Title: Waterfront


1
Waterfront Boating Access Summit Marina
ProjectsOctober 14, 2006
2
Update on Current Projects
  • Major Structural Rehabilitation
  • 5th Dock Slip Expansion
  • Courtesy Docks

3
Major Structural Rehabilitation
  • 6.3M Renovation
  • Selected Areas
  • Decking
  • Pilings
  • Water Lines
  • Electrical
  • Telephone
  • Cable
  • Completion Date July 2007

4
5th Dock Slip Expansion
  • South Yacht Basin
  • Additional 52 Slips
  • Estimated Cost 3.3M
  • FDEP Permit w/Conditions
  • Water Quality Testing
  • Water Circulators
  • Storm Drain Interceptor
  • Estimated Completion Date
  • December 2007

5
Courtesy Docks
  • 18 Courtesy Slips
  • Replace 26 Existing Slips
  • Accommodate up to 27 boats
  • 6 slips _at_ 24
  • 11 slips _at_ 27
  • 1 slip _at_ 40
  • First Phase Complete
  • Docking Fee

6
First Phase Courtesy Docks
7
(No Transcript)
8
Courtesy Docks Soft OpeningInterim Operating
Procedures
  • Mooring of boats is allowed from 600 am until
    200 am daily.
  • The docks are closed from 200 am until 600 am
    daily.
  • There are no overnight stays allowed at the
    Courtesy Docks.
  • The dock slips are numbered C-1 through C-8, with
    dock C-1 being the dock nearest Frescos. Dock
    C-1 can accommodate boats up to 40 feet in
    length.
  • Slips C-2 through C-6 can accommodate boats up to
    27 feet in length.

9
Courtesy Docks Soft OpeningInterim Operating
Procedures
  • Slips C-7 and C-8 can accommodate boats up to 24
    feet in length.
  • Boat length maximums shall not be exceeded, as
    this could create a hazard to navigation for all
    boaters involved in maneuvering in a restricted
    waterway.
  • The slips are for the use of the General Public.
  • These procedures are for the soft opening of
    the Courtesy Docks. These procedures will be
    replaced with permanent operating procedures
    within the next several weeks.