Title: Public Private Partnership Conference
1- Public Private Partnership Conference
- Prague, 11-02-2009
- Make PPP possible by taking advantage of the EU
Grants - Christos Gogos
- DG REGIO Deputy Head of Unit for Czech Republic
- E-mail Christos.Gogos_at_ec.europa.eu
2Build a balanced PP Partnership the other way
3THE 20072013 NSRF IN CZECH REPUBLIC
- Total allocation 26,7 bn
- Convergence objective 25,9 bn
- Czech Republics contribution 4.6 bn
- Transports total allocation 7,7 bn
- Environment total allocation 10,0 bn
4Essential PPP contractual elements
- Duration should be an essential criterion for the
award of the PPP contract and should always be
objectively justified and proportionate to the
risks - Tariffs should also be stated as an essential
criterion for the award of the PPP contract and
should promote quality and long-term
sustainability - Performance criteria, monitoring and sanctions
- Necessary to ensure optimal efficiency
5PPP advantages
- Leverage on national and EU Funds and loans
- Reducing costs and construction time-schedule in
comparison to the traditional public works - Design and realize a project of high quality in
order to avoid high maintenance costs - Increase the volume of realized projects in given
frame time, create more jobs and accelerate
economic development
6The must in PPPs
- Balance between public interest vs. risks of the
private partner - Avoid windfall projects
- Consider carefully co-investments
- Carve out the deal with care
- Build the relationship
- Do not harm
- Work together to improve, develop and avoid
prescriptive contracts
7The dont in PPPs
- Create complex consortia
- Develop complex regulatory structures that are
not understood by anyone
8Country characteristics
- High government commitment
- From public service to service to the public
- Adequate legal structure and willingness to adapt
legislation - Transparent tender procedures compatible with
international best practice standards - Dedicated agencies and capacity building
- Qualified staff to negotiate, administer and
monitor complex PPP projects effectively
9Success brings success
- Capitalizing on best practices
- Enhancing public awareness
- Build on successful domestic and abroad examples
- Chose a reliable and experienced contractor
- PPPs need a change in culture and knowledge
- PPP partnership should not be seen as the
solution for financial or managerial problems - In PPPs the public sector is outsourcing tasks
NOT the end responsibility
10Additional success factors
- Starts in the early stages of the project
information, information, information - Creation of a fair environment for all stake
holders - Transparent and fair diversification of risks for
each involved party - Common approach, goals and objectives
- Integrated organization - Specific PPP project
team
11Make PPPs a win-win process
- Cooperation instead of confrontation
- Common problem solving
- Incentive scheme
- Open books
- Continuous improvement
- Permanent feedback
12Time planning is time well spent
- Milestones and deliverables (critical path)
- A valid and realistic time-scale
- Flexible work plans
- Accurate cost estimates, detailed financial
resource requirements - Early warning system, keep team focused and aware
of project progress
13Reporting on performances
- Reporting is a MUST
- Define and make performance measurable
- Respect deadlines in solving problems
- Deal with formal requirements
- Record keeping
- Record monitoring
14- A successful PPP project delivers value for money
and what has been agreed is done on time, on
budget, on scope and on building know-how
15 A successful PPP project connecting
EuropeRio-Antirio, Greece
16(No Transcript)
17Total influence on GR economy - 1.5 billion
18A significant role in the development of the
region
19The Rion - Antirion bridge West Greece
- Built 1999-2004 (five months ahead of schedule)
- Total cost 803.000.000
- EU Grant 256.000.000 (32)
- State budget 108.000.000 (14 )
- Private financing 438.000.000 (54 )
- Duration 35 years
20Composition of the private consortium
- Vinci 53
- JP Hellas 11,2
- TEV 7,74
- Helleniki Techno 7,74
- Athena 7,74
- Proodeftiki 7,74
- Sarandopoulos 7,74
21Comfort and time saving
- reducing crossing time to 5 min (compared to
previous ferry-boats crossing average of 50 min) - improving crossing comfort to high standards
- remaining in operation whatever the weather
conditions
22Traffic and fees
- Carries - 6 lanes (2 lanes each way 2 emergency
lanes 1 pedestrian bicycle lane) - Traffic - 11.000 vehicles/day
- Length 2,880 meters Width 27.2 meters
- SIMPLE CROSSING TOLL RATES FOR 2009
- Cars 11.70
- Mot/cycles 1.80
- Coaches 27.00 - 58.00
- Trucks 18.00 - 39.20
23The longest cable stayed bridge worldwide - 2.880
m
24- An engineering masterpiece
- The 2006 IABSE outstanding structure Award has
been conferred to the Rio-Antirio bridge - The most remarkable, innovative and creative PPP
project completed within the last few years - Outstanding Structure Award for A monumental
bridge executed with strength and grace - An impressive and beautiful sea crossing
25Designed to resist winds of 250 km/hEarthquakes
of Richter magnitude 7
26During an earthquake, the piers should be allowed
to move laterally
27The bridge height allows unobstructed navigation
28Night view
29Night lighting combinations
30Other indicative PPP rail projects
- UK
- Channel Tunnel Rail Link
- Netherlands
- South - cross Amsterdam to belgian border
- Norway
- Sandnes Stavanger link
- Italy
- Brenner Base Tunnel
- Belgium
- Diabolo connection to Brussels Airport
- France
- Nîmes - Montpellier Bypass
- Perpignan - Figueras HST
- Tours Bordeaux HST
- Portugal
- Lisbon Madrid HST
- Lisbon Porto HST
- Spain
- Madrid-Malaga HST
- Madrid-Valladolid HST
- Madrid-Barcelona HST
31PPP needs imaginationJohn Lennon Imagine wall
in Prague
32Thank you for your attention