Title: International Design Study of the Neutrino Factory
1International Design Studyof the Neutrino Factory
2The International Scoping Study
a step on the way!
- One-year study NuFact05 NuFact06
- Built on previous work
- Super beam
- CERN MW w/s, studies in US and Japan
- Beta beam
- EU Study supported by EU under FP6
- Neutrino Factory
- US Studies I, II, IIa
- ECFA/CERN Study
- NuFact-J Study
- Emphasis
- Incorporate progress made since previous studies
- e.g. MERIT, MICE, MuCOOL, NSFFAG,
- Recognition of importance of holistic
consideration of source and detector - Recognition of importance of an international
approach
3ISS organisation
- Parallel study of
- Physics performance
- Accelerator facility
- Neutrino Detectors
- International participation
- Programme committee and working groups
4ISS outcomes
- Principal outcomes
- Defined baselines for Neutrino Factory
accelerator and detector systems - Established importance of
- Low muon-detection threshold for ?e ? ??
(golden) channel - New analysis of magnetised-iron calorimeter gives
good performance - ?e ? ?? (silver) and ?? ? ?e (platinum)
channels essential to search for non-S?M
processes - e.g. non-unitarity of MNS matrix
- Comparison of sensitivity of various options
- Report in preparation
5Comparison ?13
SPL Systematics 2 5
T2HK Systematics 2 5
WBB Systematics from proposal
Beta beam ? 100 500 kT H2O Ç (130 km) ?
350 500 kT H2O Ç (730 km)
Neutrino Factory Golden, 4000, Eµ 50
GeV Golden (4000 km), Golden (7500 km) Eµ 20
GeV
6Comparison mass hierarchy
SPL Systematics 2 5
T2HK Systematics 2 5
WBB Systematics from proposal
Beta beam ? 100 500 kT H2O Ç (130 km) ?
350 500 kT H2O Ç (730 km)
Neutrino Factory Golden, 4000, Eµ 50
GeV Golden (4000 km), Golden (7500 km) Eµ 20
GeV
7Comparison CP violation
SPL Systematics 2 5
T2HK Systematics 2 5
WBB Systematics from proposal
Beta beam ? 100 500 kT H2O Ç (130 km) ?
350 500 kT H2O Ç (730 km)
Neutrino Factory Golden, 4000, Eµ 50
GeV Golden (4000 km), Golden (7500 km) Eµ 20
GeV
8The ISS baseline
- 100 (50) kT magnetised iron detector
- Two baselines
- 3000 5000 km
- 7000 8000 km
- Store µ µ- simultaneously
- 1021 muon decays/yr
- Eµ 25 GeV
9The International Design Study
initiative
- NuFact06
- Made the case for high-sensitivity
neutrino-oscillation programme for second half of
next decade and concluded
10NuFact06 recommendation
- Neutrino Factory IDS
- Continue holistic approach of ISS
- Goal deliver Neutrino Factory CDR by 2012
11Strategic review conclusions
- Reviews of particle-physics strategy in Europe
and the US concluded that - Future neutrino programme be developed as an
internationally coordinated programme - Goal to define the optimal programme around
2012 - NuFact community aspiration matches this
12(No Transcript)
13ISS/IDS transition as seen at NuFact06
- Progress since NuFact06
- IDS initiative (transition phase) established
- EU FP7 DS (Euro?) submitted
- Ranked 1, now negotiating contract
- See M.Lindroos, WG3, Tuesday, 1500
- IDS initiative now drawing to an end
- Goal to launch IDS at this meeting NuFact07
14IDS ad hoc Steering Group
- Formed Oct/Nov 2006
- Met nine times
- http//www.hep.ph.ic.ac.uk/ids/organisation/meetin
gs.html - Achievements
- NF IDS WWW page and mailing lists
- See http//www.hep.ph.ic.ac.uk/ids
- Over-arching goals for NF IDS (next slide)
- http//www.hep.ph.ic.ac.uk/ids/docs/IDS-ahSG-07-01
.pdf - First plenary IDS meeting at CERN (29-31 March
2007) - See http//www.hep.ph.ic.ac.uk/ids/communication/c
ern-2007-03-29/index.html - IDSahSG endorsed at CERN meeting
- Representation
- K.Long (Co-ordinator), A.Blondel, A.Bross,
P.Dornan, M.Dracos, R.Edgecock, P.Huber, H.Kirk.
Y.Kuno, Y.Mori, M.Lindner, M.Lindroos, N.Mondal,
Y.Nagashima, V.Palladino, S.Pascoli, P.Soler,
M.Zisman
15IDS goals
- Goal of NF IDS
- Neutrino Factory RDR (2012)
- Engineering designs for most components
- Neutrino Factory IDR (2010)
- Marks transition from
- Concept development/RD with engineering support
to - Significant engineering effort with
concept-development/RD programmes to mitigate
risks
16NuFact07 IDS-NF launched
Steering Group
A.Blondel, K.Long (chair), M.Zisman,
Y.Kuno, A.Donini, P.Huber, S.Pascoli,
W.Winter, S.Berg, M.Medahi, Y.Mori, C.Prior,
A.Bross, A.Cervera, N.Mondal, P.Soler
W/g leaders or nominee to serve on steering group
17Next steps summary
- Framework Programme 7 Approved!
- Design Study Coordinator R.Edgecock (RAL)
- Management board Edgecock, Long (NF), Lindroos
(BB), Dracos (SB) - Super-beam M.Dracos (IN2P3), M.Zito (CEA)
- Beta-beam M.Lindroos (CERN), A.Fabich (CERN)
- Neutrino Factory J.Pozimski (Imperial), M.Medahi
(CERN) - Detectors P.Soler (Glasgow)
- Physics P.Hernandez (Valencia), A.Donini
(Madrid) - Neutrino Factory and Muon Collider workshop
- The Coseners House 22-24 October 2007
- 1st plenary IDS-NF meeting
- RAL most likely 16-18 January 2008