BARB - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

BARB

Description:

Tony. WEARN. Re-writing all of the existing specifications. The creation of new databases ... Recruiting and installing a completely new, fresh panel against a ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 15
Provided by: Lind172
Category:
Tags: barb | rewriting

less

Transcript and Presenter's Notes

Title: BARB


1
(No Transcript)
2
TonyWEARN
3
  • Re-writing all of the existing specifications
  • The creation of new databasesand delivery
    mechanisms
  • Introducing a new panel design
  • Recruiting and installing a completely new, fresh
    panel against a more stringent panel control
    selection procedure

4
Universes Changes
  • Audience Universe Change Categories 01 vs 02
  • Adults 25-34 - 9
  • H/ws with kids 0-3 - 8
  • Adults 16-34 - 6
  • Kids 4-9 - 6
  • ABC1s 1
  • Kids 10-15 4
  • Adults 35-64 5

5
  • Larger panels for London and Midlands (35 of the
    population)
  • Some other regions are above or near to previous
    reporting levels

6
  • Regional Distributionis generally proportional
    to new panel design
  • A multi-channel panel of 1650 homes

7
  • Previous Panel

New Panel
8
14
18
27
24
28
65
16
Up to 1 Year
1-3 Years
Up to 6 Months
3-5 Years
5-10 Years
6 Months-1 Year
10 Years
Over 1 Year
8
  • Uncovered Set Viewing
  • Guest Viewing

9
Uncovered Set Viewing
Uncovered Set Viewing
12
10
8
6
4
2
0
06-01-01
13-01-01
20-01-01
27-01-01
03-02-02
10
Guest Viewing
12
10
Previous Current
8
6
4
2
0
06-01-01
13-01-01
20-01-01
27-01-01
03-02-02
10-02-02
17-02-02
11
Total TV ViewingAverage Weekly Hours
Hours
30
Old Panel
New Panel
20
10
0
23-12-01
23-12-01
13-01-02
20-01-02
27-01-02
03-02-02
10-02-02
17-02-02
Source BARB, ATR, Live inc guests, Dec-Feb 2002
12
Weighting
  • Removal of Category Balancing and Adjust to
    Universe procedures
  • Single consolidated rim-weighting scheme
  • Over 1500 targets
  • Extended weighting control but increased
    likelihood that range of weights will be greater

13
Immediate Priorities
  • Establishment of complete panel
  • Increasing panel size will reduce variability

14
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com