Bunch phase detector design started (Claudio, JS) HLS system moved to sector B (BINP, J.Volk) ... Replace rusty stands (~ 80 dipoles) M.McGee, J.Volk ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 9
Provided by: shil3
Category:
Tags: aug | bunch | fy04 | look | nov03 | progress | rusty | tevatron

less

Transcript and Presenter's Notes

Title: Tevatron progress: Aug to Nov03, look in FY04


1
Tevatron progress Aug to Nov03, look in FY04
  • Luminosity (average initial peak L)
  • End of July (5 stores 2815-2826) L40.1
  • End of Aug (7 stores 2934-2956) L39.9
  • record L as of Aug.8 45.3e30 store 2824
  • record L as of Nov.7 48.9e30 store 2887
  • lifetimes of N_p dropped from 70 to 32 hrs , L
    from 12 to 9 hrs, N_pbar and eff-emittance same
    ( 30hrs)
  • FY03 Integral 238 pb-1 (goal was 230 pb-1)

2
Highlights on Operations/Reliability
  • FY03 goal of 230 pb-1 2 weeks before shutdown
  • New helix gt500GeV to Seq.4 ? 2 ramp eff (Yuri)
  • Lattice corrected at inj ? helps ?pi (Valery)
  • Crate PSs problems (3 stores)
  • 1 bckt off pbars (2 stores, 3 days) fixed
  • High proton losses early in stores
  • 1st inj damper ½ commissioned (JS, CYTan)

3
Tevatron Beam Physics Progress
  • V4YA ramp helix commissioned (Yuri, Jerry, )
  • series of lattice measurements, implementation of
    corrected lattice at injection (Valeri, Petr)
  • direct ?-function msmnt QXR way off the model
    (AJ)
  • b2 snapback news, no need in 6 ramps, etc
    (Pierre, Velev)
  • calcssuggestions on octupoles/A0 sextupole (PI,
    YA)
  • ? est 37-44 cm from L(?z) (VS), drift since Feb
    (Vaia)
  • theory of instability and inj damper, recomds
    (A.Burov)
  • SDA of high proton losses (Paul, Vaia, VS)
    still ??

4
Tevatron Diagnostics
  • new BPM design progress(S.Wolbers,J.S.,M.M.)
  • Cv,h from tunefitter works (Paul)
  • new SBD ?l algorithm (Alvin)
  • IPM reviewed, OKd (AJ)
  • Bunch phase detector design started (Claudio, JS)
  • HLS system moved to sector B (BINP, J.Volk)
  • Strange 21 MHz pbar Schottky (Markus H.)
  • FWs test/analysis in progress(S.P,K.Genzer)
  • Abort gap monitor improved, unexplained study
    results (H.Cheung, S.P)

5
Shutdown03 Projects J.Volk
many
preceded by internal reviews
  • F0 Lambertson Liner P.Ivanov, A.Chen
  • Reshim 106 dipoles D.Harding, J.Annala
  • A48 Collimator R.Moore
  • New octupole circuits P.Ivanov, J.Annala
  • A0 sextupole D.Still,Y.Alexahin
  • Fix cold leaks A4,E2, F1 D.Augustine
  • Fix aperture restrictions (A0, D0..) C.Moore,B.Ha
    nna,
  • Vacuum improvements (A1/P1,F0) B.Hanna
  • Replace rusty stands ( 80 dipoles) M.McGee,
    J.Volk
  • Survey and Alignment (unrolls, ) Ray,Craig,
    Norm,Keith,AMG
  • BPM wiring F.DeJongh,
  • TevNet (survey network) AMG
  • B-sector HLS system A.Chupira,J.Volk,Todd

6
Next Two Months
  • Operation/Maintenance
  • Tev startup 7 days 11/18-11/25
  • Back to gt40e30 mid-Dec
  • Beam studies after the startup
  • impedance measurements after shutdown ? explore
  • larger N_p (PI, Bruce, )
  • lattice msmnts after shutdown (VL, PI, )
  • commission inj-dampers (JimS, Tan)
  • possible studies to reduce high LOSTP (TEL?)
  • P1/A1 rolls ? Emm at injection (DaveJ,Val,JA)
  • 300W kicker to clean DC beam (CYTan, J.S)
  • commission SL abort gap monitor (Harry, Stephen,)

7
Next Two Months Expectations
  • Last time it was we are around 45-51 by Sep 8
    - we are at 49e30
  • Over the next 2 months, I expect
  • be around 40e30 mid-Dec
  • possible improvements
  • 10-20 more p due to reduced Lambertson impedance
  • As the result, I expect well be around 45-55e30
    by Jan.8, 2003

8
Major FY04 Projects
  • OPERATIONS J.Annala, Tev Dept
  • commission inj dampers J.Steimel, et.al
  • install new separators next shutdown R.Moore,
    et.al
  • commission new BPM system S.Wolbers, et.al
  • install IPMs next shutdown A.Jansson, et.al
  • global realignement, global HLS R.Stefansky,
    et.al
  • modify/install(?) TEL next shutdown V.Shiltsev,
    et.al
  • commission tunetracker C.Y.Tan
  • commission tunefitter applications P.Lebrun,
    et.al
  • install C_vh on-line system V.Ranjbar, et.al
  • B-field on/off(?)-line studies P.Schlabah,
    et.al
  • vacuum improvement next shutdown B.Hanna, et.al
  • develop fast lattice msmnt/correction
    system V.Lebedev, et.al
  • install crystal collimator next shutdown D.Still,
    et.al
  • ? at IPs back to 35 cm, further
    reduce M.Martens, et.al