Title: HAMMER MAZE
1HAMMER MAZE
2CEILING BOLT
3FLOOR BOLT
4POSTS THESE ARE TWO SIZES OF SQUARE METAL POSTS
ONE SLIDING IN OTHER. THERE IS A CLIP THROUGH
THIS THAT HOLDS THE POST AT A CERTAIN HEIGHT. THE
BOTTOM AND TOP ARE PLACED OVER THE BOLTS IN FLOOR
AND CEILING. THE TWO POSTS ARE SLID APART AND
LOCKED INTO PLACE
5LATCHES HOLDING PANELS IN PLACE
6SLIDING LATCH
7PANELS FASTENED TO POSTS
8(No Transcript)
9PANEL TO SIMULATE WALL STUDS
10PROP LAID ON FLOOR TO SIMULATE RAFTERS
11(No Transcript)
12(No Transcript)
13(No Transcript)
14RAMP TO SECOND FLOOR SO YOU WILL HAVE TO GET
LADDER TO CLIMB OR USE OTHER METHODS
15(No Transcript)
16METHOD THAT WE WILL BE USING IN OAK HARBOR
USE ONE METAL POST AND THREADED POST THAT SLIDES
INTO. THIS WILL BE SCREWED UP INTO A 2X4 ACROSS
CEILING AND BOLTED INTO PLACE. THE METAL POST
WILL BE PLACED OVER A BOLT ANCORED INTO THE
FLOOR. WE WILL THEN MAKE PANELS AND HOLD IN PLACE
LIKE HAMMER