Title: Information Management Capacity Check
1Information Management Capacity Check
2Table of Contents
Page Overview of IM Capacity Check Tool
4 Background 5 Intellectual Property
6 Objectives 7 Key Characteristics 8 Concept
9 Elements and Criteria 10 Principles for
developing Elements and Criteria 11 Elements of
IM Capacity Check Tool 12 Element
Descriptions 13 Level Descriptions 14 Overview of
Key Elements and Criteria 15 Guiding Principles
for developing Scales 18 Lessons learned-
Interviews and Communications 19 Project Team
Structure 20 Overview and Composition 21 Roles
and Responsibilities 22
3Table of Contents (contd)
Page Methodology for an IMCC Assessment 23 Overa
ll Methodology 24 Step 1Planning 27 Step 2Data
Collection 29 Step 3Consolidation of
Results 32 Step 4Validation of Findings 36 Step
5Developing an Action Plan 37 Elements and
Scale Descriptions 41 Additional Resources 42
4Overview IM Capacity Check Tool
5Background IM Capacity Check
- Library and Archives Canada developed the IMCC to
help federal government organizations assess
their current IM capabilities against industry
standards and best practices and develop a
strategic plan to improve their IM Capacity. - The IMCC was developed in collaboration with
stakeholders, other central agencies and subject
matter experts in the public and private sectors. - Proof of concept was achieved in three successful
pilot projects. The first was done on a
department-wide basis, the second in a government
cluster environment and the third at the project
level. - Over thirty (30) federal government departments
and agencies have successfully completed an IMCC
self-assessment and the IMCC has had significant
national and international attention.
6Intellectual Property Usage Restrictions
- The IMCC Tool may only be used in accordance with
the following - The IM Capacity Check Tool has been designed for
the use of (Canadian) federal departments and
agencies, or other parties working on their
behalf. This condition does not preclude third
party organizations providing chargeable services
utilizing this product in support of the federal
government IM Capacity Check self-assessment.
Third parties may utilize the IM Capacity Check
for self-assessment but no third party may use
this product for commercial gain outside the
intended use for the (Canadian) federal
government. - Use of the IM Capacity Check Tool must
acknowledge and identify BearingPoint as the
owner of this product. Departments and agencies
have the right to adapt the product, and could do
a self-assessment on their own or engage the
services of consultants to help them carry out an
assessment. Any adaptation must still continue
to acknowledge and identify BearingPoint as a
source of this product.
7ObjectivesIM Capacity Check
- Assess state of IM practices within each
organization against a common standard. Assess
current information management practices against
recognized best practices and principles and
identify level of Capacity. - Bring together all the elements of information
management practices. The Capacity Check is
intended to integrate the full range of
capabilities necessary to implement IM. - Compare against best practices. The Capacity
Check is based on generally accepted best
practices, and therefore provides an opportunity
for organizations to assess where they stand
relative to these best practices. - Develop plans for improvements to their
information management practices. Organizations
will be able to prioritize improvements in IM
capabilities and pursue high priority opportunity
areas.
8Key Characteristics IM Capacity Check
- Intended as a diagnostic tool for senior
management of the organization. The IM Capacity
Check focuses on - Future direction What capabilities must be in
place in the future to respond to emerging client
demands/changing environment. - Capacity - Expanding/improving organizational
capability. - Priorities - Recognizes that an organization can
only focus on selected improvement areas at any
one time, and cannot be best at everything. - Competencies - Helps identify the information
management competencies needed to move forward. - Senior management - Intended as a diagnostic tool
for senior management of the organization. - Self Assessment - Directed self-assessment tool.
Information is collected through
interviews/workshops, and then validated by
managers collectively. - Support for current change - Builds upon changes
already underway to existing information
management processes.
9Capacity Check Concept of Capabilities
- Capabilities includes people, skills, processes,
technology, policy, management framework and
resources
10IMCC Elements and Criteria
11Principles for Element/Criteria Development
- Bring together the key Elements of information
management practices. The Elements reflect the
integration of capabilities necessary to
efficiently and effectively implement information
management at the enterprise level. - The Elements are based on best practices and
expert advice. The Elements are drawn from
generally accepted best practices and from
subject matter experts. - The Elements are sufficiently robust to apply
across multiple GC organizations. The Elements
reflect common areas of capacity building for
information management. This provides the
opportunity for GC organizations to assess their
standing relative to a common set of best
practices. - The Elements collectively define a comprehensive
baseline. The Elements help to establish a
baseline for IM capacity building, priority
setting and action planning.
12Elements of IM Capacity
13Element Descriptions
14Level/Scale Descriptions
- Capacity 1 Initial (No systematic or formal
approach exists for this capacity. Processes and
practices are fragmented or non-existent. Where
processes and practices exist, they are applied
in an ad-hoc manner.) - Capacity 2 Defined (Processes and practices
are defined to varying degrees and are not
applied consistently. Basic management controls
and disciplines for the capacity are in place.) - Capacity 3 Repeatable (Processes and practices
are defined, well understood and used
consistently across the organization. Processes
and practices are also well documented.) - Capacity 4 Managed (A well-defined framework
exists for this capacity. Process and practices
are measured and managed to ensure delivery of
desired results. Process and practices are
embedded in the values of the organization and
are coordinated in an integrated manner.) - Capacity 5 Optimizing (Focus on continuous
improvement of the capacity. The concepts of
innovation, organizational learning and
continuous improvement of the capacity are
incorporated into the values of the organization
and are consistently applied.)
15The IM Capacity Check Tool Elements and Criteria
16Key Elements of the IMCC Tool
- 3. Management of IM
- Leadership
- The extent to which senior management is aware,
understands, demonstrates commitment to a clear
vision and set of strategic objectives for IM. - Strategic Planning
- Quality of strategic, business and operational
plans for IM, and the linkages between plans,
costs, benefits, resources and controls. - Principles, Policies Standards
- Existence and use of a corporate policy and
management framework to effectively support IM.
Degree to which IM principles, policies and
standards exist, are understood and applied
within the organization. - Roles and Responsibilities
- The extent to which roles, responsibilities,
performance expectations, ownership and
accountabilities are clearly defined, understood
and accepted. Appropriateness of the
organizational and governance structures to
support IM. - Program Integration
- Extent to which the organizations programs and
projects proactively and efficiently integrate IM
principles, policies and standards. - Risk Management
- Mechanisms for identifying, measuring, and
monitoring relevant risks for IM, including
options for risk allocation and risk mitigation. - Performance Management
- Extent to which the achievement of financial and
operating results are embedded into the
performance management framework for IM.
- 1. Organizational Context
- Culture
- Recognition by the organization that
information is a strategic corporate asset
requiring stewardship. Degree of support and
reinforcing behavior that is consistent with
these values. - Change Management
- Mechanisms to facilitate the adoption of change
within IM and related initiatives. - External Environment
- The extent to which the organization conducts
environmental scans and assesses their possible
impacts on IM.
- 2. Organizational Capabilities
- IM Community
- The extent to which IM specialists have the
competencies and capacities to meet the
challenges of IM on a sustained basis. - Expert Advice
- Extent to which expert advisors are available
and utilized for objective commentary and
independent advice for supporting IM. - IM Tools
- The extent to which IM tools efficiently and
effectively support IM. - Technology Integration
- The degree to which IM enabling technologies
are integrated across the organization to support
the delivery of information, programs and
services. - Portfolio Management
- Extent to which mechanisms to plan, track, and
evaluate the overall IM project portfolio are
available to staff. - Project Management
- Extent to which mechanisms to manage projects in
the organization exist to ensure the optimal
design, development and deployment of IM
initiatives. - Relationship Management
- The extent to which mechanisms or processes
exist to facilitate partnerships and
consultations between organizations (public
and/or private) and other stakeholders in support
of effective IM.
17Key Elements of the IMCC Tool (contd)
- 5. Records and Information Life Cycle Management
- Planning
- The extent to which information life-cycle
requirements are incorporated in the development
of policies, programs, services and systems. - Collection, Creation, Receipt and Capture
- The extent to which information collection,
sharing and re-use are optimized and decisions
are documented. - Organization
- The extent to which information is
identified, categorized, catalogued and stored to
effectively and efficiently support the business
process. - Use and Dissemination
- The extent to which the organizations
information can be located, retrieved and
delivered to provide users with timely and
convenient access. - Maintenance, Protection and Preservation
- The extent to which the long-term usability and
safeguarding of information is ensured. - Disposition
- The extent to which organizational retention and
disposal plans are followed to ensure the timely
disposition of information, subject to legal and
policy obligations. - Evaluation
- The extent to which an organization can
assess the overall compliance and performance of
its information management program.
- 4. Compliance Quality
- Information Quality
- The extent to which the organizations processes
for ensuring information is accurate, consistent,
complete and current. - Security
- Extent to which mechanisms are in place to
ensure information is protected from unauthorized
access, use and destruction. - Privacy
- Mechanisms to ensure that an individuals rights
to privacy in the collections and disclosure of
information are respected. - Business Continuity
- The existence of contingency plans and
mechanisms to ensure timely information recovery,
the restoration of essential records and business
resumption in the event of information corruption
or loss. - Compliance
- The extent to which audit and review processes
are in place to ensure awareness of and
compliance with applicable IM legislation,
policies and standards. -
- 6. User Perspective
- User Awareness
- The extent to which information users are aware
of organizations information products and
services. - User Training User Support
- The availability of user training and support
programs to facilitate the access and use of
information. - User Satisfaction
- Mechanisms to measure, evaluate, and learn from
user feedback on information products and
services.
18Guiding Principles for the IMCC Scales
- The capacity scales have entity-wide relevancy
- The capacity scales are sufficiently flexible to
apply to other entities and agencies - The capacity scales are incremental, that is,
each capacity level within a scale builds on the
previous capacity level of the scale - Relative consistency in the description of the
capacity levels across all the scales, i.e., 1 is
1 - Each capacity level description is homogeneous
and does not represents more that one level of
capacity.
19Lessons Learned Interviews and Communications
- Need to prepare interim report in order to
confirm issues, gaps in information, and topics
to pursue in greater detail. - A briefing is required at outset of project in
order for the consultants to have a basic
knowledge of the organization in terms of
structure and lines of business. - The interviewee mix must consist of
policy/operational interviewees to get an
adequate cross-section. . - Although not an audit, it is necessary to get
some examples of the types of information
reported/ examples of documentation (e.g., IM
plans). - Telephone interviews are not as effective.
Conduct in person interviews to the extent
possible. - Due to the levels of interviewees (i.e. ADM/DG),
some areas should be covered off with higher
level questions. Also, keep communications at a
high level prior to interviews. - Team members should be provided with an
orientation which highlights the process steps.
This will help during the interviews. - The interview process must be fluid. Probe the
applicable areas and summarize the areas of
non-involvement.
20Project Team Structure and Expected Involvement
of Organizational Staff
21Overview and Composition of Project Team
- Possible Composition of the Project Team
- Organizational Business/Program representatives
- Organizational IM representatives e.g. records,
library, security, ATIP, etc. - Library and Archives Canada Representative(s)
- Internal Audit
- IT Representatives
- Other members as deemed appropriate
- Overview of the Project Team
- Multi-disciplinary team
- Reviews IM documents
- Assists in interviews
- Helps determine IM Capacity as is and to be
- Identifies opportunities and helps set priorities
- Participates in validating results and reviews
final report
22Project Team Roles and Responsibilities
- Project Team Members will participate in
- IM capacity check training session
- Data collection Interviews and workshops
- Consolidation workshop
- Validation workshop along with additional senior
managers brought in as validators - Reviewing draft and final reports
The typical Project team, consisting of 10-15
members
Typical level of commitment and effort required
for Project team members is approximately 4 - 8
days, over the 3 - 4 months of the project.
- Role and commitment of Chair of Project Team
- Single point of contact for the client Project
team members - Sits on the Steering Committee
- Focal point for communications planning
- Provides QA role
- Responsible for ensuring teams logistics
- Garnering executive support
- Client spokesperson for internal and external
briefings
23Methodology for an IMCC Assessment
24Overall Methodology and Timeline for Assessment
- Joint consultant-organizational team (Project
Team) is trained in implementing Capacity Check. - A mix of techniques are used to collect the
information to do the assessment, including
workshops, interviews, and review of
documentation. - Senior management from the organization being
assessed is involved throughout the process. - Findings are consolidated and an assessment is
done by joint consultant-organizational Project
team. - Follow-up group sessions are held with a
different cross section of senior management team
from the organization being assessed, and the
Project Team to validate the findings, the
capability ratings and the opportunities for
improvement.. - The final step is preparation and approval of a
report outlining the current and future state and
an action plan for the resulting opportunities
and priorities.
25Overall Methodology andTimeline for Assessment
(contd)
3 4 months
- Core project team
- Experts in
- IM
- Program delivery
- Information technology
- Organizational context
- User context
Project Team 0.5 - 1 days
Project Team 1 - 2 days
Project Team and Senior Management .1- 2 days
Project Team 2 - 2.5 days
Organizational managers who are knowledgeable of
the organizations IM practices
26IMCC Methodology
Note The following represents an overview of
the IMCC Methodology. LAC recommends that the
Methodology be followed as shown to obtain
maximum input from stakeholders and
organization-wide buy-in for planned priorities.
27Step 1 Planning
DELIVERABLES
ACTIVITIES
1.1 Project initiation 1.2 Briefing of
organization 1.3 Project team training 1.4 Works
hop/interview planning 1.5 Documentation review
1.6 Develop communications plan
1.7 Presentation to senior management (if
desired)
- Workplan and schedule
- Training manual
- Interviewee list/ no. of interviews
- Interview/workshop guide and info. Package
- List of documentation to be reviewed
- Communiques
- Challenges
- Obtaining management commitment and resources
support to the project. - Establishing an interviewee list that is
representative of the organization (e.g., by
management level, sector, region, operational
versus policy). Between 8 to 10 interviews and 1
to 2 interview workshops are standard. - Customizing and establishing the appropriate
level of detail for the interview guide and
information package to be distributed to managers.
28Step 1 - Sample Assessment Timeline
29Step 2 - Data Collection
ACTIVITIES
DELIVERABLES
2.1 Develop/adapt interview and workshop
guides 2.2 Schedule and Conduct interviews and
workshops 2.3 On-line survey (if and when
required) 2.4 Documentation review 2.5 Summarize
findings
- Interview and workshop guides
- Interview and workshop notes
- On-line survey results (when required)
- Results of documentation review
- Interview/workshop notes reported by criteria
- Challenges
- Ensuring all criteria are covered through
interviews/workshops. - Reporting findings in a systematic/structured
approach based on Capacity Check criteria. - Confidentiality of interviews.
- Focus on actual status rather than hypothetical
(i.e., clearly distinguish between what the
organization should be doing versus what the
organization is actually doing at this time).
30Step 2 - Data Collection Approaches
Interviews with senior managers and other
internal and external stakeholders.
Document and literature review.
Workshops and site visits.
31Step 2 - Data Collection Process
Workshops tend to be for senior staff/management.
Typical size is 12-15 participants. Two
workshops should be enough for most organizations.
Interviews tend to be for executive management.
The number of interviews depends on the size and
breadth of the organizationtypically 12-15, but
will vary.
Data collection efforts include organizational
policies and guides, performance reports, org
structure, governance models, IM and strategic
plans. Any relevant documentation identified
during the interviews is also collected and
reviewed.
Interviews questions are sent to interviewees in
advance. A Project Team member attends with the
consultant conducting the interview. The Project
Team member helps in taking notes and
consolidating findings
32Step 3 - Consolidation of Results
DELIVERABLES
ACTIVITIES
3.1 Consolidate findings by criteria 3.2 Project
team workshop to summarize findings and
opportunities for improvement/ issues for each
criteria 3.3 Project team establishes preliminary
rating for each criteria, and rationale 3.4 Prepar
e preliminary report
- Findings/ opportunities by criteria
- Conclusions reported by major element
- Ratings as per criteria, as-is and to-be
- Challenges
- Identifying overall patterns/trends given sectors
within organization often operate in a different
business environment. - Ratings and priorities should be secondary to
findings, conclusions and improvement
opportunities.
33Step 3 - Consolidated Results Template (prepared
for each criteria)
Opportunities
Findings and Issues
- Identified opportunities related to each criteria
are inserted.
- Summary of findings and issues related to each
criteria is inserted.
CAPACITY 1 2 3 4 5
Roles and Responsibilities The extent to which IM roles and responsibilities are clearly defined, understood and accepted. Appropriateness of the organization and governance structures to support IM. IM roles and responsibilities are not well defined. The organization and governance structures are not appropriate for the management of IM initiatives. IM roles and responsibilities are generally defined but not well understood. Some overlaps and gaps exist vis-à-vis roles and responsibilities. Minimal governance structures exist in support of IM. The IM governance structure may be fragmented or inappropriately positioned within the organization. IM roles and responsibilities are clearly defined and understood, and generally aligned with the organizations objectives. Little or no overlaps or gaps in IM responsibilities exist. The governance structure is appropriately positioned within the organization. Effective governance structures are in place. Changes to IM roles, responsibilities, organization and governance structures are made quickly and pro-actively following regular consultation with stakeholders. An IM champion is responsible for ensuring the integration of IM practices across both administrative and program areas. IM roles, responsibilities, organization and governance structures are continuously reviewed and updated to reflect changing business and technology environments.
34Step 3 - Assessing the Capabilities- As Is and
To be assessment - Sample
- Current capabilities are assessed based on key
elements of the IM Capacity Check, and criteria
provided for each key element. - The capabilities depicted within the criteria
represent different states or plateaus that the
organization may strive to achieve. The
descriptions are incremental. - The capability descriptions are based on
generally recognized best practices, but have
been customized to reflect the Government of
Canada context. - The Organization identifies which level of
"maturity" would be the most appropriate in
support of its business needs, priorities and
consistent with its capabilities. - A rating system of 1 to 5 is used. A rating
of 5 does not necessarily mean goodness, but
rather, maturity of capability. The ideal
maturity rating for any area is dependent on the
needs of the Organization.
CAPACITY 1 2 3 4 5
Roles and Responsibilities The extent to which IM roles and responsibilities are clearly defined understood and accepted. Appropriateness of the organization and governance structures to support IM. IM roles and responsibilities are not well defined. The organization and governance structures are not appropriate for the management of IM initiatives. IM roles and responsibilities are generally defined but not well understood. Some overlaps and gaps exist vis-à-vis roles and responsibilities. Minimal governance structures exist in support of IM. The IM governance structure may be fragmented or inappropriately positioned within the organization. IM roles and responsibilities are clearly defined and understood, and generally aligned with the organizations objectives. Little or no overlaps or gaps in IM responsibilities exist. The governance structure is appropriately positioned within the organization. Effective governance structures are in place. Changes to IM roles, responsibilities, organization and governance structures are made quickly and pro-actively following regular consultation with stakeholders. An IM champion is responsible for ensuring the integration of IM practices across both administrative and program areas. IM roles, responsibilities, organization and governance structures are continuously reviewed and updated to reflect changing business and technology environments.
Where the organization may strive to be in the
future
Existing maturity
Future capability
35Step 3 - As-Is and To-Be Assessments overview
36Step 4 - Validation of Findings
ACTIVITIES
DELIVERABLES
4.1 Conduct workshops with Senior Managers
(Validators) and the Project Team to validate
findings, conclusions and ratings 4.2 Discuss
relative importance of criteria and opportunities
for improvement 4.3 Update report
- Validation of the findings, conclusions and
ratings - Opportunities for improvement
- Establish 5-10 priorities
- Challenges
- Adopting a forward looking strategic approach.
- Being honest about major improvement opportunity
areas. - Reaching consensus on priority areas of
improvement. - The Validators may dictate the approach for the
deliverables of this session. This methodology
is sufficiently flexible to allow a customized
approach to capture the deliverables.
37Step 5 Developing an Action Plan
ACTIVITIES
DELIVERABLES
5.1 Present results to senior management 5.2 Senio
r management assesses where the organization
should be in terms of target capability
ratings 5.3 Senior management prioritizes the
criteria and opportunities 5.4 Develop action
plan
- Target capability ratings
- Relative priority of criteria
- Ranking of opportunities
- Implementation strategy and action plan
- Challenges
- Senior management needs to take ownership of the
results. - Developing an action oriented plan. The
organization needs to focus on the high priority
areas. - Summarizing and reporting the findings in a
manner that accommodates needs of different
levels of management. The results will need to
be communicated on an organization-wide basis. - Need to maintain linkages between the various
initiatives currently ongoing in the organization
in support of IM.
38Step 5 - Summary of Priorities and Opportunities
- Template
To facilitate the prioritization of the projects,
we graph them in the chart below, based on two
factors level of effort to implement, and
expected impact that the initiative will have on
the organization. Those of low effort and high
impact may be likely candidates to begin with, to
gain some initial successes.
Opportunity 5
Opportunity 2
Opportunity 4
Opportunity 1
Opportunity 3
39Step 5 - Transition Map Template
This graph outlines the various opportunities
and their intended occurrence over time.
Medium Term
Short Term
Long Term
Opportunity 1
Opportunity 2
Opportunity 3
Opportunity 4
Year 1
Year 2
Year 3
40Step 5 - Contents of Assessment Report
- Executive Summary
- Key Themes
- Summary of Findings
- Highlights of Findings
- Projects
- Action Plan
- Background
- Overview
- Objectives of the Capacity Check
- Key Characteristics
- Key IM Elements Examined
- The Mechanics of the Capacity Check
- Project Objectives, Scope and Process Overview
- Summary of IM Capacity Check Assessment findings/
opportunities (by criteria) - Lessons Learned
- Appendix A - Background Information
- Interviews
- Workshops
41Element and Scale Descriptions
Note Due to proprietary considerations, full
descriptions of the original 6 IMCC Elements and
32 Criteria and the rating scales are only
available from Library and Archives Canada.
Contact us via e-mail at IMGI_at_lac-bac.gc.ca
42Additional Resources
After a IM Capacity Check is completed Library
and Archives Canada has a number of Guides, Tools
and Best Practices to help improve IM Capacity in
your areas of priority and need. Additional
material useful for conducting an IM Capacity
Check assessments such as Interview Guides and
Communiqués are also available. For information
please contact Information Management
Centre Email imgi_at_archives.ca Telephone (819)
934-7519