Title: ccr registration
150 WEB REDUCTION PROJECT
2- Three production facilities
16 Presses - 43 printing couples per
press - 96 pages - 24 multi-color
and 4 spot color - 160 Sovereign folder
- Three high formers
3TEN COLORLINER PRESSES
4SIX RETROLINER PRESSES
5 Phase I - Modification of running
presses Phase II - Modification of
down presses
6Scope Of Work
7SCOPE OF WORK 50 Project
PHASE I Press
8SCOPE OF WORK 50 Project
PHASE I Press
Reelroom
Phase II
9SCOPE OF WORK 50 Project
PHASE I Press
Reelroom
Unit Level
Phase II Pre-drilling - cylinder slots
Phase II
10SCOPE OF WORK 50 Project
PHASE I Press
Reelroom
Unit Level
Superstructure
Phase II Pre-drilling - cylinder slots
Phase II
RFB installation Angle bar - sidelay -
slitter drives - air PSI - electrical
- vacuum hoses - brackets
11SCOPE OF WORK 50 Project
PHASE I Press
Reelroom
Unit Level
Superstructure
Folder
Phase II Pre-drilling - cylinder slots
Phase II
RFB installation Angle bar - sidelay -
slitter drives - air PSI - electrical
- vacuum hoses - brackets
Tubular RTF install Former board -
modification - casting mod. Dbl.-nip
mod. Band modification Folding blade
mod. Stripper shoe mod. Down guide mod. 2nd fold
roller mod.
12SCOPE OF WORK 50 Project
PHASE I Support Equipment
13SCOPE OF WORK 50 Project
PHASE I Support Equipment
Newsprint
Phase II
14SCOPE OF WORK 50 Project
PHASE I Support Equipment
Newsprint
Mailroom
Phase II
Phase II
15SCOPE OF WORK 50 Project
PHASE I Support Equipment
Newsprint
Mailroom
Platemaking
Phase II
Phase II
Pre-work - punch coaters - exposure units -
vision benders - AB 5000 benders - western
benders - manual punch - manual bender
16SCOPE OF WORK 50 Project
PHASE II Press
17SCOPE OF WORK 50 Project
PHASE II Press
Reelroom
Reel arm stops Running belts
18SCOPE OF WORK 50 Project
PHASE II Press
Reelroom
Unit Level
Pick-up roller mod. VSI roller mod. Installation
- 50 ink rails - Form, transfer, dampening
rollers - Ink hoes - Spray bars -
Gates-pans-guards Lock-ups to 50
Reel arm stops Running belts
19SCOPE OF WORK 50 Project
PHASE II Press
Reelroom
Superstructure
Unit Level
Pick-up roller mod. VSI roller mod. Installation
- 50 ink rails - Form, transfer, dampening
rollers - Ink hoes - Spray bars -
Gates-pans-guards Lock-ups to 50
Reel arm stops Running belts
RFB installation Angle bar - sidelay -
slitter drives - air PSI - electrical
- vacuum hoses - brackets
20SCOPE OF WORK 50 Project
PHASE II Press
Reelroom
Folder
Unit Level
Superstructure
Tubular RTF install Former board -
modification - casting mod. Band
modification Folding blade mod. Stripper shoe
mod. Down guide mod. 2nd fold roller mod. Removal
of tail pin Conveyor mod. Dbl.-nip mod. Adj.
trolleys, slitters nips.
Pick-up roller mod. VSI roller mod. Installation
- 50 ink rails - Form, transfer, dampening
rollers - Ink hoes - Spray bars -
Gates-pans-guards Lock-ups to 50
Reel arm stops Running belts
RFB installation Angle bar - sidelay -
slitter drives - air PSI - electrical
- vacuum hoses - brackets
21SCOPE OF WORK 50 Project
PHASE II Support Equipment
22SCOPE OF WORK 50 Project
PHASE II Support Equipment
Newsprint
Laydown area - Sensor adj. - Roll stop adj. Roll
identification Software
23SCOPE OF WORK 50 Project
PHASE II Support Equipment
Newsprint
Mailroom
Sensor adj. Stop adj. Stacker adj. Other
equipment Software
Laydown area - Sensor adj. - Roll stop adj. Roll
identification Software
24SCOPE OF WORK 50 Project
PHASE II Support Equipment
Newsprint
Mailroom
Platemaking
Sensor adj. Stop adj. Stacker adj. Other
equipment Software
Laydown area - Sensor adj. - Roll stop adj. Roll
identification Software
Punch coaters Exposure units Vision benders AB
5000 benders Western benders Manual punch Manual
bender Software
25 - 50 Project started 1/17/99 - 50
Project completed 10/23/99 - 16 presses are
at the 50 web width - Press Control Project
started 1/3/00
2650 WEB REDUCTION PROJECT