Description:

CM 0204(4) 4th-Hickory to R/R Xing- Anaconda. Cold Milling, PMS Overlay, Seal & Cover, Sidewalk, and Curb & Gutter. ADA Ramp Detail ... – PowerPoint PPT presentation

Number of Views:398
Avg rating:3.0/5.0
Slides: 23
Provided by: william78
Learn more at: http://www.mdt.mt.gov
Category:
Tags: ada | design | gutter | ramp

less

Transcript and Presenter's Notes

Title: ADA Ramp Design


1
ADA Ramp Design Construction Issues
  • 2006
  • Highways and Engineering Conference

2
Objectives
  • Share Recent Experiences In
  • Contract Administration
  • Design Changes After Award
  • Contractor Concerns Claims
  • Ramp Designs
  • Retro-Fit Challenges
  • Topography Surveys

3
Project
  • CM 0204(4) 4th-Hickory to R/R Xing- Anaconda
  • Cold Milling, PMS Overlay, Seal Cover,
    Sidewalk, and Curb Gutter

4
ADA Ramp Detail4th- Hickory- Anaconda
5
ADA Ramp Detail4th- Hickory- Anaconda
6
(No Transcript)
7
(No Transcript)
8
Contractor Claim
  • Contractor Submits Claim Resulting From MDT
    Design Changes
  • Claims MDT Changed Sequence of Operations
    Requiring Extra Work
  • One Size Fits All Mentality
  • Outcome-
  • MDT Settled The Claim at The District Level
  • Agreed to Additional Costs Per Radius
  • Additional Contract Time

9
Contractor Claim
  • Contributing Factors-
  • Subcontractor New to Business
  • Unfamiliar With ADA Retro-Fit Type Work
  • Ramp Design Changes
  • Post Award
  • Scenario Could Effect Apparent Low Bid
  • Topography Survey Plan Details

10

11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
Recommendations
  • Carefully Consider Design Changes After Award
  • Negotiating Terms, Lack of Competition
  • Claims
  • Preliminary Survey Considerations
  • Topography
  • Drainage, Curb Configuration
  • Whenever Practical Designer Visits Project

18
Recommendations
  • Design Details
  • All or None
  • Develop Design Specialists (e.g. Geometrics)
  • Communication
  • Prelim. Survey Request Requires Photo Log
  • Coordination
  • Increase Plan Checkers Awareness to Help Identify
    Potential Concerns

19
Example Detail-Geyser to Park-Livingston
20
Example Detail-Geyser to Park-Livingston
21
Geyser to Park-Livingston
22
Thats It!