ESCS Work Status - PowerPoint PPT Presentation

About This Presentation
Title:

ESCS Work Status

Description:

Efficient and optimized communication = no transport reliability ... messages without an active registration session = alleviates security problem ... – PowerPoint PPT presentation

Number of Views:66
Avg rating:3.0/5.0
Slides: 7
Provided by: ssre9
Learn more at: https://grouper.ieee.org
Category:
Tags: escs | alleviates | status | work

less

Transcript and Presenter's Notes

Title: ESCS Work Status


1
ES/CS Work Status
  • Agreement on the transport requirements
  • Ongoing email discussion on some aspects
  • MIH discovery
  • MIH Capability discovery
  • MIH Registration
  • Split requirements at MIH protocol level and
    transport level

2
ES/CS Message Reliability
  • Objective
  • ES/CS messages must have reliability
  • Approaches
  • MIH protocol level reliability
  • Efficient and optimized communication gt no
    transport reliability
  • Reliability at transport level
  • May have to use a session based transport e.g.
    TCP
  • May add transport message exchanges gt latency
  • MIH Protocol level reliability requires
  • NAT-PT tranversal (already agreed)
  • Firewall traversal (new one)

3
MIH State Diagram
MIH Idle
MIH Discovery
MIH ES/CS Registration
MIH Capability Discovery
MIH Active
4
MIH Discovery Capability Discovery
  • MIH Discovery
  • to discover the address of MIH nodes in the
    network
  • Not defined in IEEE 802.21
  • Transport specific approach e.g. 802.11, IETF
  • MIH Capability discovery
  • To exchange MIH service capabilities between
    peers
  • Part of MIH protocol
  • Within the scope of IEEE 802.21

5
MIH ES/CS Registration
  • What is ES/CS Registration?
  • MIH protocol level message exchange to create MIH
    pairing
  • MIH peer registers with remote MIH peer to create
    a session for MIH message exchanges
  • MIH peers may not provide or accept MIH messages
    without an active registration session gt
    alleviates security problem
  • Can remain active even after handovers
  • Why ES/CS Registration?
  • Peer node to request for specific event
    indications
  • Peer node to send specific commands
  • Establishes a session setup and assigns an id
  • When to do ES/CS Registration?
  • Follows MIH discovery procedure
  • Before sending any ES/CS MIH messages
  • Deregistration to remove the MIH pairing

6
ES/CS Work Next Steps
  • Create a doc format for ES/CS requirements for
    next meeting
  • Finalize MIH level protocol functionality related
    to capability discovery and registration
Write a Comment
User Comments (0)
About PowerShow.com