Regional Community Network
  • Maricopa Association of Governments
  • Telecommunications
  • Advisory Group
  • PROJECT UPDATE
  • November 17, 2005
  • Presented By
  • David S. Haines, P.E.

2
Presentation Overview
  • Overall Project Status
  • Phase 1 Project Funding
  • Future RCN Equipment Configuration
  • JUICE Deployment Efforts
  • Operations Maintenance for AZTech Network
  • Managing RCN Growth with IT Departments
  • Questions / Discussion

3
Overall RCN Network Architecture
Phase 1 (blue) Phase 2 (red) Future (green)
4
Project Status
  • AZTech Integrated Emergency and Transportation
    Communications Network Grant funds
  • Phase 1 Deployment DCR (West Valley and Core)
    Completed Nov. 2004
  • Phase 2 Deployment DCR (East Valley)
    Circulated for comments in June 2005
  • To be finalized within the month
  • Phase 1 Deployment PSE Packages
    In progress, scheduled
    completion in Dec. 2005

5
Project Funding Highlights
  • MAG has 1.6 million reallocated from the
    Regional Video Conferencing System.
  • Funding for Video Conferencing upgrades to
    support IP Ethernet is included in RCN Phase 1.
  • A portion of Phase 1 can be constructed under the
    available 1.6M, and the region will need to
    pursue additional funding for the remaining
    portions.

6
Phase 1A The 1.6M Package
  • Video Conferencing IP-Ethernet Upgrade
  • Core Ring (3 Regional Hubs)
  • Regional Hub fiber / building access
  • ADOT fiber bottleneck relief (I-17, TOC to I-10)
  • Partial West Ring
  • Glendale Regional Hub
  • Six Metropolitan Hubs
  • - ADOT TOC - Glendale TMC - Phx Public
    Transit
  • - Phoenix TMC - Peoria TMC - MAG

7
(No Transcript)
8
Phase 1A The 1.6M Package
  • Advantages
  • Builds the core ring part of west ring
  • Provides RCN connectivity to Glendale TMC
    (arena / stadium events, Superbowl, etc.)
  • Provides RCN connectivity to Peoria TMC
    (ADOTs alternate TOC location)
  • Eliminates ADOT fiber bottleneck point
  • Connects Six Metropolitan Hubs
  • - ADOT TOC - Glendale TMC - Phx Public
    Transit
  • - Phoenix TMC - Peoria TMC - MAG

9
Future RCN Equipment Config.
  • RCN Phase 1 2 will provide the fiber
    connectivity and AZTech network switches needed
    for transportation agencies.
  • It is anticipated that IT departments will
    install CWDM / SONET equipment in the future,
    while maintaining AZTech network connectivity at
    design bandwidth.

10
AZTech Network Configuration
  • AZTech Ethernet Network (Phase 1 2)

2 fibers and 2 spares
2 fibers and 2 spares
AZTech Regional Hub
AZTech Regional Hub
AZTech Regional Hub
2 fibers and 2 spares
11
Future RCN Equipment Config.
  • AZTech Ethernet Network with IT department CWDM
    / SONET

SONET OC-48
AZTech Regional Hub
CWDM
CWDM
CWDM
CWDM
AZTech Regional Hub
AZTech Regional Hub
CWDM
CWDM
SONET OC-48
SONET OC-48
12
JUICE Deployment
  • JUICE Joint User Interoperability
    Communications Enterprise
  • Project Partners
  • ADOT
  • Arizona DPS
  • City of Phoenix Street Transportation Dept.
  • City of Phoenix Information Technology Dept.
  • Maricopa County Telecommunication Dept.

13
JUICE Deployment
  • The original JUICE Proof of Concept

14
JUICE Deployment
  • Installs 3 SONET OC-48 Regional Hub nodes
  • ADOT Traffic Operations Center
  • DPS Encanto Headquarters
  • City of Phoenix Calvin Goode Building (IT Hub)
  • Uses existing fiber from DPS to ADOT to Phoenix
  • Will use RCN Core Ring path in future

15
JUICE Deployment
  • SONET OC-48 Regional Hub networks
  • - AZTech WAN - DPS CAD LAN Extensions
  • - ACTIC Video WAN - City of Phoenix WAN
  • - ADOT WAN - Maricopa County WAN
  • - DPS WAN
  • DPS currently has primary responsibility for
    JUICE network configuration changes.
  • Equipment procurement / installation is underway.
  • Discussions have started for third party
    OM support.

16
Future RCN Configuration
  • AZTech Ethernet Network with IT department CWDM
    / SONET

SONET OC-48
AZTech Regional Hub
CWDM
CWDM
CWDM
CWDM
AZTech Regional Hub
AZTech Regional Hub
CWDM
CWDM
SONET OC-48
SONET OC-48
17
OM for AZTech Network
  • AZTech Ethernet Network (Phase 1 2)

2 fibers and 2 spares
2 fibers and 2 spares
AZTech Regional Hub
AZTech Regional Hub
AZTech Regional Hub
2 fibers and 2 spares
18
OM for AZTech Network
  • MCDOT will manage project to develop OM plan for
    AZTech network under current grant funding.
  • It is currently envisioned that each agency will
    be responsible for maintaining the RCN fiber in
    their jurisdiction.
  • Each jurisdiction will be responsible for
    providing and maintaining their own firewall.

19
OM for AZTech Network
  • OM plan for AZTech network components will
    cover the development of a JPA/MOU for RCN Phase
    1 2.
  • AZTech partners will need to decide if ADOT will
    continue to be the lead agency for AZTech
    network configurations (i.e., IP address
    assignments, equipment maintenance)

20
Managing RCN Future Growth
  • AZTech Ethernet Network with IT department CWDM
    / SONET

SONET OC-48
AZTech Regional Hub
CWDM
CWDM
CWDM
CWDM
AZTech Regional Hub
AZTech Regional Hub
CWDM
CWDM
SONET OC-48
SONET OC-48
21
Managing RCN Future Growth
  • What multi-agency forum will take the lead for
    the following?
  • Coordinating connectivity to other facilities
  • Deciding how the bandwidth will be utilized
  • Selecting an appropriate SLA
  • Policy decisions on how future upgrades will be
    funded
  • Policy decisions on how the cost of OM will be
    divided up among participating agencies and/or
    their respective departments

22
Managing RCN Future Growth
  • JPA / MOU Needed for future RCN
  • OM Plan Needed for future RCN
  • Maintaining fiber links
  • Maintaining network equipment
  • Control of access
  • Other issues

23
Project Contacts
  • Debra Barker, P.E., ITS Project Manager
  • ADOT Transportation Technology Group
  • (602) 712-4281
  • dbarker_at_azdot.gov
  • David Haines, P.E., Project Manager
  • Kimley-Horn and Associates, Inc.
  • (602) 906-1163
  • david.haines_at_kimley-horn.com
Write a Comment
User Comments (0)
About PowerShow.com