Title: SWPA Standard


1
Safe Work Planning Authorization(SWPA) Shell
Standard HSE-0008
SWPA Standard
2
Background
To address SEPCos safety performance
plateau and recurring incident findings, several
key improvement opportunities identified from the
study included were
  • Improving work place hazard recognition
  • Eliminating work planning/process
    inefficiencies, and
  • Improving overall HSE cultural commitment.

In 2006, a Project Execution Team was charged to
develop strategies and coordinate implementation.
SWPA Standard
3
Intentions today are to
  • Make you aware of the new standard
  • Capture your concerns, and address later

SWPA Standard
4
SWPA Standard
5
Changes found in the revised Standard 008
  • Merging of old onshore (HSE0008B) and offshore
    (HSE0008A) Standards
  • Allows for greater consistency between all
    facilities
  • Excerpts from OSHA Regulations referenced as
    external documents
  • Less wordy, more references
  • Removed Welding Burning Procedure
  • Removed Excavation Procedure
  • Added new terminology to Standard more Roles
  • Global change to all SEPCo facilities
  • It is condensed reader friendly

SWPA Standard
6
Changes found in the revised Standard 008
  • Provided consistent documentation from job
    planning through close-out
  • Process promotes increased leadership involvement
    in work planning
  • Increased emphasis to the role of job sponsorship
  • Provided a tool which identifies job sponsorship
    expectations
  • Revised job risk assessment process incorporating
    (2006) Shell Risk Activity Matrix (RAM)
  • Replaced 3x3 matrix with updated Job Planning
    Matrix (JPM)

SWPA Standard
7
Changes found in the revised Standard 008
  • Added electronic tool, ISSOW, to enhance job
    planning, documentation, work authorization, and
    knowledge transfer
  • Streamlined and interconnected Work Certificates,
    Job Safety Analysis, LOTO, Confined Space Entry,
    Safe Work Plans and SIMOPs
  • Name changes for SWPA roles (Performing
    Technician, Area Authority, Isolation Authority,
    Work Party, etc.)
  • Color-coded permit system (stamping of permits no
    longer necessary)
  • Now two types of Cold Work permits (regular and
    breaking containment) and two types of Hot Work
    permits (flame and spark potential

SWPA Standard
8
Changes found in the revised Standard 008
  • Added new type of permit called Energized
    Electrical Work
  • Added improvements to LOTO isolation procedures,
    including provisions for use of "lock box"
  • New feature for De-isolation for test.
  • Eliminated exclusive control option for
    hydrocarbon service
  • Allowable entry level reduced (more conservative)
    to 20.7 to 20.9 Oxygen (from 19.8)

SWPA Standard
9
Issues and Concerns