1st IPT with C/S/A (mid-February) Jan 07. Jul 07. Develop straw man for 1st IPT ... JC2 JFC rewrite underway First IPT tentatively scheduled for mid-February ... – PowerPoint PPT presentation

Number of Views:261
Avg rating:3.0/5.0
Slides: 5
Provided by: lcdrbrett
Category:

less

Transcript and Presenter's Notes

Title: Joint Command and Control Joint Functional Concept


1
Joint Command and Control Joint Functional Concept
UNCLASSIFIED
  • Lt Col Rob Kaufman
  • C2 FCB
  • 9 January 2007

UNCLASSIFIED
2
Overview of Concept
  • Military Problem
  • Provide the Joint Force Commander with a
    seamless, deployable command and control
    capability that will enable the creation of
    desired effects at the right time and place to
    accomplish the mission. This C2 capability should
    enable Joint Forces to rapidly respond and
    decisively execute the commanders intent in a
    complex, uncertain dynamic operating environment
    while fully leveraging interagency support,
    multinational partners, and non-government
    organizations.
  • Scope
  • This functional concept envisions joint C2 in the
    net-centric environment of 2015 and summarizes
    how future Joint C2 capabilities will support the
    Joint Force throughout the full range of military
    operations (ROMO). The Joint C2 Functional
    Concept describes how command and control will be
    performed to achieve success when executing
    missions and operations described in the Joint
    Operating Concepts. Though this document focuses
    on the operational level, the concept applies to
    C2 across all echelons.

3
Overview of Concept
  • Proposed Solution
  • JC2 JFC update largely a rewrite
  • Last JFC written from a combined C2/NC
    perspective
  • Must incorporate new concepts from C2 CBA C2
    JIC.
  • CJCSJ 3010.02B-required DOTMLPF implications.
  • CCJO and JOC updates less significant
  • C2 FCB out-of-hide effort
  • Leverage in-house and C/S/A expertise
  • Balance workload with competing requirements

4
Way Ahead
  • JC2 JFC rewrite underway First IPT
    tentatively scheduled for mid-February
  • Schedule is tight, but Summer 07 completion
    still feasible
  • Timeline below lists schedule of events

The below timeline lists the events to occur to
rewrite the JC2 JFC
Commence review, validation, and approval process
(FCB, JCB, JROC, Tank)
1st IPT with C/S/A (mid-February)
2nd IPT with C/S/A
Red Team review
Develop straw man for 1st IPT (9-11 Jan 07)
Staff document in KM/DS