Transcript and Presenter's Notes

Title: EDCS PDG


1
EDCS PDG
  • TAD Gene Wiehagen
  • Chair Bob Richbourg
  • Vice Chair / Secretary Dale Miller

Total attendance 27 Number of Papers
presented 0 Number of Invited Presentations 3 Pa
nel discussions 0
2
Goals for Meeting
  • Provide information on the upcoming ISO Working
    Draft 5 of the EDCS
  • Present results from the February 2001 ISO
    meeting which considered comments against WD4 of
    the EDCS
  • Provide status of old business
  • Discuss plans for PDG activity relative to the
    next review comments input cycle (WD5)
  • Solicit additional volunteers

3
Key Points
  • Key Point 1- Old Business. A few old business
    items remain open.
  • Key Point 2- Definitions Guidance. Need to
    follow formal guidance on crafting definitions.
  • Key Point 3- Future Schedule. EDCS WD 5 release
    expected mid-May, 2001

4
Key Point 1 Old Business
  • Specific SISO product to be created remains
    unknown given the recommendations of the study on
    software products. Primary focus of PDG
    remains the EDCS Standard evolution.
  • Update of 00F-SIW-071. a report will be
    generated and published on the reflector for use
    as a EDCS tutorial and guide for reviewers.
  • Coordination with RPR FOM group. Recently agreed
    LM will incorporate appropriate portions of EBV
    into the EDCS.

5
Key Point 2 Formal Guidance
  • The most recent PDG comments focused on providing
    definitions for EDCS codes. Only informal
    guidance on the structure of definitions required
    for ISO compliance existed.
  • There now exists more complete set of
    instructions on content and format of definitions
    as a result of the ISO February 2001 meeting.
    This will be posted to the EDCS reflector.

6
Key Point 3 Future EDCS Schedule
  • Two options available for submission of PDG
    comments. SISO now has Cat C Liaison status to
    SC24 and may submit directly or may continues to
    submit via ANSI H3.9.
  • Key dates for next review will be posted to the
    EDCS reflector as they become available. The
    date and site for the next PDG meeting will also
    be discussed on the reflector and will include
    teleconference options.

7
EDCS WD5 Key Dates
  • Date Event
  • May 24 EDCS WD5 released
  • TBD EDCS PDG Meeting
  • TBD ANSI H3.9 meeting
  • Aug 3 Comments to WG8
  • Aug 20 ISO JTC1 SC24 WG8 meeting
  • Palm Springs

8
SRM PDG
  • TAD Gene Wiehagen
  • Chair Kevin Trott
  • Vice Chair / Secretary Guy Schiavone

Total attendance 29/3
Number of Papers presented 0 Number of
Invited Presentations 1 Panel discussions
0
  • 29 SISO members attended
  • 3 PDG members - no quorum, no official meeting

9
Goals for Meeting
  • Present update on the next release of ISO
    Working Draft 5 of the SRM (now expected 11
    April)
  • Discuss plans for PDG activities relative to the
    next review comments input cycle (WD5)
  • Solicit volunteers

10
SRM WD5 Key Dates
  • Date Event
  • 11 April SRM WD5 released for comment
  • 30 April ANSI H3.0 Meeting
  • Early - Mid May SRM PDG Meeting??
  • 12-16 June ISO JTC1 SC24 WG8 Meeting

11
TAD Recommendations to SAC
  • 1. Request SAC provide PDGs with additional
    tools to assist in the ISO Standardization
    Process such as an on-line library containing
  • Copy of proper version of The Oxford English
    Dictionary (OED)
  • SI Guide for International Systems of Units
  • Any additional ISO Standardization Handbooks or
    Guidance Documents.
  • 2. PDGs should continue to use ANSI H3.9 as
    preferred body to funnel comments to ISO. Use
    Class C Liaison to SC 24 as secondary route.

12
Comments on Draft ISO SRM Standards
  • SRM Working Draft 5 will be made available on
    password protected web site with notification via
    PDG reflector
  • Spatial Reference Model (SRM) abstract
    specification
  • Comment format
  • Separate groups of General, Technical,
    Editorial comments
  • Single point in each comment
  • Reference Clause/Section, Paragraph (e.g.
    3rd), Sentence
  • Comment Whats incorrect/missing/unnecessary?
  • Proposed Change What should be
    changed/added/removed?
  • Rationale/References Why? Who says so?
  • Post comments on PDG reflector - MS Word 6 or
    97/98 preferred
Write a Comment