Title: Project Development Process PDP
1Project Development Process (PDP)
2PDP Three Project Levels
- Major Project 14 Steps
- Minor Project 10 Steps
- Minimal Project 5 Steps
3PDP - Major Project Level
- Major Investment Study
- New interchange
- Multiple alternatives
- Corridor type projects
- Large amounts of ROW
- Highway on new location
4 5Major PDP Step 1
6Major PDP Step 2
7Major PDP Steps 3, 4 5
8Major PDP Step 6
9Major PDP Step 7
1 Projects with non-standard railing types,
non-redundant designs and fracture critical
members require OSE approval 2 Prefabricated
structure types require OSE approval
10Major PDP Step 8
11Major PDP Step 9
3 Projects with non-redundant designs fracture
critical members require OSE approval 4 Projects
with special designs for prefabricated structure
types require OSE approval
12Major PDP Step 10
13Major PDP Step 11
14Major PDP Steps 12, 13 14
15PDP - Minor Project Level
- Bridge replacements, resurfacing (with drainage),
and safety projects - Projects may include ROW, utility relocations
16(No Transcript)
17Minor PDP Step 1
18Minor PDP Step 2
19Minor PDP Step 3
1 Projects with non-standard railing types,
non-redundant designs and fracture critical
members require OSE approval 2 Prefabricated
structure types require OSE approval
20Minor PDP Step 4
21Minor PDP Step 5
3 Projects with non-redundant designs and
fracture critical members require OSE approval 4
Projects with special designs for prefabricated
structure types require OSE approval
22Minor PDP Step 6
23Minor PDP Step 7
24Minor PDP Steps 8, 9 10
25PDP - Minimal Project Level
- Minor rehabilitation projects that do not alter
highway cross section or geometry - No ROW
- Minimal impacts to utilities
- No impacts to environmental resources
- Examples bridge painting, deck overlays,
scupper installations, barrier facings, concrete
sealing, partial depth repairs, etc
26(No Transcript)
27Minimal PDP Step 1
28Minimal PDP Step 2
29Minimal PDP Steps 3, 4 5
30Questions?