Title: Army Campaign Plan Decision Point 97: ARFORGEN Knowledge Management
1Army Campaign Plan Decision Point 97ARFORGEN
Knowledge Management
- LTC Robert M. Smith
- DAMO-CIA
2Outline
- Objective
- Identify institutional processes directly
supporting ARFORGEN - Codify the ARFORGEN strategic information
requirements - What information is required for decisions
- Purpose of that information
- Owner and users of the information
- Organization responsible to generate the
knowledge in meeting the information requirements - Timeframe of the information
- Format for delivery
- Discussion of policies / procedures to share
knowledge internal to the Army and external with
CCDRs, JS, and OSD - Attendees one to two expert representatives from
organizations involved in ARFORGEN Knowledge
Management
3DP 97 / ARFORGEN Knowledge Management
ACP CO/MO
1-5
Lead G3/5/7 DAMO-CIA PROJ
Date Aug 2007 Assist HQDA, Army Commands,
ASCCs, DRUs Scheduled Date
29 Mar 2007
Narrative Description
Issues / Obstacles
Determine Enterprise Level policies and
procedures to manage and use knowledge within
ARFORGEN process. Determine enterprise level
ARFORGEN information requirements, authoritative
sources, and overall collaboration framework.
- Establish KM process that encourage information
sharing while protecting command and decision
prerogatives. - Determine for ARFORGEN Implementation
- What organization is responsible for ground
truth for what ARFORGEN knowledge? - What is Army proprietary knowledge?
Scope Major Tasks / Elements
- Establish ARFORGEN KM Framework
- Define decision superiority in the ARFORGEN
process. - Develop and clarify the distinction between the
strategic and operational KM context and identify
Army/Joint enterprise-level decisions in, or
supported by, the ARFORGEN process. - Develop the strategic guidance for organizations
to generate knowledge that answer ARFORGEN
information requirements. - Determine information requirements for HQDA,
FORSCOM, TRADOC, AMC, ASCCs DRUs to support
Army/Joint decisions in the ARFORGEN process. - Incorporate Lean Six Sigma Value Stream Analysis
to develop the ARFORGEN process and its sub-steps
by institutional function. - Establish ARFORGEN KM Policy and Procedures
- Develop the policies and procedures to share
ARFORGEN knowledge internally between Army
organizations and externally with OSD, JS, JFCOM,
and COCOMs. - Ensure Collaboration
- Coordinate development of Automation Support
Systems sufficient to ARFORGEN and Enterprise
level information requirements - Develop and approve the business rules for
ARFORGEN analysis, modeling and simulation. - Correlate the ARFORGEN automated solution to
knowledge management policies and procedures
Decision Forum(s) - Way Ahead
- ACP ASM 21 SEP 06 (Drilldown)
- ARFORGEN GOSC 23 MAR 07
- ACP CoC 26 MAR 07
- ACP 29 MAR 07
- ACP JUL 07
STRATCOMM
- Develop Command Info to build support for
information sharing requirements in ARFORGEN
Current Status
- ACP DP 68 (ARFORGEN Implementation Plan)
introduced the concept of ARFORGEN Knowledge
Management.
4Operationalize ARFORGEN at the Unit Level
ARFORGEN Knowledge Management
ARFORGEN Automation Integration
97
98
Information Line of Operations
Objective
ARFORGEN IOC Execute DARPL Operationalize
Ready for What Resource for What When at
the UIC-level to drive down-steam resource
automation systems
?
ARFORGEN Process
101
Lean Six Sigma
ExecuteDARPL
Process Line of Operations
C2 Line of Operations
99
ARFORGENGlobal Force Pool Structure
ARFORGENForce Laydown
- Refine the ARFORGEN process map.
- Identify senior leader decision points.
- Develop Critical Information Requirements.
- Develop the Knowledge Management framework.
(Policy, Procedures, Responsibilities) - Determine automation requirements and
integration. - Designate Theater-Committed Theater-Available
(Rotational) Force Structure. - Lay down the force in ARFORGEN by UIC by Force
Pool and by DEF/REF/CEF. - Execute the DARPL at UIC-level to drive
down-stream resource automation systems.
ACP DP 97(Knowledge Mgt)
ACP DP 98
ACP DP 99
FORSCOM
ACP DP 101
5ARORGEN Knowledge ManagementDP 97 and 98
Relationships
- DP 97 Goals and Tasks
- Determine ARFORGEN information requirements
- Authoritative data sources
- overall collaboration framework
- DP 98 Goals and Tasks
- Develop and integrate Data in Army automation
systems to support ARFORGEN knowledge management
6ARFORGEN Knowledge Management
ARFORGEN Planning Process
Goal Decision Superiority
- What are the strategic decisions in the ARFORGEN
and supporting processes? - What are the information requirements to make the
strategic decisions? - Who is responsible to generate knowledge to meet
information requirements? - What are the policies and automation procedures
to exchange information internal and external to
the Army?
Army Sourcing Laydown
2
1
3
Army Training Laydown
IRPL
ARFORGEN Synch Order
4
Capabilities Development Process
ARFORGEN Execution Process
Equip
8
5
DEPORD
7
Trained ReadyModularExpeditionary Forces
9
Train
Modernize New Capabilities
6
Man
CommandPlan
Presidents Budget
HQDA POMPriorities
12
11
10
HQDA Resource Process
7Army Decisions
ARFORGENPlanning Process
in the ARFORGEN Planning, Execution and Resource
Processes
- What are the global operational, support and
institutional requirements and priorities for
Army units? - Approve Integrated Requirements Priority List
(IRPL) (Lead G-3) - What are the assigned missions, sourcing
solutions and deployment sequence for Army units? - Recommend the Army Sourcing Laydown (Lead
FORSCOM ICW HQDA, ARNG, USAR, ASCCs, DRUs) - What are the training requirements and schedule
for Army units to meet mission requirements? - Recommend the Army Training Laydown (Lead
FORSCOM ICW HQDA, ARNG, USAR, ASCCs, DRUs) - How will the Army synchronize strategic planning,
resourcing and execution in ARFORGEN? - Approve ARFORGEN Synch Order including Ready For
What Resourced for What unit priorities in the
DARPL. (Lead G-3) - How will the Army equip units to meet mission
requirements? - Approve equipment distribution plans IAW Army
Equipping and Reuse Conference. (Lead G-8, ICW
AMC, G4, MEDCOM) - Approve equipment reset instructions. (Lead
G-8 ICW G-4, AMC, ASCCs, DRUs) - How will the Army man units to meet mission
requirements? - Approve Unit Authorization Documents (UAD).
(Lead G1) - How will the Army provide institutional training
support to units in ARFORGEN? - Approve unit priorities and the Structure Manning
Decision Review (SMDR) to resource institutional
training. (Lead G-3) - What units will deploy to meet COCOM
requirements? - Approve Unit Mobilization and Deployment Orders.
(Lead HQDA G-3)
1
2
3
4
5
ARFORGEN Execution Process
6
7
8
9
HQDA Resource Process
10
11
12
8ARFORGEN Decision Support Template
FY07
FY08
FY09
FY10
FY11
FY12
FY13
R-Day
Execute
Verify
Orient
Objective
Orient
Orient
AC Reset/Train
Ready
Available
Reset/Train
Ready
Available
Reset/Train
RC Reset/Train
Reset/Train
Reset/Train
Ready
Ready
Available
Reset/Train
Strategy
GFMB
GFMB
GFMB
GFMB
Global Force Requirements
1
1
ARFORGEN Planning Process
IRPL
IRPL
2
2
ASL
ASL
SourcingConf.
Tng Spt ResourcingConf
Operational SourcingSegment
OperationalSupportSourcingSegment
InstitutionalSupportSourcingSegment
SourcingConf.
Tng Spt ResourcingConf
Operational SourcingSegment
OperationalSupportSourcingSegment
InstitutionalSupportSourcingSegment
3
3
ATL
ATL
ARFORGENSynchGOSC
ARFORGENSynchGOSC
ARFORGEN Synch Order
ARFORGEN Synch Order
4
4
Unit Missions Sourcing Deployment Sequence Unit
Training Glide PathDARPL Unit Priorities
5
7
5
9
EQUIP(AERC)
INST.TRAINING(SMDR)
6
EQUIP(AERC)
8
Modernization
MAN(UAD)
ARFORGEN Execution Processes
MOB/DEP
10
Resource Requirements Organizing, Manning,
Equipping, Training, Sustaining, Installations
TAA
PMAD
CommandPlan
ARSTRUC
POM/Change Proposal BUILD
Army Budget Development
EOH POM Approval
Program/Budget Review
11
12
Review PEG/Army CMDRequirements
PresidentsBudgetSubmission
Army CMDBudgetSubmission
APPGAPGM
HQDA POMPriorities
Funding Letter
HQDA Resource Processes
9Global Force Requirements
1
Decision
- What are the global operational, operational
support and institutional support requirements
and priorities for Army units? (Timing MAR
SEP before ARFORGEN Sourcing Conference) - HQDA G-3/5/7 approves the Integrated Requirement
Priority List to drive the ARFORGEN sourcing
process. (Lead HQDA G-35 SS)
Information Requirements
Responsible Organization
What are COCOM operational requirements (CCDOR
contingency) and priorities for Army units? (Ex
named operations OPLANs)
HQDA G-35 SS ICW FORSCOM G-3, OSD, JS, JFCOM,
COCOMs, ASCCs, DRUs
What are the operational support requirements and
priorities for Army units? (Ex force
generation platforms, training support)
HQDA G-37 TR ICW FORSCOM G-3
What are the institutional support requirements
and priorities for Army units? (Ex tests,
evaluations, experiments)
HQDA G-37 CI ICW ACOMs, ASCCs, DRUs, JFCOM, JS,
OSD.
Army Policies and Existing Automation Procedures
- Army G-3 validates, integrates and prioritizes
global force requirements ICW SECDEF/GFM
guidance. - Army G-3 approves IRPL before each ARFORGEN
Sourcing Conference (SEP MAR). - Current format is Excel spreadsheet. Need to
input into AST and add IRF data for unit
requirements.
10Army Sourcing Laydown
2
Decision
- What are the assigned missions, sourcing
solutions and deployment sequence for Army Units?
(Timing MAY NOV ARFORGEN Synch GOSC) - Recommend the Army Sourcing Laydown. (Lead
FORSCOM ICW HQDA G-3, ARNG, USAR, ASCCs,
DRUs)Defines unit mission (DEF/REF/CEF) by UIC 3
years (AC) and 5-6 years (RC) before
execution.Defines unit deployment sequence by
UIC through Reset/Train, Ready, Available force
pools for AC RC units.
Information Requirements
Responsible Organization
- What is the location and manning, equipping,
training, readiness and dwell status of Army
units? - Assess Global Force Availability
Unit Commanders ? HQDA G33 OD (USR Data) ? FORSCOM
- What is the deployment sequence for AC, ARNG and
USAR Units? - Collaborative Sourcing Process
FORSCOM G-3 ICW ARNG, USAR, ASCCs, DRUs
What is the schedule for transformation
actions? Ex modular conversion, FCS
modernization, IGPBS/GDPR/BRAC-directed unit
moves.
HQDA G-3/5/7 ZT (Army Campaign Plan)
Army Policies and Automation Procedures
- Readiness sourcing data for Objective Orient
horizons (3-6 years out) is Army internal
knowledge. - Current format is PowerPoint/Excel. Need
automation to include below-the-line units by
UIC. - Need to exchange information between FORSCOM and
ARNG/USAR data management systems.
11Army Training Laydown
3
Decision
- What are the training requirements and schedule
for Army units to meet mission requirements?(Timi
ng MAY NOV ARFORGEN Synch GOSC) - Recommend the Army Training Laydown. (Lead
FORSCOM ICW HQDA G-3, ARNG, USAR, ASCCs, DRUs)
Information Requirements
Responsible Organization
- What are the unit missions, priorities, sourcing
solutions and deployment sequence (LAD) by UIC? - Army Sourcing Laydown (Unit Data)
FORSCOM G3 (Data in AST)
What are CTC and ETC capabilities and schedules?
FORSCOM G3 (Data in AST)
3
C
Army Policies and Automation Procedures
- Current format is PowerPoint/Excel. Need AST
automation to include below-the-line units by
UIC. - Need to exchange information between FORSCOM AST
and ARNG/USAR management systems.
12ARFORGEN Synch Order
4
Decision
- How will the Army synchronize strategic planning,
resourcing and execution in ARFORGEN?(Timing
JUN DEC following ARFORGEN Synch GOSC) - HQDA G-3/5/7 approves the ARFORGEN Synch Order.
(Lead HQDA G-37 FM)Validates the Army Sourcing
Laydown and Army Training Laydown the COP to
coordinate Army planning.Includes updating
Ready for What Resourced for What DARPL Unit
Priorities.
Information Requirements
Responsible Organization
- What are the prioritized unit missions, sourcing
solutions and deployment sequence by UIC? - Army Sourcing Laydown (Data in AST)
FORSCOM G3 (Data in AST)
- What are the training requirements and schedule
for Army units to meet mission requirements by
UIC? - Army Training Laydown (Data in AST)
FORSCOM G3 (Data in AST)
What additional guidance was provided during the
ARFORGEN Synch GOSC to focus execution or refine
the ARFORGEN process?
HQDA G-37 FM
Army Policies and Automation Procedures
- Need to migrate from PowerPoint Excel to an
Army automation system that will contain the
DARPL unit resource priorities (by UIC) and drive
downstream resource systems.
13Equipping Units in ARFORGEN
5
Decision
- How will the Army equip units to meet mission
requirements? (Timing JUN DEC AERC) - Approve equipment distribution plans IAW Army
Equipping and Reuse Conference (AERC). (Lead
HQDA G-8) - Approve equipment reset instructions. (Lead
HQDA G-8 ICW G-4, AMC, ASCCs, DRUs)
Information Requirements
Responsible Organization
- What are the DARPL Unit Priorities based on
mission and deployment sequence by UIC? - ARFORGEN Synch Order ? G-3 Flow Model?
HQDA G37 FM
- Provide the Armys force file and any MTOE
adjustments. - Provide POM / BES data
HQDA G37 FM HQDA G-8
- Provide accurate O/H data to data bases
- Provide updated production data into EQ4 data
base
HQDA G4 ASA(ALT)
Army Policies and Automation Procedures
14Manning Units in ARFORGEN
6
Decision
- How will the Army man units to meet mission
requirements? (Timing Semi-Annual UAD (or as
needed), Semi-Annual PMAD) - Approve the Unit Authorization Documents (UAD)
and Personnel Manning Authorization Document
(PMAD). (Lead HQDA G-1)
Information Requirements
Responsible Organization
HQDA G37 FM
- What are the DARPL Unit Priorities based on
mission and deployment sequence by UIC? - ARFORGEN Synch Order ? G-3 Flow Model?
- Timelines from FORSCOM ? Deployments, Training
synchronization - Capture all near term growth and structure
changes. - Grow the Army Surge Acceleration
FORSCOM
HQDA G37 FM
Army Policies and Automation Procedures
- TAA ?SAMAS ? TAADS ? CAUDB ? PMAD ? UAD
- HRC uses PMAD to populate their database
requirements ELIM, MOSLS, COPS
15Institutional Training Support
7
Decision
- How will the Army provide institutional training
support to units in ARFORGEN? (Timing JUN
DEC ARFORGEN Synch Order) - HQDA G-3/5/7 approve unit priorities for
institutional training support and the Structure
Manning Decision Review (SMDR). (Lead HQDA
G-37 TR)
Information Requirements
Responsible Organization
- What are the DARPL Unit Priorities based on
mission and deployment sequence by UIC? - ARFORGEN Synch Order ? G-3 Flow Model?
HQDA G37 FM
What are the quantitative training requirements
for institutional training support to meet
mission requirements?
HQDA G37 TR ICW FORSCOM TRADOC
3
C
Army Policies and Automation Procedures
16Mobilization Deployment Orders
8
Decision
- What units will deploy to meet COCOM
requirements? (Timing Continuous) - Approve Unit Mobilization and Deployment Orders.
(Lead HQDA G-33)
Information Requirements
Responsible Organization
- What is the manning, equipping, training,
readiness and dwell status of Army units? - Assess Global Force Availability
HQDA DAMO-ODR (USR data) (man/train/equip/readine
ss) HQDA DAMO-ODO (dwell, single source for
RE/DEPORDs) HQDA DAMO-ODM (Current)
(man/train/equip/readiness)
- What are the prioritized unit missions, sourcing
solutions and deployment sequence by UIC? - Army Sourcing Laydown (Unit Data)
FORSCOM G3
- What are the training requirements and schedule
for Army units to meet mission requirements by
UIC? - Army Training Laydown (Unit Data)
FORSCOM G3
Army Policies and Automation Procedures
- 1) HQDA policies for dwell (AAD and ADD and of
unit deployed construct for dwell determination)
ISO and clarification of Red Line Sourcing
Memorandum, 6JUL07 - 2) MOBCOP enterprise automated feedback to AST
for current manning, equipping, training, and
readiness status during post mobilization at FGP
via MOBCOP FGP Station Module ISO (ACP DP 66) - 3) HQDA policy for Supported ASCC to manage and
report AAD and ADD of units from AOR via SIPR web
appliation.
17Army Modernization and Fielding New DOTML
Capabilities
9
Decision
- How will the Army modernize and field new DOTML
capabilities to units in ARFORGEN? (Timing
MAY) - Approve priorities and plans to field new
equipment and capabilities to units in ARFORGEN.
(G-3/5/7 and G-8)
Information Requirements
Responsible Organization
- What are DEF/REF/CEF sourcing solutions by UIC 3
years (AC) and 5-6 years (RC) out? - DARPL to G8 to build equipping plans for new
equipment and capabilities
FORSCOM G3
What AC and RC units by UIC are planned to pass
through Reset/Train by each FY?
FORSCOM G3
Provide the DARPL to G8 to build equipping plans
for new equipment and capabilities. What
capabilities should be fielded in the Reset Pool?
In the Ready or Available Pool?
C
Army Policies and Automation Procedures
18Army Force Structure
10
Decision
- What capabilities in what quantities are needed
to meet global force requirements? (Timing
MAY) - HQDA G-3/5/7 approves the Army Structure Message
(ARSTRUC) in and Army Command Plan and Force
Lock. (Lead HQDA G-37 FM)
Information Requirements
Responsible Organization
What is the strategic guidance to balance
strategic and operational risk between rotational
and contingency requirements?
EOH and HQDA G-3/5/7
- What are the global force requirements, unit
missions and sourcing solutions 6 years out? - Integrate ARFORGEN OA demand in TAA.
FORSCOM G3 (Data in AST)
What are the HD/LD units with faster burn rates?
FORSCOM G3
Army Policies and Automation Procedures
- Publication of Army Structure Message
- SACS Production
- MTOE Publication
19Army Budget and Program Submissionfor the
Presidents Budget
11
Decision
- What resources are required to prepare Army units
to meet mission requirements? (Timing JAN) - Approve Army budget and program for submission
with the Presidents Budget. (Lead 3 Kings)
Information Requirements
Responsible Organization
What are the Organizing, Manning, Equipping,
Training, Sustaining and Installation
requirements to support Force Generation?
PEG Leaders
What are the Army Command, ASCC and DRU
requirements to execute the ARFORGEN process?
Army Command, ASCC and DRU Commanders
3
C
Army Policies and Automation Procedures
20HQDA Priorities and Resource Allocation
12
Decision
- What resources will be provided to Army Commands,
ASCCs and DRUs? (Timing MAY) - HQDA POM Priorities (Lead EOH) and resource
allocation to subordinate units (Lead 3 Kings).
Information Requirements
Responsible Organization
1
A
2
B
3
C
Army Policies and Automation Procedures
21ARFORGEN KM Responsibilities
ORGANIZATION
NEED TO KNOW (From)
NEED TO PROVIDE INFO (To)
UNIT COMMANDERS
- Whats my mission? (FC)
- When does my unit deploy? (FC)
- Readiness Data via USR (P, S, R, T, C) (FC G3)
- Unit missions, sourcing solutions and deployment
sequence by UIC 1-6 years out. (G3, G1, G4, G8,
TRADOC, AMC) - Unit training requirements and schedules. (All)
- What are the prioritized requirements? (G3)
- What is the current status of units? (CDRs)
- What are projections to man equip units? (G1
G8)
FORSCOM
- What are missions, sourcing solutions and
deployment sequence by UIC 1-6 years out? (FC) - Unit training requirements and schedules. (FC)
- What are projections to man equip units? (G1
G8)
- Prioritized Global Force Requirements. (FC)
- Unit Resource Priorities. (G1, G4, G8)
- ARSTRUC. (All)
- Training Requirements ? PEG.
HQDA G-3
- Unit Authorization Documents (UAD).
- Unit Manning Projections. (FC, G-3)
- Army Sourcing Training Laydowns? (FC)
- Unit Resource Priorities. (G-3)
HQDA G-1
- Army Sourcing Training Laydowns? (FC)
- Unit Resource Priorities. (G-3)
HQDA G-4
- Army Sourcing Training Laydowns? (FC)
- Unit Resource Priorities. (G-3)
- Equipment Distribution Plans. (FC, G-3, G-4,
AMC) - Unit Equipment Projections. (FC, G-3)
- Equipment Requirements ? PEG.
HQDA G-8
- Army Sourcing Training Laydowns? (FC)
- Unit Resource Priorities. (G-3)
- Reset Guidance. (G-4)
- Equipment reset status projections. (FC, G-3,
G-8)
AMC
- Army Sourcing Training Laydowns? (FC)
- Unit Resource Priorities. (FC)
TRADOC
22ACP CO/MO
DP 98 / ARFORGEN Automation Integration
1-5
Lead G3/5/7 DAMO-CIA PROJ Date Dec
2007 Assist HQDA, Army Commands, ASCCs, DRUs
Scheduled Date 29 Mar 2007
Issues / Obstacles
Narrative Description
- Basic concept of ARFORGEN Knowledge Management.
- The formal process to deconflict, prioritize and
fund ARFORGEN automation requirements. - How will the Army drive unclassified downstream
automation systems?
Develop the policies, requirements and
organizational responsibilities to develop and
integrate data in Army automation systems to
support ARFORGEN Knowledge Management.
Scope Major Tasks / Elements
- Conduct mission analysis.
- Incorporate ACP DP 97 (ARFORGEN Knowledge
Management). - Determine the context for ARFORGEN Automation
within the context of Army/Joint enterprise-level
systems and decision-making processes. - Determine the purpose, requirements, resourcing
plans, certification standards, execution
policies and timeline to develop and implement
the ARFORGEN Synchronization Tool. - Determine the Army authoritative data sources and
the technical means to integrate them to support
ARFORGEN decision-making. - Determine the way ahead to complete the ARFORGEN
Force Laydown in AST and apply the DARPL on a
fully-automated basis. - Incorporate the findings from the Consortium for
Analysis, Modeling and Simulation (CAAMS) to
refine AI process
Decision Forum(s) - Way Ahead
- ARFORGEN GOSC 23 Mar 2007 (Drilldown)
- ACP CoC 26 Mar 2007 (Drilldown)
- ACP ASM 29 Mar 2007 (Approve Drilldown)
Current Status
STRATCOMM
- FORSCOM has developed an initial version of the
ARFORGEN Synchronization Tool. - ACP DP 68 (ARFORGEN Implementation Plan)
introduced the concept of ARFORGEN Automation
Integration. - ACP DP 97 Drill Down briefed to US Army Vice
Chief of Staff 21 Sep 06.
- Develop Command Info to build support for
automation requirements in ARFORGEN
Proceed as written Proceed IAW guidance
Adjust
23BACK-UP
24(No Transcript)
25Equipping Process Map
26Manning Process Map
27ARFORGEN KM Framework
HQDA G-3
FORSCOM G-3
Global ForceRequirements Priorities
Army Sourcing Laydown - DEF/REF/CEF by UIC
1-6 years out - Unit Deployment Sequence
LADs
1
2
FST
HQDA G-3
FORSCOM G-3
Mobilization Deployment
Army Training Laydown - Training Schedules
8
3
MDIS
AST
HQDA G-3
HQDA G-1
Inst. Training Spt. - Unit Priorities
7
AST
6
Man Units
???
???
TRADOC
???
HQDA G-8
HQDA G-3
5
Equip Units
ARFORGEN Synch Order
4
EquipFor
Unit Resource Priorites
?
3 Kings
HQDA G-3 G-8
AMC
12
11
HQDA G-3
9
Reset
Army Budget Subm. HQDA POM Priorities
10
Modernize Field DOTMLPFSolutions
???
???
???
Downstream Resource Systems
ARSTRUC
SAMAS
28Knowledge Management Construct
Enterprise Portal What knowledge does my process
/ tools produce for the Army and what knowledge
do I need to consume from someone elses process
/ tool
Role-Identity Management Automates process of
managing users and applications
Manning/Equipping/Resourcing/Training/Synchronizat
ion -The Army will use force pools in addition
to mission requirements to prioritize resources
over time and synchronize unit manning,
equipping, resourcing and training. -The goal of
ARFORGEN KM / AI improves planning and
Synchronization in phase 2 (Bridging State) and
phase 3 (Objective State).
Extract-Transform-Load Provides the
intelligence to read information from designated
authoritative sources, format clean data, and
send data to the intended target system in a
heterogeneous system environment
Data Zone Integrate data not systems focus on
how the data, which needs to be generated and/or
consumed, is gathered and exchanged between
systems / tools rather than providing direct
connections between systems
The construct provides knowledge management,
data integration and automation capabilities
specifically for ARFORGEN
29ARFORGEN KM Working Groups
ARFORGEN Knowledge Management IPT (KM IPT)
Consortium for ARFORGEN Analysis Modeling and
Simulation (CAAMS)
Operators
Members G1, G3/5/7, G4, G6, G8, HRC, NGB, OCAR,
FORSCOM, TRADOC, USAR, AMC, ASCC
Members Chair G3/5/7, DAMO-CI Co-Chair
FORSCOM, AFOP-PLA Analyst from G1, G3/5/7, G4,
G6, G8, HRC, NGB, OCAR, FORSCOM, TRADOC, USAR, CAA
- Focus
- Identify information consumers.
- Develop specific information requirement.
- Clarify purpose of information (i.e., a
decision). - Assign responsibility to collect the
information. - Establish timeline to provide information based
on decision timeline. - Establish Policy and Procedures
- Focus
- Facilitates cooperation within a governance
structure to produce a holistic-flexible Army
automation platform supporting ARFORGEN
operational functions in achieving decision
superiority - ICW Knowledge Management
- ICW Automation Integration
- ICW Lean Six Sigma
- Identify
- data management
- information product requirements
- decision support tools along with proposed
solutions to integrate synchronize the process - Applies grants (funding) to member proposals
for enhancement / integration / synchronization
of existing capabilities rather than fund from
scratch development
30Knowledge Management WAY AHEAD
KM IPT
Convene Initial Work Group consisting of
FORSCOM, DAMO-ZT
Identify DP 97 task and way ahead
Operators
CAAMS
Chair G3/5/7 DAMO CI
DCS G1, G3/5/7, G4, G6, G8
ID KM Consumers
FORSCOM
Vice Chair FORSCOM AFOP-PLA
HRC
DCS G1, G3/5/7, G4, G6, G8
KM IPT
NGB
NGB
Policy and Procedures
OCAR
OCAR
USAR
USAR
Incorporate DP 97 into DP 98 Automation
Integration
Update VCSA
CAA
CAA
Complete Documentation
TRADOC
TRADOC
Assign responsibility to collect information
ARFORGEN GOSC Validation
HRC
AMC
ASCC
AMC
Adjust Strategy
VCSA Validation
Clarify purpose of Information
Develop KM goals and strategy
Update ARFORGEN GOSC
Develop Specific Information Requirements
Execute
Task Complete
Task On Going