Title: HoltraChem Site Inspection
1HoltraChem Site Inspection
2Hydrogen Building
3Cell Building Sump Enclosure
4Cell Building ground floor showing cell support
structure columns (left) carrying concrete beam
and concrete joists
5Acid plant platforms and catwalk
6Cell Building main floor cells and walkways
removed concrete joists (below) covered w/
plywood and tarps roof trusses supported only at
perimeter and on one row of central columns
7Cell Building main floor mezzanine for cell
repair at left one row of roof vents visible
8Cell Building main floor block wall enclosing
old control room bottom left opening to adjacent
drying shed upper left bridge crane overhead
corrugated transite panels enclosing building
9Inside drying shed green fiberglass panels
separating shed from Cell Building in background
drying tower at left
10Decon facility in sludge press building grating
covers entire floor, which drains to building
sump collected water is pumped to WWTP by
cantilever pump in adjacent brine prep area
11Decon facility
12Cell Building complex viewed from SW tall
liquifaction building at center w/ acid plant
platforms and pipe racks in foreground drying
shed at extreme right rear
13Junction of Cell Building (left) w/
Liquifaction Building (right) at rear both are
enclosed mostly w/ transite (white) panels green
panels are fiberglass
14Cell Building complex viewed from SE Drying
Shed in foreground (behind wall w/ mounted
brackets) Liquifaction Building at rear left
15Covered slab for depleted brine receiver, being
dug out to remove elemental mercury