Title: Major Hazard Facilities
1Major Hazard Facilities
- Preparing and Managing a Safety Report
2Overview
- The seminar has been developed to provide
- Context with the MHF Regulations
- An overview of what is required by an employer
who needs to prepare and maintain a safety report.
3Some Abbreviations and Terms
- AFAP - So far as practicable
- ER or ERP - Emergency response or Emergency
response plan - HAZID Hazard Identification
- HSR - Health and safety representative
- MHF - Major hazard facility as defined in the
Regulations - MA - Major accident
- OHS -Occupational health safety
- Employer - Employer who has management control of
the facility - SMS - Safety management system
- SRO Safety report outline
4Topics Covered In This Presentation
- Introduction
- Preparing a safety report
- What makes a good safety report
- Safety report outline - Core components
- Potential pitfalls
- Key success factors
- Managing and maintaining a safety report
- Review and revision
- Safety report for a new project
5Preparing a Safety Report
Management Commitment and Support
So this is whats required
Project Management
Consultation Communication
Understand Requirements
6Management Commitment and Support
- The safety report should feature in, and be
consistent with, business goals and objectives - The process is resource and time intensive so
commitment for significant funding and employee
time is required - Consistency with company policy, philosophy and
objectives is necessary to maintain and sustain a
compliant safety report - Essential that upper management show strong
commitment, drive the process and provide the
environment for the facility to develop,
implement and maintain the safety report
7Know The Regulatory Requirements
- Read the Regulations !!!
- Be sure to interpret the Regulations in the
context of your facility - Define the relationships between the safety
report / MHF requirements and other OHS
management activities - Clarify any points of the Regulations that are
not understood. Do this early as several matters
require compliant practice from the very
beginning of the activity (eg consultation) - The MHF Regulations are relatively simple to
grasp albeit difficult to comply with
8Safety Report Planning
- Proper planning is an essential element in
preparing a safety report - An effective plan will cover all aspects of
safety report development (or review and
revision) including important aspects such as
consultation
9Safety Report Planning
- Definition of tasks to be completed
- What do you need to do ?
- Definition of constraints in place
- What resources do you have access to, funding
available, regulatory timeframes etc - Definition of task inter-relationships
- What has to come first, which tasks rely on
information from another task, what are the
constraints on availability of resources? etc - Identification and allocation of resources to
each task - Who is needed to complete each task?
- What other projects/tasks are competing for the
same resource? - What tools, equipment or systems will you
require? - What data will you generate and how will you
store, use and manipulate this data? - What resources will you use to monitor progress?
10Safety Report Planning
- Other elements in the safety report plan
- Estimation of task completion times and
definition of task milestones in overall project
schedule - Consultation and reporting plan for the project
who needs to be involved, who needs to be
informed? - A clear project organisation structure detailing
roles, responsibilities reporting lines for
project activities
11Safety Report Planning
- Safety report outline for new safety reports
- Review/revision plan for update of an existing
safety report - Employees and HSRs should be briefed on the
proposed plan to achieve a common understanding
and agreement of what is required - Acceptance by upper management of the resource
requirements, process, and commitment is
essential
12Resources, Tools and Systems
- Safety report development is a resource intensive
process - Expect that high levels of employee participation
are needed - Plant operators, maintenance personnel, plant
managers, engineers, OHS personnel, consultants,
support personnel, administrative personnel,
HSRs, contractors and corporate managers are all
likely to be involved to a significant extent - Often spin-off projects are identified to address
deficiencies in related support systems (e.g.
training systems, document management systems, IT
systems) - Core safety report development roles are not
always best served by part time roles
13Resources, Tools and Systems
- Attempt to identify early any important tools
which may be required. For example, are CAD
drafting facilities required to update drawings?
Will access to certain database information be
required? What reference materials must be
sourced? - Early consideration on how to record, store,
manipulate and use the vast quantity of data
generated from the safety report development
process is recommended - Where existing systems, tools etc are to be used
for the safety report tasks, it is prudent to
verify early that those systems and tools will
provide compliant outcomes - If the systems and tools of third parties (e.g.
consultants) are to be utilised, the employer
should include tasks to test and verify the
adequacy of these for achieving a compliant
safety report
14Availability of Resources
- The significant effort and time commitment
required to complete activities such as hazard
identification and risk assessment can be wasted
if all relevant facts and knowledge are not
available - Early consideration and coordination with many
people is generally required - An objective evaluation of available skills is
necessary to ensure additional expertise can be
sourced where necessary - A low tolerance approach to workshop
non-attendance is often required from senior
management level. Workshops may be arduous, time
consuming and often repetitive. Management and
HSR support is required to overcome this - Plant and corporate managers need to agree and
commit to the safety report program, and manage
conflicting demands on resources accordingly
15Project Management
- The safety report plan needs to not only be
defined, but also tracked and monitored to ensure
successful completion by the due date and within
all constraints - Good project management is required to ensure
tasks are completed on schedule, over-runs are
identified early and rectified, barriers to
achieving compliance are identified and overcome - Consider the need for dedicated project resources
(e.g. Safety Report Manager) to ensure process is
not derailed by conflicting responsibilities
16Quality Assurance
- A great deal of effort and resource is expended
by facilities in developing and documenting
safety report components. It is important that
this effort is accurately reflected in the final
documentation - Facilities should be careful to ensure data
presented in their submitted safety report is - Accurate
- Consistent
- Unambiguous
- Complete
17Safety Report Outline (SRO) Core Components
- Safety report philosophy
- Scope of work to be undertaken
- Resources, timetable, milestones
- Key definitions and criteria (risk, property
damage) - Methodology statements (HAZID, risk assessment
etc.) - Details of the scope of consultation that will be
undertaken - The emergency plan
18SRO Core Components - Safety Report Philosophy
- Inherent risks within the facility
- Chief methods of ensuring safe operation at the
facility - Description of safety management system
- Safety culture within the organisation
19SRO Core Components Description of Methods
- The methods chosen for hazard identification and
risk assessment are likely to have a major impact
on resource requirements and timeline - Identify these early in the safety report
planning - The methods used should align with the approach
to safety adopted at the facility
20SRO Core Components - Consultation
- The MHF Regulations require you to consult with
employees and external stakeholders during the
development of the safety report - The safety report outline should describe
- Who will be consulted
- How the consultation will occur
- How the information from the consultation will be
included in the safety report
21SRO Core Components - Consultation
- Who do you have to consult?
- 7 main groups of people
- HSRs
- Employees
- Emergency Services
- Municipal Council(s)
- Non-employees who enter the facility (e.g.
contractors) - Local Community
- Other persons who may reasonably suspect risk to
their health and safety
22SRO Core Components - Emergency Plan
- Emergency Plans exist because things can go wrong
and preparation is needed for such an event - Emergency Plans are more than response
procedures they also include the supporting
framework of training, resources, performance
measures and drills etc - Consultation with all emergency services is
necessary (because they have a role to play in
combating incidents and provision of resources) - Emergency Plan must be adopted as a control
measure and as such the development of meaningful
performance measures and indicators is required
23What Makes a Good Safety Report?
- All parts of the Regulations are systematically
addressed - Early momentum is established
- High levels of employee involvement
- Wide and varied expertise has been made available
- Thinking outside the established norms
- Challenging the status quo
- The safety report process is integrated into
facility improvement plans and business processes - Safety report is owned, understood and managed by
the MHF - The safety report process provides clear benefits
to stakeholders
24What Makes a Good Safety Report cont
- Clear and consistent links between MAs, Hazards,
Risk, Controls, Emergency Plan, SMS and
Performance Monitoring Regimes - Implemented control measures, SMS, performance
monitoring regimes etc are sustainable given the
size and complexity of the facility - Documentation captures corporate memory
- The process is logical and simple dont over
complicate
25What Makes a Good Safety Report cont
- The safety report demonstrates that
- The employer fully understands the facilitys
processes/systems - The employer understands the facilitys risks
- Appropriate control measures have been selected
and implemented to reduce risks AFAP at the
facility - Systems are in place to manage each MA to ensure
risks continue to be reduced AFAP - The employer has systems to keep the control
measures working to their stated performance
level - The employer has in place processes for reviewing
and revising, as needed
26Some Potential Pitfalls and Mistakes
- Not taking time to understand the Regulations
properly - Inadequate planning
- Wasting time and resources redoing work
unnecessarily - Over committing to controls and systems which
cannot be reasonably sustained - Do things to look impressive but which dont
add real value to the business - Not using valuable information already available
(e.g. independent audits etc) - Overlooking mitigative controls and the need to
maintain them
27Some Potential Pitfalls and Mistakes
- Failing to carry forward changes into all
relevant parts of the safety report (e.g.
Emergency Plan) - Inconsistencies between different parts of safety
report or between different sources of
information - Losing sight of the big picture unbalanced
focus on certain aspects - Losing sight of the overall objective of the
regime - Failing to make safety report compliment overall
business objectives
28In Conclusion - Keys to a Successful Outcome
- Adequate Planning and Education
- Understand the requirements in the Regulations
and know what compliance looks like - Dont over complicate at the start
- Test processes and methods of documentation
before starting - Identify resource needs early and consider how
on-going maintenance of the safety report will be
managed
29In Conclusion - Keys to a Successful Outcome
- Commitment from senior management
- Appropriate depth range of experience
- Suitably qualified people
- Operations staff, those who
- are exposed to the hazard
- are the ones most likely to be impacted by, or
contribute to an incident - understand the true variance in operating
conditions and environments
30In Conclusion - Keys to a Successful Outcome
- People understand what they are doing and why.
- It is essential to included ongoing consultation
with employees - Everyone exposed to hazards or involved in
management of the risk needs to understand - The hazards
- The risk
- The controls
- The relationship between them
- The safety report should form the basis of
training and operating procedures - Key documents are updated and available
31In Conclusion - Keys to a Successful Outcome
- It is important that the process and methods used
will work successfully within the organisation
and the way it functions - E.g.
- Dont use highly technical approaches if that is
not what you usually do - Ensure that controls are appropriate to the
capability of the facility to manage them
32In Conclusion - Keys to a Successful Outcome
- Need to remain focused on the facilities ability
to sustain both - The processes introduced
- The outcomes from the process (new controls)
- Ongoing resource requirements need to be
considered before starting
33In Conclusion - Keys to a Successful Outcome
- Focus on improving safety, not simply compliance
(regulatory or internal) - Effective real consultation stakeholder
ownership - Preparedness to challenge established norms
- Process and procedure for resolving issues and
agreeing assumptions - Transparency of the process
34In Conclusion - Keys to a Successful Outcome
- Focussed effort for continuous improvement in all
aspects of the safety report and its supporting
systems
35Managing A Safety Report
36Managing a Safety Report
- The facility has been given a licence for 5 years
- Management congratulates all
- Everyone breathes a sigh of relief
- Onto the next project
- Let the safety report sit in the draw until the
next investigators visit or licence renewal
period
37Managing a Safety Report
- After all, the licence confirms
- Risks are in control
- and
- There are management systems in place to deal
with all of the required issues covered by the
Regulations - Tempting yes
- But WRONG!
38Managing a Safety Report
39Managing a Safety Report
- The safety report should become integrated into
the daily management activities of an MHF - The safety report process will have identified
all of the performance parameters required for
managing the risk from each MA
How to use the information to keep the risk from
each MA as low as practicable?
40Managing a Safety Report
- How to validate that controls identified in the
safety report are - Implemented?
- Functional?
- Meeting the performance standards nominated
- Changes to circumstances are handled in
accordance with the safety report process
requirements - A system must be in place to verify all of these
issues in an explicit and transparent manner
41Managing a Safety Report
- The control measures need to be managed through
an audit system by the employer and documented in
such a manner that allows the performance of
every control to be verified - The overall performance of every control managing
an MA should therefore be audited
42Managing a Safety Report
43Managing a Safety Report
- The SMS becomes the primary means of managing
safety - As with the concept of management systems, if it
is stated to do something, then it should be
verified - Performance indicators should be developed to
measure the success or otherwise
44Reviewing and Revising
- The effectiveness of the SMS can be measured
through a specifically developed auditing process
45Reviewing and Revising
- The auditing process is considered essential to
demonstrate - Continuing compliance with the safety report
- Effectiveness of all the processes and systems
- For the facility
- The employer can develop a schedule for auditing
the SMS elements and each of the MA controls
identified in the safety report throughout the
year - Undertake the audit and report on outcomes
46Reviewing and Revising
47Reviewing and Revising
- It is natural that with any system there will be
opportunities for improvements to be made to the
safety report process - Such improvements could relate to
- Feedback from employees regarding training
- Performance of controls (positive or negative)
- Management of change
- Emergency response exercises
- Training
- Incidents that occur
- Communications with Regulator
48Reviewing and Revising
- Feedback from various sources will enable the
safety report to be continually used as a key
management business platform for the MHF - It will provide demonstration to all stakeholders
of how the process is working - It will aid transparency and continued
demonstration of adequacy that the safety report
is fit for purpose
49New Projects
50New Project
- How do we achieve the right outcome?
Project Lifecycle
New Project!
51New Project
- MHF issues need to be considered as early as
possible during a project lifecycle - Decisions taken at early stages of a project will
have an impact on the MA profile of the facility
good and bad - The employer needs to focus on short, medium and
long term issues required for the safety report
during project development
52New Project
Concept
- Major hazard issues should be considered during
each step in the project life cycle - Important decisions at the concept phase can
impact upon the overall risk profile of the
facility throughout its life
Design
Construction
Commission
Production
Decommission
Disposal
53New Project
- It is cheaper to fix an issue at the design phase
than the operational phase - Retrofitting control measures or fundamental
design changes during the operational phase - Is always more expensive
- Places a very large burden financially on
operational budgets - Delays the facility from reaching the designed
throughput targets - If the process is well structured, the reasons
for specific controls adopted and rejected can be
documented corporate memory - The corporate memory approach is extremely
valuable
54New Project Potential Issues
- For example, XYZ company engages a contractor for
developing a project on a lump sum basis and the
project requires MHF licensing - In many cases the contractor will engage a
resource to deal with MHF requirements
55New Project Potential Issues
Possible Project Organisation
56New Project Potential Issues
- The question for all concerned is how can the
objectivity of a safety report development be
achieved without competing elements of the
project being compromised? - The key to a successful outcome is how the
contract is set up between XYZ company and the
contractor
57New Project Potential Issues
- Conflicts of interest can easily occur there
are many examples of this and the end result
would be costly for both XYZ company and the
contractor - MHF issues that arise which are outside the basis
on which the contractors lump sum price was
developed will need to be addressed as opposed
to being ignored - This may lead to protracted delays between
employer (XYZ company), contractor and regulator
58New Project Potential Issues
Start the safety report early -at the concept
phase
Clearly defined responsibilities,
accountabilities and authorities
Resources (internal versus external)
Clearly defined deliverables
Contractual arrangements
59New Project Potential Issues
- The contractual arrangement should address
- Commitment of client
- Contractual and planning arrangements
- Resources (internal versus external)
- Clearly defined deliverables
- Establishment of milestones
- Establishment of key criteria and methods
- Clearly defined responsibilities,
accountabilities and authorities - Start the safety report early (at the concept
phase)
60Questions?
61Supporting SlidesEmergency Plan
62SRO Core Components - Emergency Plan
- An emergency response plan is a mitigative
control that may prevent an incident from
escalating to a more severe outcome
63SRO Core Components - Emergency Plan
- Develop your EP/ERP based on your credible Major
Accident Scenarios - Involve all emergency services in the
consultative process - Ensure involvement of council and community
- Simplify procedures
- Develop and implement performance standards that
will value-add to the emergency plan - Conduct exercises based on the plan
64SRO Core Components - Emergency Plan
- When an emergency occurs, the first steps taken
will have an impact on the outcome (consequences) - The outcome can be minimised by having control
measures and systems in place to mitigate the
consequences of an emergency situation - This takes
- Planning
- Evaluation
- Adequacy of systems in place
- Training
- It is an ongoing process over the lifetime of the
MHF
65SRO Core Components - Emergency Plan
- Emergency planning is a cyclical process
- The plan should be
- Dynamic and interactive
- Ensuring ongoing relevance to the needs of the
facility and all stakeholders by continual - Monitoring
- Review
- Consultation
66SRO Core Components - Emergency Plan
67SRO Core Components - Emergency Plan
- Aim of the Plan
- Provide a system and resources to protect people,
property and the environment - To minimise adverse impact on people, property
and the environment - Objectives of the Plan
- Comprehensive, yet concise, simple and flexible
68Emergency Plan Contents - Example
69Emergency Plan Site and Hazard Detail
- Links the risk assessment outcomes to the
emergency plan - Identifies personnel resourcing issues
- Details assumptions
- Details the combating resources available on site
- Details Emergency Response Plans
70Emergency Plan Site and Hazard Detail
- Assumptions affecting the emergency plan
- Assumptions on the availability of resources and
services and the execution of responses within an
estimated time frame - Assumptions should be evaluated and contingency
plans developed when assumptions fail or cannot
be justified - Typical assumptions include
- Availability of external resources
- Response time of emergency services
- Correct operability of equipment
- Key personnel will be available on site at time
of incident - Personnel will be competent to undertake duties
as detailed in the plan - Fire water containment capability
71Emergency Plan Site and Hazard Detail
- Estimation of Consequences
- The effects/impacts can be estimated from
information available on material released,
operating conditions, facility layout, nature of
the surroundings and environmental conditions - Nature and rate of material released
- Radiated heat generated by a fire
- Blast generated by an explosion
- Toxic concentration in the atmosphere
- Escalation potential
72Emergency Plan Site and Hazard Detail
- Estimation of Consequences
- Once the analysis of the scenario has occurred,
the emergency response scenario information can
be presented in a consistent format - Format is site specific but must meet the needs
of those expected to use the information
including site and emergency services personnel.
73Example Emergency Response Plan
Product
Fire Consequences
Fire Fighting Equipment
Foam and Water Requirements
74Example Emergency Response Plan
Site Plan
Pool Fire
Heat Flux with Wind (4.7 kW/m2 for personnel
accessibility)
Heat Curve irrespective of wind direction
75Emergency Response Command Structure Personnel
- Identifies roles for individuals within the
emergency plan - Identifies
- Who is in charge
- What personnel should do
- Why they do it
- When they do it
- Who is communicating with whom
- How to contact persons, organisations or
additional resources
76Emergency Response Command Structure Personnel
- Roles and responsibilities needs to clearly
detailed and should to be consistent with the
Command Structure - Role statements need to be available for all
positions and persons need to be familiar with
their role and also their contingency role (if
any)
77Emergency Plan Notifications
- On site personnel
- Off site facilities
- Emergency services
- Applicable authorities
78Emergency Plan Notifications
- Information required by fire services when
responding to a notification should be fit for
purpose - i.e. for Chemical Spill
- Type and scale of the spill (eg within bund or
uncontained) - Name of the substance involved
- UN Number
- Estimated quantity
79Emergency Plan Resources
- The plan must identify all resources available on
site that are available for use during an
emergency - Where the equipment/material (foams,
neutralisers, etc) are located or how they are to
be obtained - Fixed fire fighting systems should be explained,
in particular their design intent (eg. Deluge
systems -cooling or mitigation) method of
activation - Flow rates and water supply duration should also
be detailed
80Emergency Plan Evacuation Procedures
- These procedures must enable any person on site
to understand what is expected of them and what
actions they are required to undertake - The procedures must explain who is responsible
for accounting for personnel and how it is to be
achieved (links to Command Structure)
81Emergency Plan Isolation Procedures
- Control Isolation Points
- Provides details for the isolation of
- Utilities (gas, water and electricity)
- Road Traffic
- Isolation points need to be identifiable,
accessable and maintained
82The Emergency Plan as a Control Measure
- The emergency plan must be included among the
control measures adopted under Regulation 9.45. - Need to identify appropriate Performance
Indicators and Standards that will ensure the
on-going effectiveness for each individual
control, to enable ongoing assurance. - Indicators of failure need to be identified
- Actions to be taken in reporting any such failure
- Other corrective actions to be taken in the event
of any such failure.
83Emergency Plan Example Performance Standards
- Emergency response personnel are nominated and
manned on all shifts - Response plans are in place for all emergency
scenarios - Emergency response personnel training is current
- Emergency response resources are available,
capable and tested - Drill/exercises are conducted according to the
schedule
84Emergency Plan Example Performance Indicators
- of fire equipment inspected and tested as per
schedule - Evacuation of non essential personnel to assembly
point within 7 minutes - Notification to Emergency Services within 2
minutes of potential major accident being
identified - Emergency Response Team to assemble within 3
minutes of alarm - Emergency response plan exercises are completed
within one month of scheduled date
85Emergency Plan - Testing
- What is the desired outcome of conducting an
emergency exercise? - To be able to demonstrate so far as is reasonably
practicable that in the event of emergency (eg
MA), the mitigation control measures will work as
expected to reduce the likelihood of injury to
all persons and restrict damage to plant,
equipment and local community to a minimum.
86Emergency Plan - Testing
- What else is tested in an emergency exercise?
- Alarm and communications systems
- Call-out of internal/external emergency personnel
- Critical emergency equipment availability
- Evacuation procedures
- Ensure participation of appropriate emergency
services.
87Emergency Plan Testing Desktop Exercise
- Useful training for familiarisation with
procedures and site emergency issues - Can identify resource limitations, issues and
knowledge amongst personnel - May not adequately test communication, site
evacuations processes or equipment accessibility. - Desktop exercise should not be used as the means
of compliance with Regulation 9.53(4)
88Emergency Plan Testing Simulated MA Scenario
- Will test effectiveness of evacuation procedures
- Coordination between onsite procedures and
emergency services - Extended test of onsite/offsite communication
systems - Tests capability of emergency services to
response - Identify limitation/restrictions in equipment
access