Title: Al Majaz Sharjah Park and Waterfront Redevelopment Project
1Redeveloping Al Majaz Park and Waterfront
The Al Majaz Park redevelopment project in
Sharjah, UAE, was undertaken by Sharjah General
Contracting Company (SGCC), one of the leading
construction companies in the region. The project
was aimed at transforming the park into a modern
recreational space with amenities for visitors.
The project was completed on time and within
2budget, with the help of Al Marwans expertise in
construction and project management. Overview of
the Project The project involved a complete
overhaul of the park, including the installation
of a new irrigation system, construction of new
walking paths, children's play areas, and a
parking plot. The park was also given a fresh
landscape design, with the installation of new
trees, plants, and grass. The project was valued
at AED 5.5 million and was completed within a
period of six months.It had been implemented by
Al Marwan using 215 specialized pieces of heavy
construction machinery operated by 430 operators
around the clock.
3Site Preparation One of the significant
challenges faced during the project was the
parks location in the midst of a heavily
populated residential area. Al Marwans team of
experts managed to overcome this by developing a
detailed project plan that involved careful
coordination of construction activities to ensure
minimum disruption to the surrounding
area. Starting with excavation and site
preparation, Al Marwans team utilized a variety
of heavy equipment, including bulldozers,
excavators, and backhoes, to excavate and prepare
the site for construction. This involved removing
existing structures, grading the land to the
desired
4level, and preparing the foundation for the
entertainment venues and roads. As for material
transportation and placement, Al Marwan also
provided dump trucks and other transport vehicles
to move large quantities of materials to and from
the site. This included soil, sand, gravel, and
other materials needed to build the roads and
foundation for the entertainment
venues. Completion Al Marwans heavy equipment
also played a crucial role in the paving and
finishing of the roads and transportation
infrastructure for the project. This involved
using asphalt pavers, graders, and rollers to
ensure a smooth and level surface that met the
project's specifications and safety requirements.
This also included the pedestrian walkways and
running courses across the waterfront. Throughout
the project, Al Marwan provided 24/7 support and
service to ensure that the equipment was running
smoothly and any issues were addressed promptly.
This included on-site maintenance and repair
services, as well as the provision of replacement
equipment as needed to keep the project on track
and within budget.
5Project Success Al Marwans expertise in
construction and project management was evident
in the successful completion of the Al Majaz Park
redevelopment project. The project was completed
on time and within budget, despite the various
challenges encountered during the construction
process. This was achieved by sourcing low-noise,
low-impact equipment, operated by tenured
operators working around the clock to get the
project done as efficiently as possible.
According to Nahhas, project manager at SGCC,
"The successful completion of the Al Majaz Park
redevelopment project is a testament
6to Al Marwan's expertise and commitment to
delivering quality projects to our clients. We
are pleased to have worked with them on this
project, which has provided the community with a
modern and attractive recreational space." The
successful completion of the Al Majaz Park
redevelopment project demonstrates Al Marwans
ability to meet demanding project requirements
effectively. We encourage developers and
contractors who are looking for similar results
to partner with us on their next construction
project.