Cherry Creek Village NorthReliability
  • Presented By Xcel Energy
  • Tom Ashburn Area Manager
  • Kerry D. McBee Area Engineer

2
Topics
  • Where outages have occurred
  • Which homes were affected
  • What were the outage causes
  • What actions were performed by Xcel
  • Which outages were due to overhead construction

3
Electric System
Main Line Overhead (Sub Line) Underground (Sub
Line)
4
2003 Outages
Unknown 5 homes Action - inspected Transformer
5 homes (unknown) Action reset Broken
Crossarm 47 Homes (Broken tree branch) Action
replaced 3 overhead outages
5
2004 Outages
Transformer 12 homes (overload) Action -
replaced Cable Failure 13 homes Action -
repaired Cable Failure 10 Homes Action
repaired 0 overhead outages
6
2005 Outages
(3) Transformer 4, 5 ,5 homes (overload) Action
- replaced (unknown) Action reset (snow
debris) Action removed debris 2 overhead
outages
7
2006 Outages
Transformer 4 homes (overload) Action
replaced (2) Animal 17, 38 homes Action Work
Order Unknown 38 homes Action Work
Order Tree Int. 38 homes Action - Trimmed Car
hit pole Entire Area Action Replaced equip 3
System outages 5 overhead outages
8
2007 Outages
NONE
9
Summary
  • 2003 2007
  • Total Outages 18
  • Outages due to Overhead Construction 10 (56 of
    total)
  • Total Homes experiencing outages 997
  • (1 house w/ 2 outages 2 homes)
  • Homes experiencing outages due to overhead
    construction 383 (38 of total)

10
Undergrounding Cost
  • Sub line cable 7500 ft x 140
    1,050,000
  • Secondary cable 19,000 ft x 50
    950,000
  • Switch Cabinets 10 x 14,000
    140,000
  • Transformers 30 x 10,000
    300,000
  • Total 2,440,000