Standardization Management Practical Help with Functional Assurance - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Standardization Management Practical Help with Functional Assurance

Description:

Head of Review and Assurance. Benefits of Using Stdz Management. Maximises projects procurement options: Reduces ... URD / SRD No Requirement No standard ... – PowerPoint PPT presentation

Number of Views:90
Avg rating:3.0/5.0
Slides: 15
Provided by: chr9151
Category:

less

Transcript and Presenter's Notes

Title: Standardization Management Practical Help with Functional Assurance


1
Standardization Management Practical Help with
Functional Assurance
  • Tom RichardsHead of Review and Assurance

2
Benefits of Using Stdz Management
  • Maximises projects procurement options
  • Reduces the burden on the MOD by only
    prescribing
  • essential standards at early phases
  • Allows for the empowerment of contractors to
    select product
  • standards and specifications
  • Ensures that standards chosen are directly
    linked to the
  • URD / SRD No Requirement No standard
  • Considers more complex project issues of
    Interfaces, Platform integration
  • Ensures Interoperability and interdependency
    issues have been considered for
  • the project and shared with the
    stakeholders
  • Considers the projects Integration and
    responsibilies in the wider MOD environment

3
Practical help to project teams
  • Provide IPTs / Projects with Standardization
    Management advice and guidance to support their
    through life management activities
  • DStan Web site, AOF contains specific guidance
    documents
  • DStan developed suite of tools and techniques to
    assist teams integrate our guidance into their
    specific project
  • Practical guidance is incorporated into the Stdzn
    Management Plan (SMP) for the project ie
    standards database and risk log
  • Practical guidance based on a range of topics and
    issues not just standards

4
Standardization Management- A Through Life
Activity
Concept
Assessment
Demonstration
Initial Gate
Main Gate
Develop broad/high level standardization Issues
Rationalizing standardization
Finalize standardization issues prior to
manufacture
Consider Existing standards applicability Tailori
ng standards Development of new
standards Standards proposed by
contractors (Assessment of proposals)
  • Consider
  • Safety
  • Performance
  • Interface
  • Legislation/Regulations
  • Levels of Standardization

Confirm Existing standards applicability Complete
development of new standards Standards proposed
by contractors (Assessment of proposals)
Manufacture
Disposal
In-service
Maintain Standardization Concepts
Maintain Standardization Concepts
Standardization concepts Mature
Updates
Track standards and maintain database
Consider Continuing need for project specific
standards
Confirm Standardization for additional acquisitio
n
Spares Post Design Services Technology Insertion
5
Practical Tools and Techniques
  • Generic Standardization Management Plan
    (Downloaded and converted into project specific
    SMP)
  • Standardization Maturity Model (Downloaded for
    the Maturity Model Exercise)

6
Standardization Management Plan (SMP)
  • Strategy
  • High level Stdz strategy for the project
  • Project/contractor interfaces
    responsibilities
  • Levels of Stdz either for whole or individual
    systems
  • How and when standards are to be used
  • Implementation Plan (details of Stdz activities)
  • Nomination of Stdz Officer and responsibilities
  • Selection of standards (using order of
    preference)
  • Communication of the Stdz issues
  • Develop contract requirements inc. tender
    assessment criteria
  • Planning for each phase of the CADMID cycle

7
The Standardization Maturity Model
  • Designed to increase IPTs Knowledge and
    Understanding of Standardization and application
    of principles to the project
  • Maturity levels reviewed at
  • Initial Gate Project at Developing Stage
  • Main Gate - Project at Performing Stage

8
Standardization Maturity Model
9
  • Standardization Management can be applied to
  • the Assurance Procedure to help a project meet
  • the Standardization Key Performance Indicators

10
Project Review Assurance Criteria
11
DGSE Assurance Process
12
Project Review Assurance
  • Implementing the Process
  • Meet with the IPTs Standardization Officer and
    discuss the project specific details and
    requirements
  • Determine the extent of assistance required then
    produce specific advice and guidance tailored to
    the project
  • DStan KPIs are applied to the project
  • SO sets about producing a project specific SMP
  • The Hd Assurance then Reviews the IPTs
    submission for the required phase and compiles
    the Assurance Report

13
Project Review Assurance
  • To Summarise - Stdz KPIs require
  • Standardization Management Plan
  • Standardization Maturity Model
  • Address NATO levels of Stdzn to support
  • Interoperability (if appropriate)

14
Any Questions
  • DStan Contacts
  • 0141 224 2531/2 (help desk)
  • 0141 224 2503 Fax (24 hours)
  • enquiries_at_dstan.mod.uk
  • requests_at_dstan.mod.uk
  • WWW http//www.dstan.mod.uk
  • WWW http//www.aof.dii.r.mil.uk
  • Hd Assurance 0117 913 4185
Write a Comment
User Comments (0)
About PowerShow.com