Technical Team Meetings - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Technical Team Meetings

Description:

Maintain WITSML servers for interoperability testing ... Use a change log that can be queried for latest changes and historical changes ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 8
Provided by: andyse9
Category:

less

Transcript and Presenter's Notes

Title: Technical Team Meetings


1
Technical Team Meetings
  • November 2/3 2004

2
Technical Team Process
  • Representatives from SIG members
  • Collect feedback on Yahoo Group web site
  • Private area on WITSML.org site
  • Maintain WITSML servers for interoperability
    testing
  • Telephone conference monthly or more often if
    required
  • Face to face meetings at WITSML seminars
  • POSC maintains the latest issue list
  • 121 discussion items

3
Technical Team Summary
  • Empty elements in objects
  • Dont return if not mandatory
  • Use defined null values if mandatory
  • Custom data for sub-objects
  • Just add to BHA for now
  • Server API Versioning
  • Remove from individual functions

4
Technical Team Summary
  • Embedded Binary Objects
  • Enables inclusion of pictures or other binary
    data in WITSML objects
  • Industry standards SOAP with Attachments
  • Other options to embed (MIME/Base64 encoding) can
    increase object size
  • Mudlog
  • Adopt new mudlog schemas from use case group
  • Event notification
  • Use a change log that can be queried for latest
    changes and historical changes

5
Technical Team Summary
  • Wellbore Discussions
  • Define wellbore as a path from a unique bottom
    hole location back to surface
  • Wellbore may have data associated with it back to
    surface e.g. trip, wireline or mud circulation
    data
  • Define definitive survey from current wellbore
    position back to surface compatible with UKOOA P7
    or equivalent
  • Operators require a simple query to retrieve
    trajectory from bottom to surface. (Use the
    options in parameter in the SOAP query)
  • Requires further discussion with other use case
    groups to align with WellPathML and other
    initiatives

6
Technical Team Summary
  • Risk Object
  • Proposed by Schlumberger
  • Can be used for risk, event, best practices
  • Used for planning and reporting actual events
  • Can attach to any WITSML object using mechanism
    defined for message object
  • Risk/Event may be associated with depths and/or
    times

7
Technical Team Plans
  • Agree on content of 1.3 Schema by end 2004
  • Update test servers with 1.3 schema data sets
  • Continue work on well path/well header
  • Implement new schemas as identified by use case
    team
  • If you want to influence the WITSML standard,
    join the SIG
Write a Comment
User Comments (0)
About PowerShow.com