Title: Wisconsin Statewide Model
1Wisconsin Statewide Model
2Travel Forecasting Analysis Section
- Forecasts for Project Development Design
- Major Projects and Statewide Corridors
- System-wide forecasts to Calculate
Level-of-Service in Metamanager - Statewide Model development for Multi-Modal
Planning - VMT Estimation and Forecasting
- Output to FHWA for Program Apportionment
- Output to DNR for Environmental Air Quality
Analysis - Output to State Patrol DTID for Fatality Rate
Calculations - Origin Destination Studies for Local Cost Share
3Statewide Modeling Context
- Systems View
- Synchronization
- Applications
4Wisconsin Statewide Model
5Wisconsin Network Zone
6Wisconsin MPO Models
7Wisconsin Regional Models
8Regional Model
NorthWest Wisconsin
9MPO Model
EauClaire / Chippewa Falls
10System View
Statewide Model
Regional Model
MPO Model
11System Feedback
Statewide Model
Regional Model
MPO Model
Statewide Model Provides AADT Estimates to MPO
Model
Statewide Model Completed October 2004
12System Feedback
Statewide Model
Regional Model
MPO Model
MPO Model Provides AADT Estimates back to
Statewide Model
MPO Model Completed December 2004
13Synchronized Models
Synchronized Models Provides AADT Estimates to
Region
Regional Model Completed December 2005
14Traffic Analysis Forecasting Information System
Produces and Warehouses AADT Estimates for
Analysis
Provide Overrides Capability of Historical Based
Forecasts
15Systems Interaction
TAFIS
- Source Data for
- WisDOTs Metamanager System
- WisDOTs Corridor Management
- Traffic Impact Analysis
16Traffic Analysis Forecasting Information System
(TAFIS)
- SAS-based forecasts utilizing historic data
- Produces and warehouses AADT estimatesfor
analysis - Utilizes Box-Cox regression methodfor
Interstate, US and Wisconsin State highways
17TAFIS Example
18Model Application Outputs
- Conceptual Planning ( Alternatives Testing)
- Input into Paramics ( Design)
- Planned Projects within each MPO
(Long Range Transportation Plan)
19Design Concepts I-94 (St. Croix County)
I- 94
20Principles
- Partnership with Consultants
- More robust AADT Estimates
- Realistic Design
- Anticipate Emerging Growth
21(No Transcript)
22Wisconsin Statewide Model
Thank you
23Questions