Banco de Dados de Explorao e Produo BDEP - PowerPoint PPT Presentation

1 / 26
About This Presentation
Title:

Banco de Dados de Explorao e Produo BDEP

Description:

... agency responsible to regulation all of Oil & Gas brazilian ... 1999: First Bid Round. 2000: BDEP`s Inauguration (29/May/2000) 2000: Second Bid Round ... – PowerPoint PPT presentation

Number of Views:70
Avg rating:3.0/5.0
Slides: 27
Provided by: luizsgu
Category:

less

Transcript and Presenter's Notes

Title: Banco de Dados de Explorao e Produo BDEP


1
NDR7 - COUNTRY REPORT
Agência Nacional do Petróleo, Gás Natural
e Biocombustíveis ANP NDR7 - September -
2006
2
NDR7 - Generalities
  • Name of Country Brasil
  • The ANP is the agency responsible to regulation
    all of Oil Gas brazilian activities (upstream
    and downstream)
  • ANP is the responsible for managing and storing
    Exploration and Production data acquired in
    Brazilian Onshore Offshore areas.

3
NDR7 - National Repository
  • WHAT IS BDEP?
  • Its the National Repository of exploration
    and production data acquired in Brasil.
  • Currently it stores seismic, well log and
    potential field data (Grav/Mag).
  • It includes data acquired during Petrobras
    monopoly (pre 1998) and also those acquired after
    Brazil opened the market to other companies (post
    1998).

4
NDR7 - National Repository
BDEP, ITS IMPORTANCE
  • BDEP is the source of basic data for the
    geological studies to be carried out in the
    Brazilian Sedimentary Basins.
  • These data are very important for the companies
    in their exploration efforts.
  • They are also essential for ANP, which uses them
    in its own projects, and in the licensing rounds
    (areas evaluation, preparation of the data
    package, etc.).

5
NDR7 - National Repository
A little bit of history
1938 Creation of the CNP (National Oil
Counsil) 1939 Oil Discovery in Lobato,
Bahia 1953 Creation of Petrobras 1997 Creation
of ANP by Law 9.478 (06/Aug/1997) 1998 ANP
started operating (January) 1998 Petrobrass
Concession Contracts (BID 0) 1999 First Bid
Round 2000 BDEPs Inauguration (29/May/2000)
2000 Second Bid Round 2001 Third Bid Round
2002 Fourth Bid Round 2003 Fifth Bid Round
2004 Sixth Bid Round 2005 Seventh Bid Round
6
NDR7 - National Repository
BDEPs Creation
  • The administration of the technical data
    acquired in the EP activities of the oil and gas
    industry in Brazil is an ANPs legal attribution.
  • To take care of this attribution a National
    Data Repository was necessary.
  • Other Countries models had been studied. The
    Brazilian model was based in the Norwegian one
    (DISKOS group).

7
NDR7 - National Repository
BDEPs Creation (cont.)
  • The Brazilian Geological Survey - CPRM was
    chosen to help ANP in the setup, administration
    and operation of the Data Bank.
  • The software adopted was PetroBank (seismic and
    well logs).
  • CPRM hired PGS Data Management, then owner of
    the PetroBank system (today Landmark Graphics
    Co.), to support the planning and the future
    operation.
  • Today ANP has a service contract with
    Halliburton/Landmark.

8
NDR7 - National Repository
BDEPs Creation (cont.)
  • The BDEPs setup project lasted 1 year
    (1999/2000) and involved
  • - Site preparation
  • - Infrastructure installation
  • - Hardware and Software acquisition
  • - Loading Petrobra's Data
  • - Operation Testing.
  • During this step a first Steering Committee was
    created with 15 Institutions between Service
    Companies, Operators, Consulting companies and
    Universities.
  • BDEP started operating in 29/05/2000.

9
NDR7 - National Repository
BDEPs Creation (cont.)
Installed in 1.100 m2 at CPRMs Office in Rio de
Janeiro (Bloco A4), BDEP works 24 hours a day, 7
days a week.
10
NDR7 - National Repository
Equipment
Robotic Tape Library with 23,37 Tb capacity.  
11
NDR7 - National Repository
Tape Archive (3590 tapes)
Storage Capacity 120.000 cartridges
12
NDR7 - DATA OWNERSHIP
IPR and Licensees data retention obligations
The IPR (Intellectual Property Rights) in data
held by brazilian state. The companies can buy
only the rights of use them. Licensees data
retention obligations is mandatory until end of
contract with ANP.
13
NDR7 - SCALE INDICATOR
National Scale Indicator
  • Processed Seismic data
  • - 289 cartridges (3590)
  • - 12,21 TeraBytes 
  • Pre-Stack Seismic data
  • - 182,917 cartridges (3590)
  • - 1,7444 PetaBytes
  • Wells cultural data - 22.286
  • Wells with logs loaded in Pbank - 20.003
  • Well File Reports 17.542
  • Composite Log - 4.343
  • Potential field methods (Surveys) 245

14
NDR7 - TIMING OF RELEASE
Timing of release
Well Data 02 years Post-stack seismic
data 05 years Pre-stack seismic data 05
years Reprocessing seismic data 05 years
Interpreted Data Never release
Speculative/non-exclusive data 10 years
Production Data 02 years On license
surrend./relinq. Immediately public
Cultural Data Public
15
NDR7-RELEASE MECHANISM
Release Mechanism
The responsible for release data is the
ANP. Data in surrend./relingd. are
immediately public
16
NDR7 - BUSINESS MODEL
Business Model
COMPANIES UNIVERSITIES ANP
OPERATORS EADs
BDEP
Receives Well, Seismic or Potential field data
Provides Public data ()
() - Or confidential for the ANP
17
NDR7 - BUSINESS MODEL
BDEP Users
  • The BDEP attends associated users and eventual
    users, besides the ANP itself, today its largest
    client.
  • To become an associated user, a company must
    sign a Users Term, valid for one year.
  • Universities have a special treatment.

18
NDR7 - BUSINESS MODEL
BDEP Associated Users
19
NDR7 - BUSINESS MODEL
Price List of BDEP Associated Users
20
NDR7 - BUSINESS MODEL
Price List of BDEP Eventual Users
21
NDR7 - BUSINESS MODEL
Last data required
22
NDR7 - PROMOTIONS
New Licenses
  • All contacts with the clients is held by the
    Help-Desk (helpdesk_at_bdep.gov.br).
  • You can query BDEPs data through
  • - Clients' room
  • - CD with Shapefiles
  • - Email/ telephone for the Help-Desk
  •  
  • - Maps
  • - Internet - BDEP Web Maps

23
NDR7 - PROMOTIONS
PORTAL www.bdep.gov.br
24
NDR7 - PROMOTIONS
SEARCH DATA BDEP WEBMAPS
25
NDR7 FUTURE PLANS
  • Change 3590 tapes (10GB) for 3592 (300 GB)
  • Use a 23TB Storage to load post-stack seismic
    and reprocessed seismic data in disk
  • Build a Visualization Room
  • Build a Core Sample and Fluids Digital Databank
  • Finally, load PRODUCTION data in Petrobank.

26
NDR7 - 2006
NDR7 Obrigado ANH Colombia!
PAULO ALEXANDRE SOUZA DA SILVA ENGINEER-
REGULATION SPECIALIST pasilva_at_anp.gov.br
Write a Comment
User Comments (0)
About PowerShow.com