Title: Introduction to ICE
1(No Transcript)
2Introduction to ICE
- ICE has both local and overseas Combustion
Engineering experience - ICE has electrical engineering and software
engineering for automation of DCS or PLC control
systems available in house. - ICE has an experienced team of boiler, combustion
and electrical service man available for all 24
hr break down service
3Industrial Combustion Systems
- Design of custom built systems to suit both your
process and equipments requirements. - Australian and international experience in heavy
industrial fuel train system design - Experience in Rotary Kilns Dryers, Fluid Bed
Dryers and Calciners. - Burners for
- Natural Gas, LNG, Propane, Butane or process
waste gases. - Heavy fuel oil systems including pumping and
heating skids - Light fuel oil
- Waste oil systems
4Preferred Metso Service Provider
- ICE is the preferred service provider for all
Metso Minerals (Pyrotherm) Pty Ltd Fluid Bed
dryers and calciners. - We are able to service or advise on the operation
of the plant as well as the control and
combustion system - ICE has access to Pyrotherms technical
resources. Access to this information enables
ICE to, recommend improvements and make service
proposals directly to you, in liaison with Metso
Minerals (Pyrotherm) Pty Ltd.
5Burner Systems
- Fuel Train design
- Welding to AS4041
- All valves selected to increase both control and
performance - Systems installed throughout W.A. also sites in
Vic., N.S.W. Qld, and Overseas
With careful design of the burner and fuel train
we were able to achieve excellent control with
greater than 401 turndown
6Systems to Suit Your Requirements
- If dust or weather is a problem?
- We can either build an IP 65 fuel train or a
standard fuel train within an IP 65 enclosure.
7Heavy Fuel Oil Skid
- We commissioned a 58GJ/h air atomising Magna
Flame burner and fuel train system on a rotary
dryer in a Pot Ash Plant in Jordan. - The panel was fully simulated and tested in our
shop
8Burner Control Panel
9Process Simulation
- All panels are fully pre-commissioned
- Our PLC simulates the complete process proves
the operation of panel
- Safety interlocks are all tested and signed off
as part of our QA documentation
Due to the thorough pre-commissioning the on site
commissioning time is considerably reduced
10Boilers
Reconditioning of old boiler
11Work carried out on 60 HP Cleaver Brooks Boiler
- Non Destructive Testing of
- Furnace to tube sheet welds
- Shell thickness.
- Up graded the Burner Control Panel to
incorporate - Pressure transmitter
- Fully modulating fuel train
- Common reset on panel
- Fault and status indication
12BOILER INSTALLATION
- ICE provides full turn key packages including
design, installation and commissioning - Electrical
- Gas Supply
- Burner and Fuel Train
- Pipe work
13PIPE WORK INSTALLATION
- Pipe work design
- Installation
- Lagging
14De-aerator
Reducing dissolved oxygen from parts per million
to parts per billion significantly reduces the
need for expensive O2 scavengers
Reverse Osmoses plants feeding the de-aerator can
eliminate scale problems and reducing the need
for blow downs. This combination RO and
de-aerators can easily save in excess of 30,000
per year in chemical cost on 3000l/hr of make up
water.