Title: Select Committee: Land and Environmental Affairs


1
  • Select Committee Land and Environmental Affairs
  • Oversight visit to Kruger National Park

2
Contents
  • Introduction
  • Status update and progress report on issues
    raised
  • Discussion and questions

3
Introduction
  • Select Committee visited Kruger National Park on
    2 5 March 2005
  • Select Committee prepared report on 06 September
    2005
  • Select Committee proposed a briefing by SANParks
    on issues reported upon
  • This presentations objective is to provide a
    status update and progress report on issues
    raised

4
Progress report
  • C. Overview of the KNP
  • 1.1 Core functions, mission statement and
    strategy
  • Aligned to SANParks Mission and Corporate
    Business Plan.
  • 1.2 Locations and sections within the Park
  • No notable changes.
  • 1.3 Size of the KNP and its species
  • No notable changes.
  • 1.4 Net Operating Income and Regional
    Management 1Structures
  • Re-organised from four (4) to three regions
    merged the Far North and Northern Regions.

5
Progress report
  • C. Overview of the KNP
  • 1.5 Employment Equity
  • No notable changes.
  • Employment Equity targets being adhered to
    94.7 Black.
  • 1.6 Land claims (p.3)
  • An additional claim has been accepted for
    processing i.e. Skukuza Camp.
  • SANParks will be guided by the outcomes of the
    Land Claims due processes, and will support
    mechanism to retain conservation ethics and
    programmes in successfully claimed land portions.
  • 1.6 Decline in International Tourists (p.4)
  • The international tourist numbers to the KNP have
    shown growth
  • First quarter of 2005/6 59,800
  • First quarter of 2006/7 71,200
  • Concessionaire-occupancies grew from 34.23
    (2004/5) to 42.98 (2005/6).

6
Progress report
  • C. Overview of the KNP
  • 1.7 Staff leaving the KNP (p.4)
  • The turnover rate at KNP is 10.6 in line with
    industry norms.
  • A succession strategy for the whole organisation
    is being developed to address loss of expertise
    due to retirement.
  • 1.8 Skills development
  • No notable changes.
  • Skills Plan in place.
  • 1.9 Medium term strategy
  • Aligned to the SANParks Corporate Business Plan.

7
Progress report
  • C. Overview of the KNP
  • 1.10 Veterinary Wildlife Services
  • No notable changes.
  • 1.11 Role of Veterinary Department
  • No notable changes
  • 1.12 Outsourcing of camps (p.8)
  • Only Jock of the Bushveld and Jakkalbessie
    bush camps were outsourced not most camps as
    reported.
  • Seven new facilities were developed through
    Public Private Partnership arrangements to cater
    for the higher end of the market.

8
Progress report
  • C. Overview of the KNP
  • 1.13 Fences along KNP
  • Discussions are underway to transfer funding from
    Department of Agriculture to SANParks for the
    management of fences.
  • This will result in SANParks being responsible to
    maintain all the border fences in KNP.
  • 1.14 Current projects
  • To date 45.3km of fence has been removed between
    KNP and Limpopo National Park (at the time of
    report 20km of fence was removed).
  • Only specific areas of the boundary fence has
    been/is being removed to account for security
    issues, vehicle theft and damage causing animals
    on communal farmland

9
Progress report
  • C. Overview of the KNP
  • 1.15 Accessibility to the park
  • Educational Programmes are in place to encourage
    exposure of the KNP to the previously
    disadvantaged communities both adults and young
    learners.
  • 1.16 Challenges facing the KNP
  • The state of tourism accommodation facilities was
    identified as the main challenge
  • R195m has been allocated to KNP for the next
    three years to upgrade infrastructure R136m
    will be used to address tourism facilities.

10
Progress report
  • D. Onsite Visits
  • Guest accommodation and camp sites used by
    campers is in need of major upgrade
  • Treasury approved R396m for upgrading
    infrastructure in SANParks for the next three
    years.
  • R136m will be used for tourism infrastructure
    upgrade in KNP.
  • R6m of the allocation will be used to upgrade
    camping sites.
  • Not enough accommodation suitable for
    individuals who are wheelchair based/physically
    disabled
  • Benchmarks is that 10 of facilities must be
    universally accessible.
  • KNP is at 3.
  • By the end of the three year Infrastructure
    Development Programme this benchmark should be
    achieved.

11
Progress report
  • D. Onsite Visits
  • 3. No proper drainage system in place in the
    campsite
  • The upgrade of campsites at Satara, Lower Sabie,
    Skukuza, and Berg en Dal will focus on
    improvement of drainage.
  • 4. Ablution facilities are inadequate and need
    upgrading 7 ablution facilities servicing 84
    campsites had no proper lighting and not
    accessible to those in wheelchairs
  • Upgrading of campsites will include
  • Additional lights along the paved roads.
  • Upgraded and new ablution facilities will be
    universally accessible.
  • A new ablution block at Satara complies with
    universally accessible criteria

12
Progress report
  • D. Onsite Visits
  • 5. People use KNP as a shortcut to cross to
    neighbouring countries. It was suggested that an
    extra fee be charged to haul heavy vehicles
    through KNP and such fee to contribute to road
    maintenance
  • Heavy vehicles are restricted
  • They may only use tarred roads in KNP.
  • They are required to use the nearest entrance
    gate to the delivery destination.
  • We are investigating the introduction of extra
    entry fee for those vehicles that are expected to
    start using the Giriyondo and Pafuri border
    posts.
  • 6. No adequate housing complex for ground staff.
    Proper infrastructure is needed to accommodate
    staff
  • R42.8m allocated to upgrade staff accommodation
    in the next three years.
  • Conversion of dormitories and single units into
    en-suite single units.
  • Upgrading of electrical power supply, water and
    sanitation services

13
Progress report
  • D. Onsite Visits
  • 7. One clinic situated near the staff quarters
    is not enough to service all the staff within the
    park
  • There is a clinic at Skukuza staff quarters.
  • A mobile clinic visiting all camps on a weekly
    basis has been introduced.
  • Negotiations with Limpopo province to establish
    second clinic in Letaba rest camp, and to
    introduce a second mobile clinic for the far
    north areas.
  • 8. Prices charged at shops inside KNP were
    exorbitant, putting local tourists at a
    disadvantage
  • Comparisons of prices should not be made between
    large retail stores with those of the shops in
    KNP
  • Shops are outsourced when run by SANParks they
    operated at a loss.
  • Differences in economies of scale stock
    management in KNP shops is not earmarked for
    volume/low prices but for essentials.
  • Cost base of shops in KNP is higher due to
    amongst others the wider distribution logistics.

14
Progress report
  • D. Onsite Visits
  • 9. The tendered contract period for businesses
    like restaurants and gift shops are too long and
    this disadvantages local community to take such
    opportunities
  • Tendered restaurant contract period is 9 and a
    half years this period accounted for
  • The expected investment amounts for
    renovations/upgrade of aging infrastructure, and
  • The period required to experience returns on
    investment.
  • The tender awarding criteria include Black
    Economi Empowerment as a key component this
    covers
  • Equity share ownership
  • Training and Employment Equity
  • Procurement from local supplier communities

15
Progress report
  • D. Onsite Visits
  • 10. Many services were outsourced and local
    communities are not given such opportunities to
    offer those services
  • The tendering process gives preference to local
    suppliers within the Mpumalanga and Limpopo
    provinces.
  • The vehicle fleet in the KNP was outsourced to
    Vuswa Fleet Services (Black Empowered).
  • The construction and building renovations
  • 12 local construction companies appointed on two
    year contract for building renovations and small
    to medium construction projects.
  • 12 local trainee contractors appointed for three
    to four years in partnership with CETA for them
    to be trained as construction businesses.
  • Supply of gardening services is outsourced to 4
    service providers from the local communities.
  • The supply of linen and other consumables are
    outsourced to service providers from local
    communities.