Title: MIB Center Metrology Innovation, Business Center
1MIB CenterMetrology Innovation, Business Center
- "Solutions come through the EXECUTION of
thoughtful STRATEGIES"
2Table of Contents
- 3. Executive summary
- 4. Objective
- 5. Key Benefits
- 6. Cost justification
- Interactive numbers slide
- 7. Actual company savings
- 8. Cost benefits Analysis
- 9. Case study
- 13 Core Competencies
- 14. Experience
- Real life applications
- 15. APQP
- 16. MIB Quality Documentation
- 17. Off line programming / simulation
- 18. Modular fixturing
- 19. World class CMM work instructions
- 20. Quality documents auto detection
- 21. Recap of Key benefits
- 22. Closing
3Executive Summary
4Objective
- To have a Paradigm shift in business thinking of
todays Lean Manufacturing practices for out
sourcing strategic services - To show the Cost benefits for Outsourcing some
quality functions. - Demonstrate applications of advanced technology.
- Demonstrate the business strength and strategic
vision. - Demonstrate Quality expertise and depth.
- Demonstrate Parallel processing, to reduce costs.
- In short, we would like to be your contract
quality service supplier
5Key Benefits of MIB Center
- Reduced direct labor costs
- Slash non-value-added time
- Compressed lead times-from days or weeks to hours
if needed - Improved Company cash flow
- Improved part accuracy
- Reduced indirect costs
- Improved customer satisfaction
- Improved competitiveness seek new customers and
markets - Greater profitability
6Cost JustificationHighlighted yellow items are
dedicated formulas Do not type in these boxes.
Interact with your numbers in non highlighted
cells
Click over text to interact
7Company Savings
8MIB Cost Benefit Analysis Cont.
- The cost of carrying a skilled labor employee for
metrology in todays cost structure can be
expensive when an employer adds up the cost of - Wages
- Benefits packages
- Profit sharing / 401K match
- Training expenses
- Vacation / Sick days
- Holiday Pay
- Even at an exaggerated quantity of 100 programs
per year and 1200 per program the company has a
cost savings of approximately 19.28 to the cost
of quality (variables not taken into account)
9Business Case study 1859 ARCMM (1950 print
dimensions)
- Project Average Complex Machining of Aerospace
Product
- Synopsis Findings (linear processing)
- Engineering programs the machine program 75
hours - The first operation is run 16 hours
- The part is used to program the CMM 20 hours
- The second operation is run with program
corrections on the first operation completed 20
hours - The part is used to program the CMM 20 hours
- The third operation is run with program
corrections on the second operation completed
20 hours - The part is used to program the CMM 20 hours
- The fourth operation is run with program
corrections on the third operation completed 20
hours - The part is used to program the CMM 20
hours - The fifth operation is run with program
corrections on the fourth operation completed
20 hours - The part is used to program the CMM 20 hours
- The corrections are made on the fifth operation
and the First Article inspection is completed
16 hours - TOTAL HOURS 287
10Business Case study 1859 ARCMM (1950 print
dimensions)
- Project Average Complex Machining of Aerospace
Product - Synopsis Findings (parallel processing)
- Engineering and Quality program the machine and
the CMM concurrently 75 hours - The first operation is run 16 hours
- The second operation is run with program
corrections on the machine and CMM on the first
operation 16 hours - The third operation is run with program
corrections on the machine and CMM on the second
operation 16 hours - The fourth operation is run with program
corrections on the machine and CMM on the third
operation 16 hours - The fifth operation is run with program
corrections on the machine and CMM on the fourth
operation 16 hours - The corrections are made on the fifth operation
and the First Article inspection is completed 8
hours - TOTAL HOURS 163 Note With CIP this is now
approximately 130 hours
11Business Case study 1859 ARCMM
- CONCLUSION
- The parallel processing from engineering and
quality, produced an improvement in reducing thru
put time in hours from 287 to 163. (43
reduction) - This improves your competitiveness on development
costs and time. - The intangible first time pass accuracy and ease
of use dramatically increased with less time
spent tweaking the program on the CMM.
12Business Case study 1859 ARCMM
- CONCLUSION cont.
- This programming methodology is more accurate
because it utilizes 3 dimensional routines for
geometries. - The CMM measurement programming can begin as soon
as a CAD model(s) are available.
13MIB Core Competencies
- Zeiss Calypso Off line programming, with
simulation package - Probe Design/Configurations
- Fixture design / build, both dedicated and
modular - World Cass CMM Work Instructions
- Custom Default CMM print outs
- Electronic Print ballooning
- Importable quality documents directly from the
print balloons - Auto population of quality documents FAIRs,
Control Plans Directly from blueprint. - Auto detection of results conforming /
non-conforming - AutoCAD R12, R14, 2000, 2002, 2005, 2007
- Cad systems
- Certified level 2 GDT technician
- APQP (advanced product quality planning)
- GRRs (gage repeatability and reproducibility)
- Quality Systems
- ISO 9001 2000
- QS9000
- AS9100
14MIB Experience
Customers
Products
- Automotive Market
- ATV Market
- Snowmobile Market
- Motorcycle Market
- Marine Market
- Lawn and Turf
- Medical Market
- Aerospace Market
- Castings
- Billets
- Machining
- Assemblys
15 APQP
MIB Application
16Print Ballooning / Document Auto Population
Auto Population of Reports directly from drawing.
Data Entry / Document Generation reduced to
seconds
MIB Application
17MIB ApplicationCMM Programming/Simulation
18MIB ApplicationModular Fixturing
MIB Application
19 Customer XXXX
Part Number XXXXXX
CMM Program XXXX op 30
Required Probe(s) XXXX
- Step 1 FIXTURE SET UP
- Place left L post in 11th hole from right as
shown - Place 3x1 standoffs in second hole from bottom
- Place ¾ x 2 stand off in 7th hole from bottom
- Place red clamp in 3/4 standoff as shown
- Place right L post in 5th hole from right as
shown - Place 3x1 standoffs in second hole from bottom
- Place ¾ x 2 stand off in 7th hole from bottom
- Place red clamp in 3/4 standoff as shown
7
3
8
4
World Class CMM Instructions
1
5
2
6
Note Work Instructions placed on Network and
in the CMM program for ease of use
1 of 5
20Results Entered, are Auto detected
MIB Application
Results are black if conforming RED if non
conforming to eliminate errors
.114
.136
21Key Benefits of MIB Center
- Reduced direct labor costs
- Slash non-value-added time
- Compressed lead times-from days or weeks to hours
if needed - Improved cash flow
- Improved part accuracy
- Reduced indirect costs
- Improved customer satisfaction
- Improved competitiveness seek new customers and
markets - Greater profitability
22Closing
- Question Answer session
- Thank You
- Paul Como
- 218-234-6123 (cell)
- paul.como_at_yahoo.com