Center St. Bridge Expansion
  • Anthony Podegracz, P.E.
  • Kimley-Horn and Associates

2
Center St. Bridge Expansion
  • Cantilevered Bikeway/Walkway Phase I of Piru
    Rail/Trail Project
  • Owner Ventura County Transportation Commission
  • Project Manager Ventura County Public Works
    Agency
  • Design Consultant Kimley-Horn and Associates,
    Inc
  • Contractor Mendez Concrete
  • Construction Contract Award 1,696,582
  • Final Construction Cost 1,696,192

3
Center St. Bridge Expansion
  • Center St. Bridge
  • Rural Community link over Piru Creek
  • 409 Existing Cast-in-place Box Girder with
    Superelevated Curve
  • Two lane bridge with 4 Shoulders

4
Center St. Bridge Expansion
  • Project Constraints
  • Environmental
  • Sensitive Creekbed
  • Swallow Nesting
  • Structural
  • Minimum Alterations to Bridge
  • New Deck must be able to Support Vehicles
  • Restricted Access
  • 24 Circular Holes in Bottom of Bridge
  • No Equipment allowed in Creekbed

5
Center St. Bridge Expansion
  • Cantilevered Walkway
  • Separate Bikes and Peds from Roadway
  • 10 Wide Exodermic Deck System attached to
    Existing Cast-in-place Box Girder
  • Lightweight System
  • No Structural Modification required on existing
    Bridge
  • Post-tensioned

6
Center St. Bridge Expansion
  • Approach Wall
  • Hollow Box Wall
  • Poured-in-place Retaining Wall System attached to
    Existing Retaining Wall
  • Minor Modifications to Existing Roadway
  • All work completed within existing County
    Right-of-way

7
Center St. Bridge Expansion
  • Construction Methods
  • No Creekbed Access
  • Work done from Above
  • Contractor Basket
  • Work within Existing Bridge
  • Access Holes in Bottom of Existing Bridge
  • Additional Temporary Holes Added to Top of Bridge
    Due to High Water Level

8
Center St. Bridge Expansion
  • Construction Process
  • Web Plates Attached

9
Center St. Bridge Expansion
  • Construction Process
  • Post-Tension Bars Attached and Tensioned

10
Center St. Bridge Expansion
  • Construction Process
  • Falsework and Deck System Placed

11
Center St. Bridge Expansion
  • Construction Process
  • Deck Poured

12
Center St. Bridge Expansion
  • Construction Process
  • Approaches Completed and Railing Attached

13
Center St. Bridge Expansion
  • Started February 2005
  • Completed October 2005
Write a Comment