Title: Canadian Seismograph Network Update
1Canadian SeismographNetwork Update
- Jim Lyons
- National Earthquake Hazards Program
- Geological Survey of Canada
2Overview
- Canadian National Seismograph Network (CNSN)
Changes from 2000 - 2002 - CHASME deployment
- POLARIS (code PO) network
3Glossary of Terms
ESP 3-c (ZNE), 100 sps, S-13 seismo EHZ 1-c
(Z), 100 sps, S-13 seismo SPZ 1-c (Z), 60 sps,
S-13 seismo BB 3-c, 40 sps, Guralp seismo HBB
3-c, 100 sps, Guralp seismo VBB 3-c, 40/20 sps,
STS-1 seismo
4CNSN Station Map 2002
5Queen Charlotte Islands
- RUB Prince Rupert, BC moved to RUBB, upgraded
from dialup EHZ to BB
6Southwestern British Columbia
- HNB Haney, LZB Mt. Lazard, PFB Port Renfrew, SHB
Sechelt, SNB Saturna Island, have all been
upgraded from EHZ to BB
- New BB station installed at HOPB Hope
7Yellowknife Array
- new BB station YKW5 co-located with VBB YKW1
in November 2001 - Re-survey for IMS certification showed many YKA
sites had wrong coordinates most off by lt 50
m, YKW1 1.75 km, YKW2 1.0 km - NEIC, IDC, IRIS DMC informed
8Charlevoix
A11, A16, A21, A54, A61, A64 upgraded from ESP to
HBB in Sept 2001
9Other Changes
- GGN St. George, NB (former ECTN SPZ) re-installed
as a CNSN BB - VLDQ Val dOr, PQ (40 km east of original ECTN
VDQ) installed as a CNSN BB - MNT Montreal, PQ, upgraded from EHZ to BB
- FNBC Fort Nelson, BC has moved approximately 25
km west renamed to FNBB - FSJ Fort St. James, BC was moved 3.5 km WNW and
is now FSB - GTO Geraldton, ON upgraded from regional analogue
to EHZ
10CNSN Summary
Total CNSN and regional 2000 121 May 2002
124 12 BB, -6 SP, -3 Analogue 20 more
temporary sites for CHASME and POLARIS experiments
11CHASME
- Canadian High Arctic Seismic Monitoring
Experiment
12(No Transcript)
13(No Transcript)
14POLARIS
- Portable Observatories for Lithospheric Analysis
and Research Investigating Seismicity
- a Canadian geophysical research consortium
focused on investigation of the structure and
dynamics of the Earth's lithosphere and the
prediction of earthquake ground motion
15POLARIS
- Will comprise 90 HBB seismographs in 3 sub-arrays
- Employ Nanometrics digitizers, VSAT telemetry,
and acquisition systems for continuous real-time
processing - Deployments to last 4-5 years
- Will eventually include MT systems
16POLARIS Network
17POLARIS Ontario Network
18POLARIS NWT Network
19POLARIS Western Network
20NEHP Role
- Archive continuous real-time POLARIS waveform
data - Make data available via AutoDRM and real-time
Internet feeds - By fall 2002, house and operate a second
Nanometrics Inc. VSAT hub (earthstation downlink)
21The End