1
  • Online Calibration of Calorimeter
  • Mrinmoy Bhattacharjee
  • SUNY, Stony Brook
  • Thanks to D. Schamberger, L. Groer, U.
    Bassler,
  • B. Olivier, M. Thioye
  • Institutions SUNY, LPNHE-Paris,
    LAL-Orsay, Columbia

2
Overview
  • Topics discussed
  • Calibration of the Electronics
  • -- Procedure
  • -- Pulser Hardware
  • Online Calibration Software
  • -- Pulser control software
  • -- Calibration software
  • -- Validation software
  • Online Calibration Database
  • -- Table definitions
  • Summary

3
Motivation
  • Accumulate 0 bias data for each CAL cell with
    events
  • empty for Pedestals
  • pulsed for Pulser runs
  • Goals

4
Calibration System
Level 3
5
Calibration Pulser System
  • (LAL Orsay, LPNHE Paris)


  • 12 units for calorimeter 1 for ICD
  • ? smallest calibration unit 1 ADC crate

6
Pulser Control
PULSER
7
Pulser Control
  • Pulsers Configuration to download
  • signal height (DAC)
  • Enable for each pulser channel (patterns)
  • Commands
  • Delay
  • Calibration loop parameters
  • linearity/timing
  • number of events per step
  • step size
  • pulser patterns

8
Pulser Status
  • Pulser Status
  • -- Pulser boxes built, tested and installed
  • -- One final Pulser supply built
  • (rest to be built in next 2 months)
  • -- Fanouts and cables installed for ECN and CC
  • (ECS in Oct.)
  • -- Pulser Interface Board (PIB) - prototype
    tested
  • (Final version being
    built)
  • Software Controls
  • -- GUI can talk directly to PIB through EPICS
    or COMICS
  • -- can talk to Pulser in MCH via COOR by hand
  • -- working on link between GUI and COOR

9
Calibration software for DAQ commissioning
  • Version of Calibration cal_elec runs on online
    HOST
  • (since Feb, 2000 part of commissioning milestone)
  • grabs data from distributor
  • calculates ?, ?/channel
  • reports running ?, ?/channel
  • prints status report
  • being used to debug CAL crates

Pedestal run
Sigma tails from preamp capacitance
10
Calibration Tool for Level 3
  • Online Calibration Code will run at L3
  • -- will handle data for 12 ADC crates
  • -- pulser block PIB?timing/control?L3 (VBD ?)
  • defines DAQ set, Delay, Pls pattern
    etc.
  • -- access to raw data from ADC Crates (VBD ?)
  • -- calculates ??? for each channel for ????
    Gains
  • .
  • .
  • .
  • .

12 ADC Crates
L3 nodes
L3CalCalib
Crate 1
L3CalCalib
Crate 12
Data from 12 ADC crates
11
Calibration Tool for Level 3
  • l3CalCalib is implemented as an L3 Tool
  • -- l3CalCalib is an unpacking tool
  • -- will run as a Filter
  • L3CalCalib contains the L3 tool implementation
  • (1) Pseudo-constructor MakeMe()
  • -- initializes containers for data
  • (2) DoThisTool()
  • -- runs L3CalCalib tool
  • -- passes RawData chunk to _RunCalib(rawptr)
  • (3) _RunCalib(rawptr)
  • -- forms running sums and fills contsiners
  • (4) Write(L3DebugInfo myinfo)
  • -- calculates ??? for each channel when called
    by
  • ScriptRunner
  • Containers for Calibration data
  • 12 instances of CalCalib_AdcCrate class

12
Calibration as a Filter
  • L3CalCalib tool needs to be called as a filter at
    L3
  • -- ? tool needs to be registered
  • -- ? needs to be declared in tools.rcp
  • -- ? implemented as a filter (L3FCalCalib)
    in l3filters
  • -- ? needs to be registered as a filter
  • -- ? needs to be declared in filter.rcp
  • Then ScriptRunner can instantiate this filter
  • L3 does not have an end of run
  • So, when do we calculate the moments (we have
    running sums -- running moments hard on resources
    )?????
  • L3DebugInfo can be called from the ScriptRunner
  • every N events
  • invokes Write(L3DebugInfo myinfo) in
    L3CalCalib
  • copies calibration data into L3CalCalibDebugInfo
    class
  • packs into persistant D0OM object to ship to
    Host

13
Controlling Calibration at L3
  • L3CalCalib, L3CalCalibDebugInfo, L3FCalCalib
    implemented

ScriptRunner
Calibration Data D0OM object
L3FCalCalib
l3filters
Write(L3DebugInfo)
L3CalCalibDebugInfo friend class L3CalCalib
L3CalCalib
RunCalib()
L3 Tool for calorimeter online calibration
Data To Host
14
Calibration Procedure
  • Calib Taker starts Calibration Run
  • Through Configuration files
  • (1) Turn off 0 suppression
  • (2) Turn off Pulser for Pedestal runs
  • number of events to trigger
  • (3) Set Pulser for Pulser runs
  • number of events to trigger
  • select DAQ setting
  • select Delay setting
  • Cycle through all patterns
  • ? we end up with one set of calibration
    constants per run
  • Ramp through all DAQ, Delay settings and cycle
    through
  • all patterns to check linearity of the response
  • within the same run or in different runs
  • ? we will end up with Ramp? sets of calibration
    constants

15
Calibration Procedure
  • Contents of calibration data
  • Header ?
  • (1) Run Number, Run Date
  • By Channel ?
  • (2) Packed Channel ID (CrateCardBLSTwrDpth)
  • (3) Mean for ?1 and ?8 (for pulser runs only
    1 number)
  • (4) Sigma for ?1 and ?8 (for pulser runs only
    1 number)
  • (5) 16 bit error code
  • (6) Pulser pattern number
  • Calibration data committed to Data Base by ADC
    Crate
  • Calibration Data validated with valid runs in
    Data Base
  • Following Error flags set per channel
  • (1) lt4? of previous value Good channel
  • (2) 4? to 10? of previous value Flag warning
    for channel
  • (3) gt10? is Bad channel
  • If significant number (gt50) of channels in a
    crate are bad

16
Summary
  • Pulser Hardware Installed
  • Communication with Pulser through
  • COOR being worked out
  • L3 Calibration TOOL written as a L3 Filter
  • Being implemented in L3 framework and tested
  • Data Base tables defined
  • (more to be added)
  • TO DO ?
  • Complete Pulser communication
  • Migration of Calib code to NT -- mid October
  • Integrate Data Base tables -- mid October
Write a Comment