Title: News about epitaxial silicon sensor
1Attivita sul microvertice a Torino
Daniela Calvo
Commissione scientifica 3, Genova 21 settembre
2009
2Micro-Vertex-Detector requirements
- Good spatial resolution in r-phi
- Momentum measurement of
- pions from D decays
-
- Good spatial resolution specially in z
- Vertexing, D-tagging
- Good time resolution
- rms 6 ns (at 50 MHz clock)
- with 2107 ann/s
- Triggerless readout
- Energy loss measurement
- dE/dx for PID
- Low material budget
- low momentum of particles
- (from some hundreds of MeV/c)
3MVD layout
4 Status of the activities for the pixel detector
in Torino Assembly layout Electronics and
cables Mechanics and cooling
5Standard hybrid technology
6Assembly layout
72-chip module
Assembly scheme
Controller chip
Power cable
Data cable
0805 bias filter capacitor
0603 supply filter capacitors
Sensor
ToPiX readout chips
Multilayer bus structure
By R. wheadon
8Layout of forward disks
By R. wheadon
Possibility of daisy-chaining controllers to save
on cables (where data rates allow)
Controller chips serve two or three ToPiX readout
chips
For outer layer of barrel would need to
daisy-chain two 6-chip modules (power and
controller chips) to keep cables out of active
region
Keeping cables out of active region means that
some modules may require two designs according to
which end the cables have to be connected
9Electronics and cables
10Upgrade of ToPix
- Technology LM -gt DM (the HEP mainstream)
- LM 6 (thin) 2 (thick) metal layers
- DM 3 (thin) 2 (thick) 3 (RF) metal layer
- RF layer shows lower resistivity and helps power
routing - RF layer gives more precise capacitance
- shared bus among adjacent columns
100 mm
25 mm
11Upgrade of ToPix
- Clock from 50 MHz to 160 MHz
- time stamp bin 6ns
- new columns and receivers to be redesigned
- new simulations
- SEU protection DICE cells -gt triple redundance?
- twice size increase in the digital part of the
chip -gt rescaling of the analog part
12Upgrade of the analog part of ToPix - I
Adaptation for the clock _at_ 160MHz
In order to keep the same clock_cylces to
injected_charge ratio as ToPix2 (clock_at_50MHz),
the discharging current value has to be
proportionally increased from 5 nA to 16 nA.
Simulation result of analog output signal with
the 2 different clock values
Qin Clock frequency ToT Clock cycles Clk_cy/Qin
30 fC 50 MHz 6.094 ns 304 10.1
30 fC 160 MHz 2.000 ns 320 10.7
13Upgrade of the analog part of ToPix - II
Compact leakage compensation stage Layout
compatible with the DM process
Baseline variation of 0.6mV when the leakage
current increases from 10nA to 100nA. (2mV)
ToT variation due to the leakage
current Simulation Qin 80fC dToT/dIleak-1.53ns
/nA
14Results from radiation damage test of epi-diodes
the radiation damage constant
Equivalent fluence values on the diodes
5.13x1013, 1.54x1014, 5.13x1014n(1MeVeq)/cm2
corresponding to 1, 3 and 10 years of PANDA
lifetime
The radiation damage constant is a DJ/F
7.6(?0.3)x10-17 A/cm for all diodes.
Lekage current lt 50 nA/pixel (100 mmx100mm size,
100 mm thick)
15RD electronics and connections
Development in progress with prototypes
Study of the architecture in progress ( test of
high frequency cable)
Readout chip Detector
Module controller
to counting room/daq
cable
Optical transceiver
PCB -BUS
Development in progress in other collaboration
First prototypes
16Preliminary bus scheme
By R. Wheadon
17Cable prototype testing board layout
1 m differential cable
Al
Al
Kapton (SU8)
pads
connectors
18Cable prototype preliminary simulation
By Paolo De Remigis
19Updates from pixel cooling
Responsible S. Coli INFN - Torino
20Results from test
- New prototype done
- 12 resistors on 4 rows, 2 rows x side
- disk body by POCO-HTC foam
- 2 tubes embedded (øe2mm, øi1.84mm)
COOLING TEST RESULTS IR IMAGES
21Results from simulations
FEM RESULTS
INPUT DATA
22Cooling system for disks
Disk split in two halves along the
mid-plane Material for heat dissipation foam
POCO-HTC Embedded cooling capillary between the
two halves All elements grued with thermal
glue Problem large glueing area -gt test have to
be performed
23Results with different material for cooling
POCO FOAM Density 0.55 g/cm3
POCO HTC Density 09 g/cm3
Pyrolytic Graphite Density 2.2 g/cm3
Max. Reached Temperature Poco Foam 23C POCO
HTC 21.7C PG 23.3 C
Total power 90 W Coolant Temperature 20C
24Cooling pipe scheme
1 tube Ø6 2tubes Ø8
25Updates from MVD Mechanics
Responsible G. Giraudo INFN - Torino
26MVD layout
27Fittings for cooling pipes
Ancillary parts as special fittings and curves
can be common parts made from Ryton R-7-220 by
injection mould
7 mm diameter 16 mm length 3 bar maximum pressure
28Mechanics details
29Primary target
Responsible F. Iazzi Politecnico and INFN -
Torino
30Primary target
- The target will be built through the following
steps - Step 1
- The target production starts from a disk shaped
basis of Cu, (sizes14mm diameter and 0.5 mm
thickness), on which a carbon layer 20 mm thick
will be deposited - Remarks
- the density of the layer is not the graphite
density, but close to that it will be measured
(we will use the back-scattering technique) - the thickness of the layer can be chosen without
major constraints in the range 10-40 mm and will
be measured by optical techniques with good
precision (better than 5), after the deposition - Step 2
- After the deposition the carbon layer will be
masked along the wires and the rest of the carbon
will be wet-etched and taken away. The result
will be a Cu disk having 3 wires of about 14 mm x
20 x 20 mm2 glued on. - The distances between the 3 wires could be 3.5 mm
in order to avoid the beam spot overlapping on 2
wires - Step 3 (see fig. 2, where the ring is in
violet, wires in black/white) - The Cu disk will be wet etched and taken away
unless a ring (external diameter 14 mm, internal
12 mm), which will be previously masked. The
result will be a ring with 3 C wires like a
guitar. - Step 4
- The Cu ring with wires will be inserted inside a
Al local frame, whose aim will be to manage the
plugging of the target into the beam pipe
side view
frontal view
31Next step and conclusions
32Richieste capitolo Missioni Interne
33Richieste capitolo Missioni Estere
- MISSIONI ESTERE
- Partecipazione ai 4 meetings di collaborazione
con cariche ufficiali 4 pp al Coordination
Board (Calvo, Filippi, Marcello, Iazzi) e 1 pp
al Technical Board (Calvo) (i meeting generali
sono programmati a 5 gg). 5ggviaggio x 4
meetings x 5pp 25 keuro - Partecipazione ai meetings del microvertice e
della meccanica dellesperimento con presenza
del coordinatore meccanica mvd (G. Giraudo) e
responsabile cooling ( S. Coli) e partecipanti al
FEE tag (D. Calvo e A. Rivetti). 3gg viaggio x 7
meeting x 3 pp 13 keuro - settimana di lavoro a Julich per microelettronico
con sviluppo logica di controllo in
collaborazione. 5ggviaggio x 1 p 1.5 Keuro - lavoro di integrazione della meccanica e del
cooling dei pixel e delle strips intorno alla
beam pipe e targhetta, con il routing (1 sett. a
Julich, 1 sett.a Bonn, 1 sett.al GSI).
5ggviaggio x 2 pp x 3 incontri 5 Keuro - contatti scientifici del responsabile locale mvd
con il responsabile mvd a Bonn, per scrittura
TDR. 4 ggviaggio x5 contatti x 1p 3 Keuro - 2 Physics meetings ( Iazzi e partecipante).
2ggviaggio x 2 contatti x 1 p1.5 keuromeetings
di aggiornamento software di una settimana per 2
persone presso GSI. 5 - ggviaggio x 1 corso x 2 pp 3 keuro
- dottorando al GSI per lavoro sulle simulazioni,
circa 10 giorni 1.5 keuro - contatto con Fraunofher Institute per bump
bonding dei sensori. 2ggviaggio x 1p 1.5 keuro - contatti scientifici con gruppi europei (fisica e
tecnologia). 3 ggviaggio x 3 contatti x 2 pp 3
keuro - 1 settimana di progettazione meccanica della
regione ipernucleare- beam pipe a Julich. 5
ggviaggio x1 pp 1 Keuro - Meeting per sviluppo targhetta e beam pipe per
la parte ipenucleare. 2ggviaggio x 2 contatti x
1 p1.5 keuro - partecipazione a due congressi internazionali per
presentare i risultati del mvd 5 ggviaggio x 1p
x 2 congressi 3.5 keuro - test TID con X al CERN per ToPix3 ( sj alla disp.
sorgente e chip). 7ggviaggio x 1 misura x 2 pp
2 keuro - test con protoni (circa 23 GeV) per studiare i
sensori epi (sj allass.fascio) con spessore fino
a 100 micron. 7ggviaggio x 1 misura x 4pp,
compresa installazione 4 keuro - test a Bonn (elsa) di radiation lenght di carbon
foam ( sj. ass fascio) 5ggviaggio x 1 misura x
2 pp 2.5 keuro - Totale M.E. 62.5 kEuro 8.5 kEuro
sj
34Richieste capitolo CONSUMO
sj
sj
35Richieste capitolo INVENTARIO
36f.t.e. nel 2010 a Torino
- Calvo Daniela 80
- Busso Luigi 30
- De Mori Francesca 20
- Filippi Alessandra 30
- Marcello Simonetta70
- Kugathasan Thanushan 100
- Szymanska Katarzyna 100
- Iazzi Felice 100
- De Remigis Paolo (elettronica) 60
- Mazza Giovanni (microelettronica)30
- Rivetti Angelo (microelettronica)20
- Wheadon Richard (sensori/elettronica)20
- Coli Silvia (meccanica/tecnologia)70
- Giraudo Giuseppe (meccanica/tecnologia)70
- 8fte
- E personale tecnico INFN-Torino
- Laboratorio di Elettronica e Laboratorio
tecnologico/Officina meccanica