Title: Technical Working Group 9 October 2001
1Technical Working Group9 October 2001
2Agenda
- Background
- Test Environment Connectivity
- Production Environment Connectivity
- Multiple Connection support
- JSE Front-end Connectivity
- Message Authentication
- Customer Testing
- Questions
3Background
- Connectivity to the testing environment will be
available via JSE hub in South Africa from 26th
November 2001 after user has passed Conformance
Test - Connectivity to test environment via the UK
cannot be guaranteed by JSE - JSE has no infrastructure in London
- LSE WorldCom IP roll-out dependency
- Pilot Jan 2002
- Live implementation March 2002 onwards for
existing LSE clients
4Background
- Connectivity to Production environment will be
available via - JSE hub in South Africa
- WorldCom in the UK ..BUT...
- JSE has no infrastructure in London
- LSE WorldCom IP roll-out dependency
- Pilot Jan 2002
- Live implementation March 2002 onwards for
existing LSE clients - JSE Clients not based in UK will only gain
access 4th quarter 2002 via WorldCom - Users must ensure time synchronisation
- JSE must be satisfied that there are no fairness
issues present - JSE members will not form part of market
guarantee
5Test Connectivity
6Production Connectivity
7Production Connectivity
Multiple Systems Connectivity
8Production Connectivity
9Production Connectivity
10Requirements
- IP Addressing
- Test JSE SETS will be accessible on the same
network address range as the TEST JETAPI
currently - (196.26.123.64 255.255.255.192)
- Production JSE SETS will be accessible on the
same network address range as the production JET
and JETAPI currently. - (196.26.125.0 255.255.255.0)
- NB All existing services will continue to be
available. - JSE Information system data via UDP/Multicast
- Infrastructure must support Multicast for
Host-Host and Feed handler connections - Addresses will be made available shortly
11Requirements
- Bandwidth requirements to be clarified
- Conformance tests for Information system will be
- configured with values equal to production
- Values to be published shortly
- JSE physical site information for Telkom line
applications - This information is available via e-mail,
- please contact jsespec_at_jse.co.za
12Front-End Connectivity
- Requirements
- Workstation (64M RAM - NT or 2000)
- Server (SUN 100M RAM - Solaris 2.8)
- Line Speed (Guaranteed delivery)
- Local Hosting vs. JSE Hosting
- Backup (SLC and SLE)
- Admin (GL and Unix)
13Line Applications
14System Access Procedures
- Complete NAS request with all relevant customer
information and submit to JSE - Customer Network IP addresses (production and
test) - List of required services from JSE
- Number of connections, etc.
- JSE teams process request
- Configure Infrastructure
- Explain costing
- Issue contracts
- Trading Services
- Connectivity
- Testing Services
- Front-End (if applicable)
- Customer performs basic connectivity test with
JSE
15Message Authentication SII
Client establishes a TCP session to JSE
SETS. JSE SETS validates connection using the
USAP. Client logs on. Â Host Security Module
(HSM) generates session keys. HSM passes session
keys to JSE SETS. JSE SETS passes the session
keys back to the client  Client
software/hardware decrypts session keys using the
KEK, calculates MAC using the session keys and
application inserts the MAC into the message.
Headers are encrypted. Â Valid message is sent
to the JSE SETS
Â
Â
JSE SETS SII
CLIENT SYSTEM
Â
16Standards
- ANSI Data Encryption Standard (DES) X.3.92.
- The decryption procedure is described in ANSI
X9.17 (Financial Institution Key Management). - The Message Authentication Code (MAC) calculation
is based on the ANSI Data Encryption Standard
(DES) X.3.92. - The message authentication procedure used by LSE
is described in ANSI X9.19. - LSE uses double-length (128 bit) keys to prevent
exhaustive key determination. The method is
described in ANSI X9.19. - The entire message is not encrypted, only the
session keys and MAC is encrypted.
17Customer Testing Pre Go-live
- JSE will provide up to three conformance test
sessions per day from 26 November 2001 - 12h00 - 15h00
- 15h00 - 20h00 (only upon special arrangement)
- Each session tests trading and/or information
conformance - Continuous access connections to CDS
- 11h00 - 15h00
- 15h30 - 19h30
- Three levels of service
- Continuous access
- Blocks of regular time
- When you want it (minimum time will be part of
base testing service fee)
18Customer Testing Post Go-live
- Three conformance test sessions per week
- Access to continuous test environment
- 11h00 - 15h00
- 15h30 - 19h30
- Three levels of service
- Continuous access
- Blocks of regular time
- When you want it
19Next Session
Late October 11h00 JSE Auditorium
20QUESTIONS