Title: Demand Response in New York State


1
Demand Response in New York State
  • Northwest Power and Conservation Council DR
    workshop
  • February 24, 2006

2
New York and Neighbors
Hydro Quebec 35,137 MW
ISO - New England 25,348 MW
IMO 25,414 MW
New York ISO 30,983 MW
PJM / PJM West 63,762 MW
Peak Load in Megawatts
3
The NY Marketplace
  • Deregulated since late 90s
  • Nearly all generators are owned by IPPs
  • NYISO administers capacity and energy markets
  • Energy is bought and sold on a day ahead basis at
    zonal hourly prices (LMP)
  • The highest priced bids accepted in a zone for
    each hour set the price

4
New Yorks Energy Market
Bilaterals 50
NYISO Day-Ahead Market 45 50
Real Time lt5
Bilateral Contracts 50 Day-Ahead Market 45 -
50 Real-Time Market lt5 100
5
New Yorks Capacity Market
  • Load Serving Entities must procure 118 of the
    load they serve This covers the reserve margin
    of 18
  • Capacity beyond that is assigned a decreasing
    value as supply becomes more abundant
  • This value is set by a demand curve and funded
    through uplift (socialized)

6
(No Transcript)
7
The value of DR
  • DR provides the same benefit to the system as
    generators, so should be given the same value
  • This holds true for both capacity and energy
  • DR acts like a peaking plant, and should be
    valued as such for both capacity and energy
    (peaking plants typically only run when energy is
    expensive)

8
DR Program Options
  • Capacity Based
  • Could be combined with energy based program
  • Could be called either for reliability or when DR
    is more economic than generated electricity
  • Performance should be mandatory to justify
    capacity payments
  • Energy Based
  • Can be voluntary if capacity is not valued
  • Could be called either for reliability or when DR
    is more economic than generated electricity
  • If scheduled economically, performance should be
    mandatory

9
New Yorks Capacity Program
  • NY has a capacity based program where DR is bid
    into the same capacity market as generators
  • Resources are paid LMP for energy (not less than
    500/MWh)
  • DR is penalized for underperformance as a
    generator would be
  • Resources are called for grid reliability, not
    price mitigation

10
New Yorks Emergency DR Program (Energy Based)
  • Resources are paid LMP for energy (not less than
    500/MWh)
  • Resources are called for grid reliability, not
    price mitigation
  • Response is voluntary
  • Participants are often in this program to be good
    citizens rather than for the money

11
New Yorks Day Ahead DR Bidding Program
  • DR bids an energy price at which they are willing
    to load-shed
  • Bids are entered in competition with generators
  • If DR bids are less than the market clearing
    price, they are selected to run and receive the
    clearing price, just as a generator would
  • This provides the market with the option of
    choosing DR instead of generators when DR is more
    cost effective

12
DR Safety Net or Market Efficiency?
  • Both DR can serve as a safety net to avoid
    brownouts or blackouts, but
  • Why schedule a generator at 300/MWh if DR will
    provide a like resource for 200/MWh?
  • DR could be integrated into the market to compete
    with generators on both a capacity and energy
    basis for either emergency or economic dispatch

13
The System Benefit
  • In addition to the reliability benefit, DR can
    result in ratepayer savings
  • If DR is more cost effective than the more
    expensive generators, rate payers pay less
  • DR empowers end users to act like a resource,
    giving them market power
  • DR is more than just an insurance policy, its
    an alternative to generation and can delay TD
    upgrades

14
Questions/Comments?Chris SmithNYSERDA518-862-1