SMS ESARR4 !
  • SM, SURF, AIRB definition of scope
  • ASPA-SM back on track, using FDMS feedback
  • ATSA-SURF basic situational awareness, with
    indications TBD
  • ATSA-AIRB chosen scenario mixed AT/GA in class
    E airspace
  • ADS-B-APT to be closely coordinated with
    ATSA-SURF
  • Hard deadline end 2009!

12
RFG - what does it take?
13
ADS-B Performance ADS-B-NRA ADS-B-RADReported
vs. Required
  • Sources
  • ADS-B Monitoring Project
  • Pioneer Airlines Project

(based on 100 million samples)
Integrity Bound
lt20NM lt10NM lt2.0NM lt1.0NM lt0.5NM lt0.2NM lt0.1NM
Systematic NUC0 issue (1 !) Under
investigation !
14
ADS-B in other Continents
NRA Hudson Bay Nov 08 later Greenland
NRARAD Upper airspace 2012-2014-2018
RAD all airspace 2020
15
g4 International CoordinationEquipage Advice
Advice
Status
ADS-B equipped today Get it certified
Not ADS-B equipped today Wait for Implementing Rule
Buying aircraft between now and rule Opt for DO260A SA Aware
16
Beyond CASCADE Package 1.5
  • To fill the gap between CASCADE Package 2
    (AP23)
  • Enhanced ATSAW Spacing Applications
  • IOC of 2013 (part of SESAR IP2)
  • Implies changes to ATCO procedures ADS-B In
    avionics
  • Same ADS-B out avionics baseline as for CASCADE
  • Eurocontrol new activity proposed to Directors
  • RFG 1.5 to start in 2010
  • Application set to be defined in the meantime

17
First RFG 1.0 and then RFG 1.5
18
Conclusion
ADS-B Implementation Is now !
Implementing Rules US and Europe 2009
Package 1.5
Significant role for RFG
www.eurocontrol.int/cascade