Title: Case Study
1Project Data
Project Cost 1.8 Billion Total
GFA 58,000m2 Project Inception mid
1995 Commencement on Site Feb 1997 Completion
Date Jun 1999 Completion of Commissioning Mar
2000
Case Study
Sheung Shui Slaughter House
2Project Goal
Triple Benefits
Case Study
Sheung Shui Slaughter House
3 Cost Benefit
- Publicly operated abattoir was running with a
deficit
Case Study
- Privatize operation for cost-effective reasons
Sheung Shui Slaughter House
4Land use Benefits
- Re-provision the 3 existing abattoirs
Case Study
- Releasing 4.19 hectares of land for new
developments which are more compatible with the
surrounding areas
Sheung Shui Slaughter House
5Environmental Benefit
Existing facilities built in the 60s, creating
environmental nuisance to the densely populated
area
Case Study
New slaughter house located away from built-up
areas but convenience to rail
Sheung Shui Slaughter House
6Environmental Benefit
Trains no longer have to go into town and people
living along the railway line need not suffer the
noise and odour nuisance caused by the pigs
cattle
Case Study
Purposely built railway direct off-loading of
livestock from train to lairage
Sheung Shui Slaughter House
7Procurement Strategy
Design Construct Commissioning Contract
- One point control from design to operational
stage - Contractor to ensure compliance to performance
criteria
Case Study
Novation Contract
- Appoint consultant to produce design for tender
- Awarded contractor to employ the consultant
- Adv retain control of design to ensure needs
being met
Sheung Shui Slaughter House
8Environmental Management
Construction Stage
- Contractor to implement mitigation measures as
recommended in the EIA report
Case Study
Operation Stage
- Operator to implement ISO 14001 to ensure
satisfactory environmental performance during
operation
Sheung Shui Slaughter House
9Hygienic Slaughter Lines
- Designed to highest international standards of
hygiene, e.g. EC (European Community) USDA
(U.S. Department of Agriculture) standards
Case Study
- Fully automatic mechanized devices throughout the
process
Sheung Shui Slaughter House
10Solar Hot Water System
- Consumption of hot water 630m3 per day
Case Study
- Provision of 450 solar panels to pre-heat water
Sheung Shui Slaughter House
11Heat Pump for Energy Efficiency
- Utilize rejected heat from air-cooling operation
to further heat up water
Case Study
Sheung Shui Slaughter House
12Waste Water Treatment
- 5000 m3 waste water / day
- Concentration 10 times higher than domestic waste
water
Case Study
- Pre-treat waste water using bacteria and other
- micro-organisms to achieve domestic effluent
standard before passing to Shek Wu Hui Sewage
Treatment Plant
Sheung Shui Slaughter House
13Use of Grey Water
- Effluent water from Shek Wu Hui Sewage Treatment
Plant for cooling the condenser of the A/C plant
Case Study
Sheung Shui Slaughter House
14Odour Control
- Odour generated 1,000 OU vs.
- Acceptance standard 5 OU
Case Study
- Chemical scrubbers odour neutralizing agent
system for odour control - 5 OU is achieved at sensitive receivers
Sheung Shui Slaughter House
15Noise Mitigation
- Operation hours from midnight to early morning
Case Study
- Acoustic louvres installed at lairage block
- Perimeter noise barrier walls along railway
- off-loading areas
Sheung Shui Slaughter House