Title: McLaughlin Body Company
1McLaughlin Body Company
- John Deere
- February 21, 2005
2Company History
3McLaughlin Body Company Corporate Office
4East Moline Operations 1400 5th Street (250,000
square feet / 23,225 square meters)
5Rock Island Operations 350-44th Street (450,000
sq. ft. / 32,516 sq. meters)
6Most Valuable Resource
- Dedicated employees at McLaughlin Body Co.
- 235 Hourly
- 83 Salaried
- Renewed relationship with U.A.W 1414
- Newly signed 6 year contract
- Lessons learned on both sides from a 4 week work
stoppage
7Our Vision
- Committed to being the premier supplier of cabs
and attachments by providing products and
services of the highest quality and value to our
customers.
8Our Mission / Value Statement
- Our Mission
- Our mission is to be the Quality,
Service, Technology and Value leader in our
industry. The focus on leading in all these areas
will allow McLaughlin to exceed our customers
expectations and mutually prosper.
- Our Values
- The integration of our people and processes to
provide products of high value and high
quality.The continual support of our community
by providing valued jobs and participating in
charitable activities.Continuous improvement
through employee development, training and
education.
9Competencies
- McLaughlin Body Company is a supplier of cabs,
bodies and attachments to the ag, construction,
industrial, military, mining, municipal and truck
markets - Expertise in
- Design and development
- Program management
- Prototyping
- ROPS certification
- Fabrication
- Weld
- Paint
- Assembly
- Delivery JIT to line set
10Fabrication Capabilities
- 5 OD capacity CNC controlled roll bender for
complex sweeps
- Various lasers including a Mazak FMS (Flexible
Manufacturing System) featuring (2) 4000 watt
lasers - 2500 watt Mazak multi-axis laser with sheet
loader
- CNC controlled press brakes nearly eliminate setup
- Straight side and double action draw presses to
1000 tons bed sizes up to 144 X 90 and 56
shut height
11Robotic Welding
- 13 Existing robotic weld stations
- ABB
- Panasonic
- Fanuc
- 9 integrated weld positioners
- 3 flexible cells
- Continued dedication to expansion of automation
12Paint Capabilities
- Current dual paint systems handle parts of any
size - Current E-coat Cab line
- 8 stage zinc phosphate pretreatment with
non-chrome seal - 8th generation low cure cathodic epoxy e-coat
material - Minimal shrink / edge pull
- Reduced VOCs and improved performance
- Acrylic top coat
- 6 X 8 X 6 part size
- 2000 capacity
- Large line
- 5 stage iron phosphate pretreatment
- Polyester top coat over thermally cured spray
primer - 10 X 10 X 50 part size
- 10,000 capacity
- All new cab line will be operational in April of
2005
13MBC Customers
14Quality
15Customer Quality Metrics
-
- Quality Delivery
- Customer A 5.1s 6.0s
- Customer B 6.0s 6.0s
- Customer C 4.8s 6.0s
- Customer D 6.0s 6.0s
- Customer E 98
- All Others 99
- (MBC, VOC Report Ratings)
16Supplier of the Year Award
- Deere Company, North American Ag Division, 2004
Supplier of the Year Award
17Customer Communications Tools
- Customer Quality Status Reports (VOC)
- Internal quality rating system
- Quality Engineers communicate with customers and
report to the McLaughlin organization on a
weekly basis. - NetMeeting or WebEx Capabilities
- Provides the opportunity for the design, process,
manufacturing and quality engineers plus supply
management to work as a team on cost reduction,
corrective and preventive activities from
multiple remote locations. - Caterpillar Connect / Deere Supplier
Collaboration - Customer specific web based access to specs,
drawings, quality performance reports and other
communication information. - Electronic posting of PPAP documentation
18Materials Testing
- Two local certified laboratories for chemical and
physical testing of metals. - Chemical supplier performs periodic system audits
of cleaning and phosphating processes - Paint supplier performs monthly analysis of
E-coat bath. - In-house testing
- Dry film paint thickness
- Zinc phosphate pre-treatment coating weights
- Specular gloss of topcoat paints
- Cross hatch paint adhesion,
- ASTM B117 salt fog accelerated corrosion
resistance - GM9540P cyclic accelerated corrosion resistance
- Ultra phonic leak testing
- Ultra sonic weld evaluation
- Surface hardness of metals (Rb)
19CQTS Completed Checklist
20CQTS Component Pareto Analysis
21Corrective preventive action
- New reports automatically sent via internal
e-mail to specific employees - Focus on Direct Root Causal factors, Mistake
Proofing and other Prevention Activities - Complete sort capability by date range,
originator or report status - Completed reports are electronically transmitted
to the customer
22Cost Containments
23Pricing Methodology
- A specific formula is applied that both MBC and
our customer know and understand - Separate markups for purchased content vs.
manufactured content - Departmental overhead rates are applied for press
room, weld, trim, and paint - Changes are processed at variable cost only
24Cost Benchmarking Initiatives
- John Deere Steel
- Cat Logistics
- MRO Supplies
- Cost Containment Analysis
25McLaughlin Enterprise
- McLaughlin Body Company Cab Manufacturer
- Bee Line Company Laser Alignment
- McLaughlin Motors Auto Dealership
- SE National Bank Banking
- MBC Financial Leasing
26MBC Working to reduce costs?
- Major investments in equipment
- Info Systems Initiatives
- Continuous improvement initiatives
- Monthly cost reduction meetings
- Consolidation efforts
27Operations Consolidation
- Rock Island facility has been selected as the
primary manufacturing facility - Operations centered around world-class paint
system - Integration of all weld, paint and assembly
operations - Streamlined material flow between processes
- Integrated fabrication of components
- Operational in 4-6 months
28New system capabilities
- System will be isolated in separate, pressurized
building - Provide superior pretreatment
- 15 Stage immersion pretreatment with Zinc
Phosphate - Alkaline / Acid / Alkaline w/reverse polarity
cleaning stages for best in class laser oxide and
weld smut removal - Include powder coat in addition to e-coat and wet
spray top coat capabilities - 8th Generation improved performance e-coat
- Low-E powder for reduced VOC emissions and reduce
energy consumption
29Consolidation Goals
- Increased competitiveness
- Reduce waste associated with non-value added
activities - Reduce overhead by establishing multi-functional
focus teams - Accelerate throughput and reduced inventories
- Improve quality through streamlined processes and
direct communication between functional groups
30Consolidation Goals
- Improved communication
- Integration of product support personnel
- Electronic data collection and online access to
process instructions and drawings - Open layout without departmental barriers
- Committed team focused with clear mission for the
future
31Consolidation Goals
- Establish positive image within QCIC complex
- Segregation and distinction of MBC
- Exterior revitalization
- New visitor center and product showroom
- Clean and comfortable work areas for all
employees - Renewed emphasis on housekeeping
32What are the results?
- Material burden reduced 20
- Paint costs reduced 5
- Laser costs reduced 17
- Improved quality and capabilities
- Freight costs reduced 19
33Representative Price History 1
45
35
25
15
5
Base Price
5
15
34Representative Price History 2
12.5
7.5
2.5
Base Price
2.5
7.5
12.5
17.5
22.55
35Inventory Controls
- Forecasting
- Customer forecast and order requirements
- Delivery PPM scores
- In the past 12 months, of the 8092 trimmed and
sequenced cabs produced, 100 were delivered on
time - Sequencing of delivered cabs to machine line set
- Releases for fully trimmed cabs with a wide
variety of options are received into the planning
system via EDI - Electronic configuration of models and options
(EDI data / web portal) - Unique BOMs generated for each cab serial number
- Build card system for assembly instructions
36Order Process Trimmed Cab
Order Received EDI
MBC Create Work Order with Sequence
Build Ticket
Software and Test Download
Daily Shipments to Customer
- Sequence
- Options Required
- 30 Day Ship Notice
- 7 Day Firm Notice
- Details Optional Equipment
- Creates Sub-Assy Reports
- Reviews Inventory Requirements
- Software Downloaded
- Test Requirements
- Sub-Assembly Test Documented
- Daily Shipments by Customer Assy Sequence
- Invoiced
- Software Program Review Available Options for
Acceptance
37Supplier Communication
- Supplier Forecasting Requirements
- Quarterly forecasting meeting with suppliers to
review our estimated requirements for the next
six months - Expedited Freight From MBC suppliers
- Unscheduled customer volume increases
- Customer controller supplier late shipments
- Customer expedites cab shipments
- Supplier Quality Rating
- Reviewed with supplier on quarterly basis
38Development
39Engineering Support
- Current group consists of 5 Manufacturing
Engineers, 4 Industrial Engineers, 4 Quality
Engineers, 3 Design Engineers, 2 Tooling
Engineers and 1 Weld Engineer - This group can manage any product introduction
from a complete design from the ground up to a
straight forward transfer - Average Quotation Lead Time
- 1 week turn on Engineering Changes
- 3 to 4 weeks Cab
40Product Development Process
- Provide acceptable quotation
- Establish target price
41Engineering Support
- Project Management
- Projects are tracked through production start up
with detailed Gantt chart - Responsibilities defined and communicated
- Key milestone reviews scheduled
- Critical path tracked and managed
- Summaries and updates are circulated to entire
internal and external project team on
predetermined intervals
42Engineering Support
- Project Management
- Tooling and product cost budgets are carefully
tracked using development tracking summary - Products broken down by functional group such as
frame, glass, door, etc - Costs tracked and monitored against initial
frozen budgets - Immediate visibility to budget creep
- Miscellaneous items such as hardware budgeted
initially as a kit and tracked as defined
43Design Capabilities
- (7) Seats of Pro-Engineer (Maintain use of
previous versions to support customer needs) - Pro-Process for Assemblies (used by IE)
- Pro-Intralink (Data Management software)
- Pro-Mechanica 2001 (for FEA analysis)
- Ability to import IGES, STEP, DXF models
- Flexible and will adapt to customer needs
44Design Capabilities - Tooling
- Tooling design in can be done in Pro/E concurrent
with product development - Speed launch time, simplify changes
- Create permanent revision controlled record of
tools
45Design Capabilities - FEA
- Linear FEA capabilities using Pro/Mechanica
- Analysis for potential hot spots
- Frame / joint optimization
46Product Expertise
- ROPS expertise with active members on both
construction and Ag ROPS subcommittees. - Bill Johnson Advance Engineering Manager,
Current vice chair of SAE Operator Protection
Technical Committee - OPTC - Active member of OPTC SC4 - Protective Structures
- Active member of ASAE PM-23-2-2 Agricultural ROPS
subcommittee
47Change Process
48Management
492004 Five Year Strategic Plan
- Retain current customer base through superior
customers service - Improve customer communications with quarterly
reviews - Position ourselves as a Key Supplier all Deere
Division - Supplier of the Year for Deere Ag Division 2004
- Diversify business by obtaining new business in
new markets and additional business from key
customers - Utilize adjacency strategies to grow key segments
with valued customers - Achieve high value status (low cost, high
quality, exceptional services) - Evaluate current supply base and look at offshore
sources. - Evaluate current supplier deliver process for
inventory reduction - Leverage supplier expertise and develop strategy
for significant reductions
502004 Five Year Strategic Plan
- Operations consolidation
- Utilize lean tools and methods to sustain
continuous improvements - Pursue technology advancements to improve quality
- Successfully address key management succession
issues - Identify key people and skills and develop
appropriate plan - Achieve ongoing company wide commitment to
strategic direction - Schedule timely review, update and measurement
against strategic plan
51Thank You
From McLaughlin Body Company