Title: Monthly Meeting Global Compact Society
1Monthly Meeting Global Compact Society
- REC Corporate Office
- 29th August 2008
2About REC
- A premier financial institution
- A Development Agency Focus on Rural Semi
Urban areas - Incorporated in July 1969
- Nil Budgetary support of Government of India
- A nodal agency to implement GOI programme of
RGGVY - Schedule A PSU with Nav Ratna status
contd.
3About REC
- MOU Award
- Continuously Excellent since 1993-94
- Bagged Top 10 PSUs Award for 1991-92, 2001-02
2004-05 - Rating
- Domestic Highest ratings by CRISIL, FITCH and
CARE - International at par with sovereign rating
FITCH and MOODY
4- RAJIV GANDHI GRAMEEN VIDYUTIKARAN YOJANA (RGGVY)
- CDM PROJECT DEVELOPMENT IN DISTRIBUTION SECTOR
5RGGVY
- In 5 years
- Electrify all villages and habitations
- Provide access to electricity to all households
- Give electricity connection to Below Poverty Line
(BPL) families free of charge
contd.
6RGGVY
- Through creation of
- Rural Electricity Distribution Backbone (REDB)
with atleast on 33/11 kV (or 66/11 kV) substation
in each block - Village Electrification Infrastructure (VEI) with
atleast one distribution transformer in each
village/habitation - Decentralized Distributed Generation (DDG)
systems where grid supply is not feasible or cost
effective
7RGGVY-X PLAN PROJECTS
- Target
- Coverage of un-electrified villages - 67,012
(Nos) - Coverage of BPL HH -
83,10,286 (Nos) - Sanction cost -
9696.27 (Rs Cr) - Achievement (As on 16.08.08)
- Electrification of villages - 50,
316 (Nos) - Electricity connection to BPL HH - 31,12,212
(Nos) - Amount disbursed -
8394.18 (Rs cr)
contd.
8RGGVY-XI PLAN PROJECTS
- Target
- Coverage of un-electrified villages - 48,464
(Nos) - Coverage of BPL HH
- 1,58,75,344 (Nos) - Sanction cost
- 15,861.89 (Rs Cr) - Achievement
- Amount disbursed
- 751.38 (Rs cr)
9Role of REC in Development of CDM Projects
10CDM Project Development by REC
- REC designated as Nodal Agency by MoP for
assisting states in preparation of CDM projects
in the field of Distribution sector - So far, no loss reduction/energy savings project
in distribution sector qualified under CDM and
also no approved large scale methodology. - REC in association with KfW, Germany initiated a
programme for CDM Project Development on pilot
basis .
contd.
11CDM Project Development by REC
- PricewaterhouseCoopers (PwC) engaged for
providing consultancy services for CDM
development - In the first instant, a HVDS Project of APSPDCL,
a beneficiary Discom under REC- KfWs Ist line of
credit has been chosen for CDM Development. - Diagnostic study conducted by PwC shows CDM
Potential in the project
contd.
12CDM Project Development by REC
Impediments in CDM Project Development The
diagnostic study of PwC reveals the following
major impediments in the CDM Development of the
project in the Distribution sector
- No baseline data available (ie measurable
technical loss in the project area) because of
unmetered electrical connection in the
agricultural area. Even where meters were
available, the accuracy of the meters and hence
the meter readings were not reliable - Even when baseline is established today, the
baseline may not be permanent since new
connections in the project area would result in
possibility of shift in the baseline - Distributed project activity involving
complicated monitoring of technical loss
13CDM Project Development by REC
Baseline establishment Since metering of all
consumers for the purpose of baseline
establishment would involve huge investment,
sampling methodology is proposed. Accordingly,
- Feeders are being classified and grouped based on
load survey data ( Since load survey data was
quite old, it had to be redone from field log
books) - Meters would be provided in the identified
feeders and associated agricultural consumers - Reading would be taken for a minimum period of 1
year to arrive at baseline loss level.
contd.
14CDM Project Development by REC
- Pending baseline establishment for the project ,
4 nos of PDDs have been developed and filed with
MoEF by APSPDCL on 29th May 2008 - 3 nos of PDD have already been listed in the
National CDM Authority Meeting of MoEF held on
13th August 2008. - 1 no of PDD is listed in the meeting being held
on 5th September 2008
contd.
15CDM Project Development
- APSPDCL is in the process of appointing
validators for the project. Bids invited from the
accredited validators of CDM EB - REC is in the process of initiating development
of methodology - Energy efficiency projects in distribution sector
- Energy efficient pumpsets
- Sectoral Developments
- Methodology approved for Amorphous Core
Transformer recently - Programmatic CDM Project Development for CFL
replacement is in advance stage being
coordinated by BEE/CEA/GTZ - CFL bulbs being provided free of cost for all BPL
connections under RGGVY during XIth Plan
16CDM Project Development by REC Salient Features
of PDD
17Thank you