Providing Resource Planning Guidance to Individual Utilities - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Providing Resource Planning Guidance to Individual Utilities

Description:

Counting critical hydro generation. Including a conservative estimate for spot market supply and other non-firm resources ... Non-firm resources = 4,500 MWa or ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 9
Provided by: powerbusi7
Category:

less

Transcript and Presenter's Notes

Title: Providing Resource Planning Guidance to Individual Utilities


1
Providing Resource Planning Guidance to
Individual Utilities
  • PNW Resource Adequacy Technical Committee Meeting
  • April 26, 2007

2
Objectives
  • Use the regional standard to provide non-binding
    guidance to individual utilities to aid them in
    their resource planning processes
  • Must not trample on the jurisdiction of states
    or prerogatives of individual utilities in
    planning and acquiring resources to meet load

3
Steering Committees Charge
  • Develop a simple rule of thumb process to
    convert regional energy and capacity targets into
    useful values for utilities.
  • Utilities can use this process as a general
    screening tool but will continue to use their own
    methods to develop resource plans.

4
Guidance for Energy Planning
  • Primarily for hydro-based utilities
  • Must have sufficient resources to meet the
    average annual demand
  • Counting critical hydro generation
  • Including a conservative estimate for spot market
    supply and other non-firm resources
  • Resulting in no more than a 5 LOLP

5
Guidance for Capacity Planning
  • Primarily for thermal-based utilities
  • Must have sufficient resources to
  • Maintain hourly operating reserves
  • Meet peak duration period load deviations for a
    1-in-20 year temperature event
  • Resources include a conservative estimate for
    spot market supply and other non-firm supplies
  • Resulting in no more than a 5 LOLP

6
Developing a Rule-of-Thumb Process
  • Need to take into account dependence on
  • Non-firm hydro and hydro flexibility
  • Spot market supply
  • Other non-firm resources
  • Each utilitys targets will likely vary from the
    regional targets

7
Form for a Rule-of-Thumb Method
  • Determine the percent of non-firm to firm hydro
  • Determine the desired dependence on the market
  • Determine the desired dependence on IPPs (or
    in-region market)
  • R function (non-firm hydro, market, IPP)
  • Utilitys FIRM resources (1 R) Load

8
Regional Dependence onNon-firm Resources
  • 3,000 MWa of in-region IPP generation
  • 1,500 MWa of spot market supply, hydro
    flexibility and other non-firm resources
  • Non-firm resources 4,500 MWa or about 20 of
    the regional load
  • Regional firm resource 80 firm load