TRENCHLESS TECHNOLOGY HOW TO ACHIEVE THE DESIRED RESULT - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

TRENCHLESS TECHNOLOGY HOW TO ACHIEVE THE DESIRED RESULT

Description:

Unreasonable expectations of what could be achieved 'No-one ... TRENCHLESS TECNOLOGY APPROACH. Determine performance of existing network. Project Definition ... – PowerPoint PPT presentation

Number of Views:973
Avg rating:2.0/5.0
Slides: 29
Provided by: rcn
Category:

less

Transcript and Presenter's Notes

Title: TRENCHLESS TECHNOLOGY HOW TO ACHIEVE THE DESIRED RESULT


1
TRENCHLESS TECHNOLOGY - HOW TO ACHIEVE THE
DESIRED RESULT
  • Presenter
  • Philip McFarlane

2
Sewer Rehabilitation Survey 2001
  • Average Council Expenditure
  • 670k per year
  • Spending more than 1mil per year
  • 5 Councils
  • Mostly maintenance of individual assets
  • Some major upgrade projects
  • Most expected expenditure to increase

3
LEVEL OF SATISACTION
4
REASONS
  • Unreasonable expectations of what could be
    achieved
  • No-one told us that would be a problem
  • We did not think that was there
  • Not sure if contractor delivered what we wanted

5
TYPICAL PROJECT MANAGEMENT APPROACH
6
MORE UNCERTAINTIES WITH TRENCHLESS
  • Ground conditions
  • Existing pipe
  • Performance of the existing system
  • Performance of installation techniques

7
TRENCHLESS TECNOLOGY APPROACH
Project Definition
Determine performance of existing network
Investigate condition of existing system
Investigate subsoil conditions
Design
Implementation
Evaluation
8
PROJECT DEFINITION
  • Feasibility of project is investigated
  • Project budget determined
  • Project programme is determined
  • Roles and responsibilities allocated
  • Clear quantifiable objects set

9
TYPICAL OBJECTIVES
  • Increased capacity
  • I/I Reduction
  • Reduction in frequency of sewer overflows
  • Reduction in frequency of blockages
  • Less risk of collapse

10
DETERMINATION OF PERFORMANCE OF CURRENT SYSTEM
  • Sewer gauging and modeling
  • Spot gauging
  • Location of blockages
  • Location and frequency of overflows
  • Location of surcharging manholes
  • Locations where exfiltration occurs

11
SUBSOIL INVESTIGATIONS
  • Purpose to Identify
  • Hard/Softness of ground
  • Variable ground
  • Position of Interfaces
  • Services

12
SUBSOIL INVESTIGATIONS
  • Types of Investigations
  • History of area
  • Local knowledge
  • Boreholes
  • Test Pits

13
DETERMINATION OF THE CONDITION OF THE EXISTING
SYSTEM
  • Smoke and dye testing
  • CCTV inspection
  • Inspect/test manholes
  • Inspect/testing private drainage

14
SMOKE TESTING
15
CCTV INSPECTIONS
16
SEE THE PIPE
17
(No Transcript)
18
Profiler
19
Profiler Outputs
20
Identify Other Constraints
  • Areas where excavations not desirable
  • Permitted working times
  • Permitted working areas
  • Bypass pumping requirements
  • Environmental considerations

21
DESIGN -
FACTORS TO CONSIDER
  • Project objectives
  • Hydraulic requirements
  • Subsoil conditions
  • Existing conditions
  • Construction considerations
  • Required performance of new works

22
ITEMS TO BE ADDRESSED IN PERFORMANCE SPECIFIATION
  • Contractors responsibilities
  • Minimum performance requirements
  • Risks
  • Constraints
  • Existing conditions
  • Health Safety and Environmental Issues
  • Quality assurance procedures
  • How will performance be evaluated
  • What factors will the client consider in their
    evaluation

23
IMPLEMENTATION
24
CONTRACTORS QUALITY ASSURANCE DOCUMENTATION
Quality Manual
Project Plan
Process Plans
Inspection and Test Plans
25
QUALITY ASSURANCE AUDITS
Check contractors QA documentation
Check actual work processes
Check quality records
Compliance Audits
26
TYPICAL COMPLIANCE AUDITS
  • Samples of liner tested for strength
  • Hydrostatic test
  • CCTV inspection

27
Evaluation
  • Sewer gauging and modeling
  • Has frequency of blockages reduced
  • Long-term monitoring of performance

28
TRENCHLESS TECNOLOGY APPROACH
Project Definition
Determine performance of existing network
Investigate condition of existing system
Investigate subsoil conditions
Design
Implementation
Evaluation