Presenting the IDEAL Estimating System Integrated Data Evaluation - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Presenting the IDEAL Estimating System Integrated Data Evaluation

Description:

Richard F Seel. 985 Old Eagle School Rd Suite 513. Wayne PA 19087. 610-964-8200. dick_at_primetime.com ... A New Paradigm for Cost Estimating, Modeling, and Data ... – PowerPoint PPT presentation

Number of Views:71
Avg rating:3.0/5.0
Slides: 23
Provided by: willia537
Category:

less

Transcript and Presenter's Notes

Title: Presenting the IDEAL Estimating System Integrated Data Evaluation


1
Presenting the IDEAL Estimating
System(Integrated Data Evaluation Analysis
Library)
A New Paradigm for Cost Estimating, Modeling, and
Data Sharing
Presented to DOE ACE Team Conference May 9, 2001
Programming by Prime Time Contact Richard F
Seel 985 Old Eagle School Rd Suite 513 Wayne PA
19087 610-964-8200 dick_at_primetime.com
Cost Engineering by Team Analysis,
Inc. Contact William G Hombach 200 South 20th St
Suite B Purcellville, VA 20132 540-338-0601 wghomb
ach_at_teamanalysis.com
2
Central Library (i.e., ASTM)
Cost Models, Estimates, Data can be Run by Anyone
with Internet/Intranet Access ?AT NO CHARGE NO
SOFTWARE TO BUY
  • Share Project Cost Model
  • Share Cost Estimating Relationships/Cost
    Assemblies
  • Share Project Cost Estimates
  • Library Contributor Dictates
  • Accessibility from General Public to Company
    Personnel
  • Acquisition Charge if Any

3
Develop an Electronic Standard using eXtensible
Markup Language (XML)
  • Cross Platform (Windows, NT, Unix)
  • Cross Application (NORM, RTET, IDEAL, and
    Potentially many more)
  • Cross Network (Internet, Intranet, LAN)
  • Models Data as Objects
  • Dynamically Build Hierarchical Relationships

4
IDEAL Estimating System(Integrated Data
Evaluation Analysis Library)
  • Use IDEAL ?Create/Edit Compliant XML for Cost
    Models, Estimates, and Other Data
  • IDEAL is Truly Object Oriented
  • Module Tree View of Objects as Technology
    Elements
  • Phase Tree View of Objects as Schedule Elements
  • IDEAL Maps View of Objects Tied to Tree
  • Uses Class System to Objectify the Data (i.e.,
    ECES)
  • Uses Intelligent Light Client Server Technology
  • Available Over Internet Runs Without Browser on
    Users Machine
  • Is not Installed on Users Machine
  • No Versionitis? Always Latest Version

5
IDEAL Estimating System
  • Allows user to create Cost Estimating
    Relationships (CER)
  • Link CER to system level parameters (L_FT, W_FT,
    CY)
  • Shadow CERs from other (Horizontal Relationships)
  • Can use data or CERs from a Library of Components
  • Can Create new CERs through Portal to Spreadsheet
  • Develop Point Estimates representing CER
  • Develop Regression Analyses
  • Enter CERs, System of CERs, or Estimates into an
    IDEAL Component Library

6
Provide Cost Model Library for each Agency
  • Share Project Cost Models
  • Share Cost Estimating Relationships/Cost
    Assemblies
  • Share Project Cost Estimates
  • Make Data Library Accessible According to
    Security Clearance from General Public to Company
    Personnel

7
IDEAL Estimating System
IDEAL Modules or Plug-ins
  • Project Management
  • Develop Gantt Charts using SERs ? Interface with
    Project Management Software (i.e., Primavera)
  • Time Value (Current Year , Then Year , Net
    Present Value etc.)
  • Cost Risk
  • Monte Carlo Simulation
  • Range Estimating
  • Active Mapping
  • Desktop Integration
  • Build Wizards and Pre/Post Processors
  • SQL Import/Export ? Interface w/ Legacy Systems
  • Object Linking Embedding

8
Use of Spreadsheets
  • Advantages
  • Free Form
  • Can Develop Equation and Document on the Fly
  • Can Include Complex Relationships between Cost
    Elements
  • Not Constrained by Parent/ Child Relationships
  • Intuitive the Creator - no Programming Skills
    Needed
  • Disadvantages
  • No Apparent Conventions
  • Can be Difficult for user to Understand
  • Easily Broken by User
  • Spreadsheets become Volatile when too Large
  • Operates out of Memory not Storage
  • Security and User Interface is a Problem

9
Use of Database
  • Advantages
  • Can Handle Large and Complex Data Sets
  • Can Use Standardized Unit Price Databases
  • More Robust Less Likely to Break
  • Provides a more Intuitive User Interface
  • Better Security
  • Disadvantages
  • Referential Integrity
  • Requires Error Checking and Maintenance
  • Requires Programming
  • Locked into a Parent/ Child Relationships
  • Vertical Relationships
  • Difficult to Visualize Relationships within Data

10
IDEAL Estimating System
You Can Have Your Spreadsheet Database
Too!! With the advantages of both and
disadvantages of neither
  • Uses Spreadsheet Interface
  • Develop/Maintain Cost Models in Comprehensive
    Development Environment and/or Supporting
    Spreadsheets
  • (Develop CERs in Spreadsheet Templates Inside
    IDEAL or External for Conversion)
  • Export to Spreadsheets for Documentation and
    Other Uses
  • IDEAL is Object Oriented
  • Module Tree View of Objects as Technology
    Elements
  • Phase Tree View of Objects as Schedule Elements
  • IDEAL Maps View of Objects Tied to Tree

11
IDEAL Estimating System(Integrated Data
Evaluation Analysis Library)
Development Environment
  • Allows user to input information for a new CER
  • Link CER to system level parameters (L_FT, W_FT,
    CY)
  • Shadow CERs from other (Horizontal Relationships)
  • Can use data or CERs from a Library of Components
  • Can Create new CERs through Portal to Spreadsheet
  • Develop Point Estimates representing CER
  • Develop Regression Analyses
  • Enter CERs, System of CERs, or Estimates into an
    IDEAL Component Library

12
Project Cost ModelsExample - Bioslurping
  • Installation
  • Project Management
  • Bioslurping System
  • Media Filtration
  • Air Stripping
  • GAC
  • Thermal Oxidation
  • Off-Site Disposal
  • Remedial Design
  • Remedial Design
  • Operations
  • Project Management
  • Bioslurping System
  • Media Filtration
  • Air Stripping
  • GAC
  • Thermal Oxidation
  • Discharge to POTW
  • Process SA

13
IDEAL Estimating System
14
IDEAL Estimating System
Initial Screen ? Required Parameters
15
IDEAL Estimating System
Next Screen ? Secondary Parameters
16
IDEAL Estimating System
Default Tree View ? by Technology
17
IDEAL Estimating System
Project Phase Tree View
18
IDEAL Estimating System(Integrated Data
Evaluation Analysis Library)
2 Windows Opened and Tiled Windows ? Library,
Model, Estimate, or Data Can Copy From One to
Another New Branch in Tree Looks to Parent for
Data
19
IDEAL Estimating System
Technology Tree View ? Ex Situ Groundwater
Expanded Showing All Technologies (Enabled
Disabled)
Right Click Menu
20
IDEAL Estimating System
Running Air Stripping ? Secondary Parameters
Screen
21
Forms Dialogue used to Edit Parameters in
Worksheet
22
IDEAL Estimating System(Integrated Data
Evaluation Analysis Library)
Dynamic Scheduling
Write a Comment
User Comments (0)
About PowerShow.com