Title: Work Request


1
QUAD CHART
Work Request _____________________ POC
_____________________________________ Unit/
Agency ______________________________ Facility
_______________________________
Alternatives
Requirements/Scope of Work
Cost/ Risk Pros/Cons Environmental
Considerations
Recommendation Risk Management
2
Quad Chart Instructions
  • The quad chart format will be used to validate
    all work orders. The unit or agency is
    responsible for completing this chart with the
    best information available. The quad chart will
    be a one page document basically following the
    format provided by the DPW.
  • The upper left quad is self explanatory for the
    information elements required. The scope of work
    should be in sufficient detail as to ensure
    proper work classification (repair, maintenance,
    and new work), intended end state or product, and
    specific location of the work. The requirement/
    justification should also be included in this
    block (i.e., mission driver, laws, regulations,
    etc.).
  • The Alternatives block will explain in bullet
    form what other options are available to get this
    work done or what work arounds might be
    available. The impacts to mission should also be
    addressed like cost, time, manpower and
    resources. Bullets need to be succinct and
    informative.
  • The lower left block will explain the costs/risk
    for the project. Cost should be an estimate the
    DPW facility manager can assist the unit to
    determine. The risk should compliment what was
    described in the alternative block. In the risk
    analysis the cost of potential future repairs or
    maintenance need to be estimated if the work is
    not performed. Pros/cons should succinctly lay
    out a comparison of the alternatives available.
    If environmental considerations need to be
    factored in the decision, then they need to be
    outlined in this block.
  • The lower right block is not to just rubber stamp
    the need for the project but to recommend when
    and how the best alternative should be
    implemented. It is presumed the project is
    desired thus the completion of the quad chart.
    What is being recommended is the priority of the
    project, the funding source and when it needs to
    be done. The risk management portion should
    outline what needs to be done to maintain current
    state if the project is not approved and what
    measures will be needed in the future. The risks
    identified earlier should be addressed