Title: Cherry Creek Village North Reliability
1Cherry Creek Village NorthReliability
- Presented By Xcel Energy
- Tom Ashburn Area Manager
- Kerry D. McBee Area Engineer
2Topics
- Where outages have occurred
- Which homes were affected
- What were the outage causes
- What actions were performed by Xcel
- Which outages were due to overhead construction
3Electric System
Main Line Overhead (Sub Line) Underground (Sub
Line)
42003 Outages
Unknown 5 homes Action - inspected Transformer
5 homes (unknown) Action reset Broken
Crossarm 47 Homes (Broken tree branch) Action
replaced 3 overhead outages
52004 Outages
Transformer 12 homes (overload) Action -
replaced Cable Failure 13 homes Action -
repaired Cable Failure 10 Homes Action
repaired 0 overhead outages
62005 Outages
(3) Transformer 4, 5 ,5 homes (overload) Action
- replaced (unknown) Action reset (snow
debris) Action removed debris 2 overhead
outages
72006 Outages
Transformer 4 homes (overload) Action
replaced (2) Animal 17, 38 homes Action Work
Order Unknown 38 homes Action Work
Order Tree Int. 38 homes Action - Trimmed Car
hit pole Entire Area Action Replaced equip 3
System outages 5 overhead outages
82007 Outages
NONE
9Summary
- 2003 2007
- Total Outages 18
- Outages due to Overhead Construction 10 (56 of
total) - Total Homes experiencing outages 997
- (1 house w/ 2 outages 2 homes)
- Homes experiencing outages due to overhead
construction 383 (38 of total)
10Undergrounding Cost
- Sub line cable 7500 ft x 140
1,050,000 - Secondary cable 19,000 ft x 50
950,000 - Switch Cabinets 10 x 14,000
140,000 - Transformers 30 x 10,000
300,000 - Total 2,440,000
11?