Title: Introduction to ICE


1
(No Transcript)
2
Introduction to ICE
  • ICE has both local and overseas Combustion
    Engineering experience
  • ICE has electrical engineering and software
    engineering for automation of DCS or PLC control
    systems available in house.
  • ICE has an experienced team of boiler, combustion
    and electrical service man available for all 24
    hr break down service

3
Industrial Combustion Systems
  • Design of custom built systems to suit both your
    process and equipments requirements.
  • Australian and international experience in heavy
    industrial fuel train system design
  • Experience in Rotary Kilns Dryers, Fluid Bed
    Dryers and Calciners.
  • Burners for
  • Natural Gas, LNG, Propane, Butane or process
    waste gases.
  • Heavy fuel oil systems including pumping and
    heating skids
  • Light fuel oil
  • Waste oil systems

4
Preferred Metso Service Provider
  • ICE is the preferred service provider for all
    Metso Minerals (Pyrotherm) Pty Ltd Fluid Bed
    dryers and calciners.
  • We are able to service or advise on the operation
    of the plant as well as the control and
    combustion system
  • ICE has access to Pyrotherms technical
    resources. Access to this information enables
    ICE to, recommend improvements and make service
    proposals directly to you, in liaison with Metso
    Minerals (Pyrotherm) Pty Ltd.

5
Burner Systems
  • Fuel Train design
  • Welding to AS4041
  • All valves selected to increase both control and
    performance
  • Systems installed throughout W.A. also sites in
    Vic., N.S.W. Qld, and Overseas

With careful design of the burner and fuel train
we were able to achieve excellent control with
greater than 401 turndown
6
Systems to Suit Your Requirements
  • If dust or weather is a problem?
  • We can either build an IP 65 fuel train or a
    standard fuel train within an IP 65 enclosure.

7
Heavy Fuel Oil Skid
  • We commissioned a 58GJ/h air atomising Magna
    Flame burner and fuel train system on a rotary
    dryer in a Pot Ash Plant in Jordan.
  • The panel was fully simulated and tested in our
    shop

8
Burner Control Panel
9
Process Simulation
  • All panels are fully pre-commissioned
  • Our PLC simulates the complete process proves
    the operation of panel
  • Safety interlocks are all tested and signed off
    as part of our QA documentation

Due to the thorough pre-commissioning the on site
commissioning time is considerably reduced
10
Boilers
Reconditioning of old boiler
11
Work carried out on 60 HP Cleaver Brooks Boiler
  • Non Destructive Testing of
  • Furnace to tube sheet welds
  • Shell thickness.
  • Up graded the Burner Control Panel to
    incorporate
  • Pressure transmitter
  • Fully modulating fuel train
  • Common reset on panel
  • Fault and status indication

12
BOILER INSTALLATION
  • ICE provides full turn key packages including
    design, installation and commissioning
  • Electrical
  • Gas Supply
  • Burner and Fuel Train
  • Pipe work

13
PIPE WORK INSTALLATION
  • Pipe work design
  • Installation
  • Lagging

14
De-aerator
Reducing dissolved oxygen from parts per million
to parts per billion significantly reduces the
need for expensive O2 scavengers
Reverse Osmoses plants feeding the de-aerator can
eliminate scale problems and reducing the need
for blow downs. This combination RO and
de-aerators can easily save in excess of 30,000
per year in chemical cost on 3000l/hr of make up
water.