Title: EVLA Advisory Committee Meeting


1
Project Overview
  • Mark McKinnon
  • EVLA Project Manager

2
Outline
  • Project Definition/Objectives
  • Status Highlights
  • Management
  • Budget
  • Schedule
  • Project Goals in FY06 and FY07
  • Action on 2004 EAC Recommendations

3
Project Objectives
  • Design, prototype, and install on 2 antennas new
    feeds, receivers, and structural modifications.
  • Design, prototype, and test on 2 antennas new LO,
    IF, and fiber optic systems.
  • After testing, install all of the above on all
    antennas.
  • Design, build, and test a new MC system. Must
    allow operation of new and old antennas in
    transition.
  • Design, prototype, test, and produce a new
    correlator.
  • Design and implement new data management
    software.
  • Perform careful astronomical observations to
    verify EVLA hardware and software function
    properly.
  • Contribute to EPO to advance public science
    education.

4
Summary Status of EVLA Antennas
5
Highlights
  • Successful redesign of digitizer in DTS module
    allowed antenna retrofitting to proceed.
  • Developed monitor and control (MC) software for
    EVLA/VLA transition mode observing
  • Developed MC software for reference pointing of
    EVLA antennas
  • 1.75M received from Mexican partner
  • NRAO notified in December 2005 that NSF was
    unable to support request for EVLA Phase 2

6
Management Project Organization
7
ManagementWork Breakdown Structure
8
Management Cost Scope Control
  • Project book defines project scope
  • Semiannual updates of work breakdown structure
  • Change control board approval required on WBS
    updates and changes to project book (gt50K)
  • Budget status summarized monthly
  • High level decisions act on advice of NRAO upper
    management and advisory committees.

9
Management Track Progress
  • Weekly milestone update
  • Reporting
  • Quarterly reports to AUI/NSF
  • Semiannual progress reports to NSF
  • Annual GPRA report to NSF
  • Annual reports to AUI Visiting Committee and NRAO
    Users Committee

10
Budget
  • Funding 85.07M (FY06)
  • NSF project funds 56.34M
  • NRAO contributed effort 15.85M
  • Canadian partner 11.13M
  • Mexican partner 1.75M
  • Estimated cost 82.24M
  • Contingency 2.83M

11
Schedule Key Milestones Completed
  • Start installation of fiber optics on
    wye 11-04-02
  • Start prototype system lab integration
    test 01-15-03
  • Install prototype system on antenna 04-14-03
  • Start electronics production 04-05-04
  • Complete electronics CDRs 05-21-04
  • Start retrofitting antennas with new
    system 10-05-04

12
Schedule Key Milestones Remaining
  • Start observing in transition mode 06-01-06
  • Test prototype correlator on 3-4
    antennas 03-30-07
  • Start installing parts of final
    correlator 10-31-07
  • Start tests of correlator subset at VLA 05-15-08
  • Shared risk science with new correlator
    subset 10-01-08
  • New correlator operational 11-13-09
  • Last antenna retrofitted to EVLA design 07-29-10
  • Last receiver installed 06-01-12

13
Project Goals FY06
  • Retrofit 6 antennas to EVLA design and return to
    array for transition observations
  • Complete identification of first science
    observing modes and prioritize project tasks to
    complete them
  • Refine project schedule to insure close coupling
    between hardware and software deliverables where
    appropriate
  • Help clarify/define the final structure of the
    new e2e Division and its interaction with NRAO
    operations and projects
  • Repeat contingency and risk analyses with finer
    level of detail

14
Project Goals FY07
  • Retrofit 6 antennas to EVLA design and return to
    array for transition observations (for a total of
    12 EVLA antennas)
  • Install prototype WIDAR correlator and begin test
    observations
  • Commission a science advisory committee to
    evaluate/prioritize potential descope options
  • Select final design of 3-bit, 4Gsps sampler and
    initiate its production

15
Actions on 2004 EAC Recommendations - 1
  • Overrun in contributed effort from the operations
    budget to the EVLA project
  • 2.1M charged to the project
  • Inadequate resources for EVLA e2e effort
  • 10 FTE years (1M ) provided by the project.
  • e2e Division created for entire Observatory
  • Additional effort devoted from operations budget.
  • Complete refinement of L-band OMT design
  • Done. Test results presented at recent FE CDR

16
Actions on 2004 EAC Recommendations - 2
  • Conduct a careful scientific trade-off study of
    descope options
  • Contingency comparable to last year, but low.
  • Detailed contingency analysis and scientific
    study of descope options will be undertaken in
    FY07.
  • Bring younger NRAO staff into debugging and
    commissioning activities.
  • Additional, younger staff actively engaged.
  • Additional staff to be hired in FY06-07.

17
Actions on 2004 EAC Recommendations - 3
  • For system tests, two sets of antenna electronics
    need to operate simultaneously in the electronics
    lab
  • Can currently simulate 2 central reference
    sources and 2 LO fiber links in the lab.
  • Opted to install modules in antennas for testing
    and observations.
  • Many problems are VLA-EVLA transition issues.
  • Scope of the MC system, its science
    requirements, interfaces are not clearly
    defined
  • MC design document is nearing completion.
    Includes internal interface definition.
  • Software development plan completed (identifies
    code description, developer, and timeline).
  • Completed report characterizing information
    distributed in MC system.

18
Actions on 2004 EAC Recommendations - 4
  • No standards for MC design and coding.
  • Biweekly code reviews.
  • CVS used for source and version control.
  • Maven for build environment. Standard nightly
    code builds.
  • No MC test and integration (TI) plan
  • In transition from VLA to EVLA, EVLA antennas
    work must work with existing MC system
  • Longstanding TI procedure in place and being
    used
  • Will develop formal TI plan for correlator in
    the final MC system.

19
Actions on 2004 EAC Recommendations - 5
  • Adequate design of the e2e system is lacking.
  • More resources assigned to e2e, and High Level
    Architecture (HLA) team has started the e2e
    design.
  • Identify and prioritize EVLA-specific
    requirements for CASA so that required resources
    can be identified
  • Post-processing requirements common and unique to
    ALMA and EVLA have been identified (e.g.
    wide-field imaging and calibration).