Leader Local Development Plan - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Leader Local Development Plan

Description:

Difficulty of connection between place where one lives and ... Varzi, Brallo di Pregola, Menconico e Santa Margherita Staffora. Brussels 25th October 2004 ... – PowerPoint PPT presentation

Number of Views:64
Avg rating:3.0/5.0
Slides: 26
Provided by: eceu
Category:

less

Transcript and Presenter's Notes

Title: Leader Local Development Plan


1
LeaderLocal Development Plan
  • Improving the quality of life a social and
    economic development strategy for the Mountain
    Alto Oltrepo Pavese

2
The LDP strategy
  • Local Animation
  • Done in cooperation (concerted)
  • Social and economic analysis

3
The areas weaknesses
  • Lack of logistic facilities
  • Loss of primary services
  • Difficulty of connection between place where one
    lives and social centres
  • Lack of connection to the relevant centres
    situated out of Leader area

4
The LDP answer
  • Creation of a rural integrated transport network

5
Services features
  • Innovative Organisation Model
  • Efficiency of the service
  • Integration with the public transport service
  • Flexibility

6
Strengths
  • Integrating and enhancing the local transport
    system
  • Establishing an efficient and innovative model
    that can be used also for other sectors
  • Connecting the most isolated and remote areas
  • Creating new links with the main centres

7
Targets
  • Reducing logistical and social difficulties
  • Reducing and changing the trend of the migrant
    flow

8
The services priorities
  • Social needs (markets, banks, post office, holy
    cultural and amusing events)
  • Welfare needs (hospitals, medical aid)
  • Sport activities

9
The territorys features
  • Number of inhabitants 18628
  • Surface 487,32 Kmq
  • Density 28,2 in/Kmq
  • Population over 65
  • 6211 in. (34)
  • Population under 24
  • 2591 in. (14 )
  • Spread Index 48,5 (nr. Of inhabitants living in
    isolated place)

10
Actors
  • LAG Alto Oltrepo
  • Fondazione Banca del Monte di Lombardia
    (financial partner)
  • Pavia Province
  • Mountain Community Oltrepo Pavese
  • Municipalities
  • People

11
The steps of the project
  • Constitution of a Technical Committee (LAG,
    Province, Mountain Community) in charge of
    addressing, monitoring and auditing
  • Projecting the service
  • Supplying the service

12
The preliminary statements
  • Marginal territory
  • Area where the demand is weak
  • Possibility to put into effect a system of
    flexible mobility

13
TAXIBUSHow it works
  • The users calls the coordination unit
  • The coordination unit estimates the needs
  • The coordination unit organizes the service
  • The coordination unit confirms the service to the
    users
  • The manager distributes the service

14
TAXIBUSWeakness
  • Necessity to promote and to diffuse the service
  • Communication users management
  • Flexibility and dynamism of the service
  • Difference between foreseen time and real time

15
TAXIBUSThe implementation modalities
  • Absolutely innovative service for the area
    necessary to test the service on a small part of
    the area before extending it all over the Leader
    Area
  • Four municipalities are selected for the testing
    phase
  • Varzi, Brallo di Pregola, Menconico e Santa
    Margherita Staffora

16
TAXIBUSTesting area
  • inhabitants 5500
  • surface 170 Km²
  • population over 65 37
  • density 29 in./Km²
  • Spread Index 58

17
TAXIBUS The implementation modalities
  • Service assigned by call for proposal
  • Coordination of activities
  • Communication plan
  • Service supply
  • Project review during supplying

18
TAXIBUS The implementation modalities
  • Municipalities involved in decisional processes
    of booking
  • Service brings to institutional level
  • Confidence of the users in the service
  • To check the real transportation needs

19
TAXIBUSServices features
  • Territory served 4 municipalities out of 22
  • Booking system on request - telephone
  • Checking the needs local authorities and social
    services
  • Co-ordination Comunità Montana
  • Transport by minibus and cabs

20
TAXIBUS Services features
  • Nr. of renter 3
  • Minimum booking time 72 hours
  • Target of users everybody
  • Minimum nr. of persons per travel 1 person
  • Cost free
  • Priority healthy needs

21
TAXIBUS
  • Taxibus launched at the beginning of August 2004,
    the first results are
  • o Total users 294
  • of which
  • o Young people 9
  • o Old people 273
  • o Other 12

22
TAXIBUS
  • o Nr. of travel 99
  • o Total Km 1,911
  • o Average booking time 2,2 days
  • o Total travel time 67h e 20
  • o Average travel time 35

23
TAXIBUSFuture developments planned for the
project
  • Extend the service to the whole Leader area.
  • Implement thematic services in the whole
    Leader area.
  • Implement on request service in the whole
    Leader area.
  • Increase the possible bookingmeans fax, e-mail
    and a free telephone number.

24
TAXIBUS Future developments planned for the
project
  • Manage on request transport and thematic
    transport together.
  • Make the services cheaper.
  • Set up institutional working group to show the
    results of the project to the public transport
    companies

25
TAXIBUSFurther ideas
  • Local development policies supported by public
    and private cooperation
  • Mobility as an instrument to live our lands
  • Marginal territory but not isolated
  • Environmental policies integrated in the local
    development plan
Write a Comment
User Comments (0)
About PowerShow.com