Demo/Loan Programs Essentials in Program Design - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Demo/Loan Programs Essentials in Program Design

Description:

'If you come to a fork in the road - take it. ' ---- Yogi Berra. Three Primary Considerations ... equipment inventory -- staff expertise. Administrative Structure ... – PowerPoint PPT presentation

Number of Views:49
Avg rating:3.0/5.0
Slides: 9
Provided by: dcgo3
Category:

less

Transcript and Presenter's Notes

Title: Demo/Loan Programs Essentials in Program Design


1
Demo/Loan ProgramsEssentials in Program Design
  • Dr. Diane Cordry Golden
  • Missouri Assistive Technology
  • dcgolden_at_swbell.net

2
  • If you come to a fork in the road - take it.
  • ---- Yogi Berra

3
Three Primary Considerations
  • Programmatic Scope
  • equipment inventory -- staff expertise
  • Administrative Structure
  • centralized and decentralized options
  • Costs
  • equipment versus operational costs

4
Program Scope
  • Inventory Expertise
  • Depth/Breadth Level
  • Comprehensive Extensive
  • Good Adequate
  • Limited Basic

5
Administrative Structure
  • Centralized
  • leverage state dollars
  • savings (volume buy, vendor connections)
  • easier to get high level expertise
  • reduce duplicative equipment/services
  • direct oversight/control (consistent data)
  • Decentralized
  • leverage local dollars, utilize existing
    equipment pools
  • operational savings (less shipping, donated
    space
  • increased consumer connection (less distance)
  • less oversight/control (data) less
    stability/consistency

6
Costs
  • Equipment
  • Can be periodic
  • Can be adjusted with understanding of impact on
    program scope
  • Easier to leverage external funding
  • Operational
  • Annual in nature
  • Once program model implemented, difficult to
    adjust
  • Difficult to leverage external funding

7
Critical Things to Do
  • 1. Intimately know/understand existing resources
  • Statewide, local, internal
  • Equipment pools
  • Expertise available
  • Administrative relationships
  • 2. Identify supportable administrative structure
  • In-house resources external resources
  • Leverage when possible (but have plan B for loss)
  • Dont be afraid to mix central/decentralized
  • 3. Identify supportable program scope
  • Make sure equipment level expertise level
  • Shoot for incremental building
  • Build relationships for external funding

8
  • If you arent in over your head,
  • how do you know how tall you are?
  • ---- T.S. Elliot
Write a Comment
User Comments (0)
About PowerShow.com