Title: Case Study


1
Project Data
Project Cost 1.8 Billion Total
GFA 58,000m2 Project Inception mid
1995 Commencement on Site Feb 1997 Completion
Date Jun 1999 Completion of Commissioning Mar
2000
Case Study
Sheung Shui Slaughter House
2
Project Goal
Triple Benefits
  • Cost Benefits

Case Study
  • Land use Benefits
  • Environmental Benefits

Sheung Shui Slaughter House
3

Cost Benefit
  • Publicly operated abattoir was running with a
    deficit

Case Study
  • Privatize operation for cost-effective reasons

Sheung Shui Slaughter House
4
Land use Benefits
  • Re-provision the 3 existing abattoirs

Case Study
  • Releasing 4.19 hectares of land for new
    developments which are more compatible with the
    surrounding areas

Sheung Shui Slaughter House
5
Environmental Benefit
Existing facilities built in the 60s, creating
environmental nuisance to the densely populated
area
Case Study
New slaughter house located away from built-up
areas but convenience to rail
Sheung Shui Slaughter House
6
Environmental Benefit
Trains no longer have to go into town and people
living along the railway line need not suffer the
noise and odour nuisance caused by the pigs
cattle
Case Study
Purposely built railway direct off-loading of
livestock from train to lairage
Sheung Shui Slaughter House
7
Procurement Strategy
Design Construct Commissioning Contract
  • One point control from design to operational
    stage
  • Contractor to ensure compliance to performance
    criteria

Case Study
Novation Contract
  • Appoint consultant to produce design for tender
  • Awarded contractor to employ the consultant
  • Adv retain control of design to ensure needs
    being met

Sheung Shui Slaughter House
8
Environmental Management
Construction Stage
  • Contractor to implement mitigation measures as
    recommended in the EIA report

Case Study
Operation Stage
  • Operator to implement ISO 14001 to ensure
    satisfactory environmental performance during
    operation

Sheung Shui Slaughter House
9
Hygienic Slaughter Lines
  • Designed to highest international standards of
    hygiene, e.g. EC (European Community) USDA
    (U.S. Department of Agriculture) standards

Case Study
  • Fully automatic mechanized devices throughout the
    process

Sheung Shui Slaughter House
10
Solar Hot Water System
  • Consumption of hot water 630m3 per day

Case Study
  • Provision of 450 solar panels to pre-heat water

Sheung Shui Slaughter House
11
Heat Pump for Energy Efficiency
  • Utilize rejected heat from air-cooling operation
    to further heat up water

Case Study
Sheung Shui Slaughter House
12
Waste Water Treatment
  • 5000 m3 waste water / day
  • Concentration 10 times higher than domestic waste
    water

Case Study
  • Pre-treat waste water using bacteria and other
  • micro-organisms to achieve domestic effluent
    standard before passing to Shek Wu Hui Sewage
    Treatment Plant

Sheung Shui Slaughter House
13
Use of Grey Water
  • Effluent water from Shek Wu Hui Sewage Treatment
    Plant for cooling the condenser of the A/C plant

Case Study
Sheung Shui Slaughter House
14
Odour Control
  • Odour generated 1,000 OU vs.
  • Acceptance standard 5 OU

Case Study
  • Chemical scrubbers odour neutralizing agent
    system for odour control
  • 5 OU is achieved at sensitive receivers

Sheung Shui Slaughter House
15
Noise Mitigation
  • Operation hours from midnight to early morning

Case Study
  • Acoustic louvres installed at lairage block
  • Perimeter noise barrier walls along railway
  • off-loading areas

Sheung Shui Slaughter House